INDOT contract R-41447-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on March 12, 2025, Jefferson, Jennings, Seymour. 6 bids received; low bid $2,910,000 by Dave Omara Contractor Inc.
- Owner
- Indiana DOT
- Letting
- 12 MAR 2025
- Pay items
- 99
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dave Omara Contractor Inc | $2,910,000 | Low |
| 2 | Force Construction Co Inc | $2,967,727 | +2.0% |
| 3 | Paul H Rohe Company Inc | $2,988,510 | +3.0% |
| 4 | E & B Paving LLC | $3,840,000 | +32% |
| 5 | Milestone Contractors LP | $3,855,900 | +33% |
| 6 | Sunesis Construction Company | $4,382,845 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dave Omara Contractor Inc | 2. Force Construction Co Inc | 3. Paul H Rohe Company Inc | 4. E & B Paving LLC | 5. Milestone Contractors LP | 6. Sunesis Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $25,960 | $45,814 | $46,480 | $100,000 | $37,212 | $55,825 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $140,519 | $397,701 | $132,140 | $190,000 | $193,000 | $120,571 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $30,000 | $25,113 | $48,745 | $103,852 | $141,250 | $46,708 |
| 0012 | Present structure, remove, structure no. CV 003-040-40.10 (202-51330) | LS | 1 | $130,000 | $128,414 | $31,285 | $85,000 | $80,000 | $55,642 |
| 0013 | Present structure, remove, structure no. CV 007-039-03.75 (202-51330) | LS | 1 | $40,000 | $16,278 | $41,020 | $155,000 | $273,000 | $45,265 |
| 0014 | Present structure, remove, structure no. CV 007-039-04.85 (202-51330) | LS | 1 | $40,000 | $16,561 | $46,840 | $155,000 | $80,000 | $42,883 |
| 0015 | Concrete wall, remove (202-96035) | LFT | 40 | $100.00 | $161.50 | $140.00 | $110.00 | $129.00 | $94.69 |
| 0016 | Pipe, remove (202-96133) | LFT | 99 | $50.00 | $38.50 | $60.00 | $25.00 | $46.90 | $56.93 |
| 0017 | Excavation, common (203-02000) | CYS | 954 | $80.00 | $94.88 | $36.00 | $69.00 | $120.00 | $31.80 |
| 0018 | Excavation, rock (203-02010) | CYS | 187 | $170.00 | $77.83 | $150.00 | $205.00 | $608.00 | $242.78 |
| 0019 | Borrow (203-02070) | CYS | 4,158 | $15.00 | $37.58 | $78.00 | $50.00 | $6.00 | $71.55 |
| 0020 | Pump around (205-11626) | EACH | 3 | $52,000 | $13,002 | $30,550 | $9,000.00 | $27,023 | $23,905 |
| 0021 | Stormwater management budget (205-12108) | DOL | 75,028 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0022 | Stormwater management implementation (205-12616) | LS | 1 | $41,000 | $9,927.39 | $3,500.00 | $43,000 | $16,809 | $12,191 |
| 0023 | Excavation, X (206-51215) | CYS | 76 | $170.00 | $157.96 | $102.00 | $410.00 | $255.00 | $184.31 |
| 0024 | Excavation, foundation, unclassified (206-51230) | CYS | 641 | $45.00 | $47.23 | $55.00 | $65.00 | $51.80 | $56.26 |
| 0025 | Subgrade treatment, type II (207-08264) | SYS | 197 | $25.00 | $36.58 | $44.00 | $45.00 | $38.10 | $56.09 |
| 0026 | Subgrade treatment, type IC (207-09935) | SYS | 2,951 | $45.00 | $41.48 | $40.00 | $60.00 | $48.20 | $81.37 |
| 0027 | Aggregate for end bent backfill (211-06467) | CYS | 407 | $80.00 | $93.36 | $74.00 | $80.00 | $120.00 | $229.29 |
| 0028 | Structure backfill, type 2 (211-09265) | CYS | 1,729 | $170.00 | $97.46 | $68.00 | $45.00 | $213.00 | $140.28 |
| 0029 | Geogrid, type IB (214-11796) | SYS | 1,047 | $2.00 | $4.19 | $3.50 | $2.00 | $2.85 | $4.66 |
| 0030 | Geotextile for pavement, type 2B (214-12239) | SYS | 382 | $4.00 | $6.60 | $5.50 | $4.00 | $15.20 | $7.67 |
| 0031 | Compacted aggregate, no. 5 (301-12232) | CYS | 32 | $100.00 | $122.85 | $120.00 | $170.00 | $241.00 | $213.60 |
| 0032 | Subbase for PCCP (302-06464) | CYS | 95.80 | $120.00 | $121.02 | $130.00 | $130.00 | $236.00 | $218.53 |
