Sunesis Construction Company submitted 56 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 9 of them (16%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $28,377,408
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 10 | 1 | 10% |
| 2023 | 7 | 3 | 43% |
| 2024 | 23 | 5 | 22% |
| 2025 | 12 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 54 | 9 | 17% |
| Greenfield | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 55 | 55 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 55 | 55 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 55 | 55 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 53 | 53 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 51 | 51 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 50 | 50 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 48 | 48 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 36 | 36 (100%) | $1.00 | $1.00 |
| Project estimate adjustment | 109-08463 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Liquid asphalt sealant | 401-11785 | LFT | 31 | 14 (45%) | $0.55 | $0.40 |
| Joint adhesive, surface | 401-10258 | LFT | 39 | 13 (33%) | $0.75 | $0.75 |
| Joint adhesive, intermediate | 401-10259 | LFT | 37 | 13 (35%) | $0.96 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Paul H Rohe Company Inc | 40 | 26 of 40 |
| Dave Omara Contractor Inc | 35 | 22 of 35 |
| Milestone Contractors LP | 33 | 15 of 33 |
| Force Construction Co Inc | 26 | 14 of 26 |
| Morphey Construction Inc. | 21 | 8 of 21 |
| Beaty Construction Inc | 21 | 10 of 21 |
| Olco Inc | 17 | 14 of 17 |
| 5 Star Company Inc | 12 | 12 of 12 |
| E & B Paving LLC | 7 | 3 of 7 |
| Ragle, Inc. | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-43366-A | Seymour | SLIDE CORRECTION | 2 of 3 | $1,383,136 | +5.0% |
| 08 JUL 2026 | R-43365-A | Seymour | SLIDE CORRECTION, SMALL STRUCTURE AND DRAINS CONSTRUCTION | 3 of 6 | $2,545,607 | +7.0% |
| 08 APR 2026 | B-40891-A | Seymour | BRIDGE REPLACEMENT | 4 of 7 | $1,603,388 | +12% |
| 14 JAN 2026 | B-40892-A | Seymour | BRIDGE REPLACEMENT | 5 of 7 | $2,399,273 | +13% |
| 10 DEC 2025 | R-43788-A | Seymour | SMALL STRUCTURE REPLACEMENT | 8 of 8 | $659,746 | +42% |
| 13 NOV 2025 | R-43888-A | Seymour | SMALL STRUCTURE REPLACEMENT | 7 of 7 | $1,040,894 | +66% |
| 10 SEP 2025 | R-43739-A | Seymour | SMALL STRUCTURE REPLACEMENT | 10 of 10 | $3,627,509 | +62% |
| 10 SEP 2025 | B-46151-A | Seymour | SMALL STRUCTURE REPLACEMENT | 4 of 6 | $429,240 | +59% |
| 06 AUG 2025 | R-43751-A | Seymour | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 7 of 8 | $765,694 | +37% |
| 06 AUG 2025 | B-43770-A | Seymour | REPLACE SUPERSTRUCTURE | 3 of 6 | $1,857,427 | +16% |
| 09 JUL 2025 | R-42801-A | Seymour | BIKE AND PEDESTRIAN FACILITIES | 3 of 6 | $3,061,772 | +9.0% |
| 09 JUL 2025 | R-43164-A | Seymour | SLIDE CORRECTION | 7 of 9 | $2,779,680 | +16% |
| 09 JUL 2025 | B-42888-A | Seymour | BRIDGE DECK REPLACEMENT | 4 of 4 | $2,577,994 | +34% |
| 12 MAR 2025 | R-41447-A | Seymour | SMALL STRUCTURE REPLACEMENT | 6 of 6 | $4,382,845 | +51% |
| 12 FEB 2025 | B-43328-A | Seymour | SCOUR PROTECTION (EROSION) | 3 of 6 | $243,051 | +28% |
| 15 JAN 2025 | R-43394-A | Seymour | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 2 of 6 | $892,585 | +40% |
| 11 DEC 2024 | R-43301-A | Seymour | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 6 of 6 | $2,417,949 | +56% |
| 11 DEC 2024 | R-43367-A | Seymour | SLIDE CORRECTION | 3 of 4 | $1,643,283 | +30% |
| 11 DEC 2024 | B-42791-A | Greenfield | BRIDGE REPLACEMENT | 3 of 4 | $1,680,872 | +20% |
| 11 DEC 2024 | B-44952-A | Seymour | BRIDGE AND SMALL STRUCTURE REPLACEMENT | 5 of 5 | $2,404,951 | +41% |
| 11 DEC 2024 | B-45320-A | Seymour | BRIDGE DECK OVERLAY | 3 of 3 | $1,788,337 | +14% |
| 14 NOV 2024 | R-39881-A | Seymour | SLIDE CORRECTION | 4 of 7 | $2,361,051 | +21% |
| 14 NOV 2024 | R-43368-A | Seymour | SMALL STRUCTURE REPLACEMENT | 6 of 8 | $1,961,737 | +42% |
| 14 NOV 2024 | B-41931-A | Seymour | BRIDGE REPLACEMENT | 1 of 5 | $1,257,797 | Low, 0.0% under the second |
| 14 NOV 2024 | B-43546-A | Greenfield | BRIDGE DECK REPLACEMENT | 4 of 4 | $1,560,289 | +50% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.