INDOT contract R-43888-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on November 13, 2025, Switzerland, Seymour. 7 bids received; low bid $627,000 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 13 NOV 2025
- Pay items
- 60
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $627,000 | Low |
| 2 | Olco Inc | $638,546 | +2.0% |
| 3 | Dave Omara Contractor Inc | $664,539 | +6.0% |
| 4 | 5 Star Company Inc | $689,765 | +10% |
| 5 | Paul H Rohe Company Inc | $754,530 | +20% |
| 6 | Paf Construction, LLC | $862,184 | +38% |
| 7 | Sunesis Construction Company | $1,040,894 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. Olco Inc | 3. Dave Omara Contractor Inc | 4. 5 Star Company Inc | 5. Paul H Rohe Company Inc | 6. Paf Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $7,500.00 | $10,988 | $9,800.00 | $20,000 | $8,900.00 | $45,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $31,350 | $12,091 | $33,227 | $46,000 | $27,057 | $25,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $12,540 | $10,805 | $13,291 | $14,000 | $22,735 | $35,000 |
| 0012 | Present structure, remove, structure no. 250-078-53.15 (202-51330) | LS | 1 | $10,000 | $18,482 | $17,600 | $10,500 | $32,325 | $30,000 |
| 0013 | Present structure, remove, structure no. CV 250-078-51.40 (202-51330) | LS | 1 | $10,000 | $9,775.00 | $12,000 | $10,000 | $23,310 | $18,000 |
| 0014 | Excavation, common (203-02000) | CYS | 255 | $60.00 | $44.69 | $44.00 | $60.00 | $120.00 | $75.00 |
| 0015 | Borrow (203-02070) | CYS | 140 | $20.00 | $83.21 | $35.00 | $20.00 | $110.00 | $80.00 |
| 0016 | Pump around (205-11626) | EACH | 2 | $7,500.00 | $7,716.71 | $9,000.00 | $5,800.00 | $6,700.00 | $15,000 |
| 0017 | Stormwater management budget (205-12108) | DOL | 16,713 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $1,000.00 | $6,090.81 | $6,000.00 | $4,500.00 | $1,500.00 | $31,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 638 | $50.00 | $56.74 | $46.00 | $37.00 | $62.00 | $65.00 |
| 0020 | Structure backfill, type 2 (211-09265) | CYS | 12 | $140.00 | $121.70 | $120.00 | $65.00 | $160.00 | $200.00 |
| 0021 | Structure backfill, type 5 (211-09268) | CYS | 287 | $200.00 | $248.24 | $260.00 | $180.00 | $200.00 | $235.00 |
| 0022 | Geotextile for pavement, type 2A (214-12238) | SYS | 222 | $5.00 | $4.40 | $5.25 | $5.00 | $6.00 | $10.00 |
| 0023 | Geotextile for pavement, type 2B (214-12239) | SYS | 673 | $5.00 | $5.00 | $5.25 | $5.00 | $4.50 | $7.00 |
| 0024 | Compacted aggregate, no. 5 (301-12232) | CYS | 18 | $130.00 | $112.91 | $115.00 | $55.00 | $180.00 | $175.00 |
| 0025 | Compacted aggregate, no. 8 (301-12233) | CYS | 6 | $200.00 | $154.11 | $115.00 | $55.00 | $200.00 | $225.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 84 | $50.00 | $64.49 | $52.00 | $40.00 | $100.00 | $110.00 |
| 0027 | Widening with HMA, type B (304-07493) | TON | 86 | $300.00 | $183.91 | $225.00 | $200.00 | $260.00 | $275.00 |
| 0028 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 347 | $20.00 | $16.87 | $10.00 | $17.00 | $20.00 | $13.50 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 75 | $150.00 | $208.93 | $225.00 | $175.00 | $240.00 | $300.00 |
| 0030 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 48 | $150.00 | $213.53 | $225.00 | $160.00 | $230.00 | $275.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 119 | $150.00 | $192.67 | $225.00 | $145.00 | $220.00 | $200.00 |
| 0032 | Joint adhesive (401-11526) | LFT | 805 | $1.00 | $1.67 | $1.00 | $1.00 | $1.00 | $2.00 |
| 0033 | Asphalt for tack coat (406-05521) | SYS | 2,351 | $0.50 | $0.86 | $0.50 | $1.00 | $0.55 | $0.50 |
| 0034 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 2 | $1,000.00 | $2,668.46 | $3,500.00 | $1,500.00 | $4,200.00 | $3,000.00 |
| 0035 | Guardrail, remove (601-02241) | LFT | 250 | $5.00 | $20.20 | $8.50 | $15.00 | $18.00 | $60.00 |
| 0036 | Right-of-way marker (615-06490) | EACH | 10 | $350.00 | $353.50 | $400.00 | $365.00 | $350.00 | $225.00 |
| 0037 | Monument, type B (615-06505) | EACH | 4 | $1,500.00 | $1,515.00 | $1,750.00 | $1,600.00 | $1,500.00 | $525.00 |
| 0038 | Riprap, class 1 (616-05688) | TON | 93 | $130.00 | $75.52 | $98.00 | $80.00 | $130.00 | $200.00 |
| 0039 | Riprap, revetment (616-06405) | TON | 59 | $130.00 | $64.55 | $90.00 | $60.00 | $150.00 | $175.00 |
| 0040 | Riprap, uniform (616-06451) | TON | 43 | $130.00 | $66.09 | $90.00 | $61.00 | $180.00 | $175.00 |
| 0041 | Geotextile for riprap, type 1A (616-12246) | SYS | 348 | $5.00 | $3.15 | $5.25 | $5.00 | $4.00 | $5.00 |
| 0042 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $1,000.00 | $320.01 | $1,100.00 | $3,500.00 | $1,000.00 | $1,000.00 |
| 0043 | Mulched seeding, type R (621-06559) | SYS | 1,043 | $8.00 | $3.28 | $3.25 | $3.50 | $3.00 | $4.75 |
| 0044 | Sodding (621-06574) | SYS | 51 | $50.00 | $15.53 | $28.00 | $5.00 | $25.00 | $25.00 |
| 0045 | Sodding, nursery (621-06575) | SYS | 180 | $13.00 | $14.17 | $28.00 | $5.00 | $25.00 | $25.00 |
| 0046 | Field office, type C (628-09403) | MOS | 12 | $2,000.00 | $864.00 | $2,000.00 | $1,900.00 | $3,350.00 | $3,500.00 |
| 0047 | Computer system equipment (628-11976) | EACH | 2 | $1,000.00 | $553.00 | $550.00 | $350.00 | $850.00 | $1,750.00 |
| 0048 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,584 | $5.00 | $6.78 | $6.00 | $3.45 | $4.20 | $5.50 |
| 0049 | Waterproofing membrane, type 3 (714-000087) | SFT | 572 | $10.00 | $7.66 | $11.00 | $12.00 | $9.00 | $5.50 |
| 0050 | Structure, coated reinforced concrete, box sections, 11 FT X 9 FT (714-000181) | LFT | 44 | $3,100.00 | $3,598.30 | $3,325.00 | $3,700.00 | $3,290.00 | $2,750.00 |
| 0051 | Structure, coated reinforced concrete, box sections, 5 FT X 3 FT (714-12499) | LFT | 44 | $1,500.00 | $1,573.09 | $1,320.00 | $1,855.00 | $1,440.00 | $2,150.00 |
| 0052 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 39 | $70.00 | $144.85 | $94.00 | $35.00 | $220.00 | $145.00 |
| 0053 | Road closure sign assembly (801-04308) | EACH | 14 | $175.00 | $176.75 | $450.00 | $180.00 | $175.00 | $300.00 |
| 0054 | Detour route marker assembly (801-06625) | EACH | 45 | $85.00 | $75.75 | $125.00 | $80.00 | $75.00 | $100.00 |
| 0055 | Construction sign, type A (801-06640) | EACH | 14 | $175.00 | $146.45 | $225.00 | $150.00 | $145.00 | $180.00 |
| 0056 | Maintaining traffic (801-06775) | LS | 1 | $17,521 | $5,327.00 | $2,112.27 | $50,000 | $13,890 | $7,000.00 |
| 0057 | Barricade, type III-A (801-07118) | LFT | 48 | $17.00 | $15.15 | $13.50 | $16.00 | $15.00 | $21.00 |
| 0058 | Barricade, type III-B (801-07119) | LFT | 144 | $17.00 | $16.16 | $13.50 | $17.00 | $16.00 | $18.00 |
| 0059 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 610 | $1.00 | $1.11 | $3.50 | $1.50 | $1.10 | $1.50 |
| 0060 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 610 | $1.00 | $1.11 | $3.50 | $1.50 | $1.10 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 13, 2025. Compiled by Mirage Metrics.