| 0033 | Compacted aggregate, no. 53 (303-01180) | TON | 757 | $40.00 | $45.35 | $50.00 | $70.00 | $61.30 | $95.79 |
| 0034 | Widening with HMA, type B (304-07493) | TON | 142 | $170.00 | $233.02 | $148.00 | $160.00 | $272.00 | $191.42 |
| 0035 | Widening with HMA, type C (304-07494) | TON | 634 | $170.00 | $143.83 | $115.00 | $112.00 | $163.00 | $161.20 |
| 0036 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,007 | $7.00 | $6.52 | $3.80 | $10.00 | $11.60 | $5.45 |
| 0037 | Milling, transition (306-08043) | SYS | 1,669 | $7.00 | $7.60 | $4.00 | $10.00 | $7.95 | $5.85 |
| 0038 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 511 | $170.00 | $211.81 | $160.00 | $200.00 | $193.00 | $209.56 |
| 0039 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 227 | $170.00 | $137.68 | $155.00 | $130.00 | $207.50 | $206.53 |
| 0040 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 404 | $170.00 | $111.20 | $145.00 | $105.00 | $150.00 | $203.51 |
| 0041 | Joint adhesive, surface (401-10258) | LFT | 4,749 | $0.50 | $0.01 | $3.00 | $0.01 | $1.25 | $0.55 |
| 0042 | Joint adhesive, intermediate (401-10259) | LFT | 2,278 | $0.50 | $0.01 | $4.25 | $0.01 | $1.75 | $0.91 |
| 0043 | Asphalt for tack coat (406-05521) | SYS | 5,845 | $0.50 | $0.37 | $0.50 | $0.35 | $0.25 | $0.52 |
| 0044 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $2,500.00 | $1,059.05 | $13,500 | $1,000.00 | $6,050.00 | $5,541.15 |
| 0045 | Guardrail terminal system, W-beam curved, type 6 (601-01839) | EACH | 2 | $3,000.00 | $3,065.94 | $3,000.00 | $3,500.00 | $3,000.00 | $3,526.19 |
| 0046 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 1 | $2,700.00 | $3,065.94 | $2,700.00 | $3,200.00 | $2,700.00 | $3,223.94 |
| 0047 | Guardrail, remove (601-02241) | LFT | 743 | $11.00 | $6.35 | $11.00 | $8.00 | $11.00 | $8.06 |
| 0048 | Guardrail terminal system, W-beam curved, type 7 (601-05071) | EACH | 1 | $3,500.00 | $3,150.66 | $3,500.00 | $3,600.00 | $3,500.00 | $3,626.93 |
| 0049 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,125 | $20.00 | $21.18 | $20.00 | $25.00 | $20.00 | $25.19 |
| 0050 | Guardrail, MGS, long span, type 2 (601-12288) | EACH | 4 | $1,700.00 | $1,694.48 | $1,700.00 | $2,574.00 | $1,700.00 | $2,593.26 |
| 0051 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $850.00 | $953.14 | $850.00 | $1,414.00 | $850.00 | $1,424.58 |
| 0052 | Guardrail end treatment, type OS (601-94689) | EACH | 8 | $3,000.00 | $3,309.52 | $3,000.00 | $3,495.00 | $3,000.00 | $3,521.15 |
| 0053 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 2,367 | $1.06 | $1.19 | $3.44 | $2.49 | $8.70 | $5.11 |
| 0054 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 347 | $200.00 | $210.22 | $174.00 | $265.00 | $208.00 | $282.66 |
| 0055 | HMA for approaches, type B (610-07487) | TON | 42 | $170.00 | $222.40 | $220.00 | $210.00 | $262.00 | $292.17 |
| 0056 | Mailbox assembly, triple (611-02825) | EACH | 1 | $400.00 | $953.14 | $400.00 | $946.00 | $400.00 | $953.08 |
| 0057 | Mailbox assembly, reset, single (611-08232) | EACH | 3 | $250.00 | $317.71 | $250.00 | $315.00 | $250.00 | $317.36 |
| 0058 | Right-of-way marker (615-06490) | EACH | 25 | $180.00 | $185.33 | $180.00 | $184.00 | $180.00 | $185.38 |
| 0059 | Monument, type B (615-06505) | EACH | 8 | $1,025.00 | $1,053.75 | $1,025.00 | $1,037.00 | $1,025.00 | $1,044.76 |
| 0060 | Riprap, class 1 (616-05688) | TON | 456 | $80.00 | $80.98 | $96.00 | $65.00 | $89.60 | $140.91 |
| 0061 | Riprap, revetment (616-06405) | TON | 175 | $60.00 | $63.65 | $65.00 | $60.00 | $88.00 | $81.05 |
| 0062 | Riprap, uniform (616-06451) | TON | 198 | $70.00 | $60.75 | $130.00 | $60.00 | $85.70 | $95.54 |
| 0063 | Geotextile for riprap, type 1A (616-12246) | SYS | 312 | $2.50 | $5.94 | $7.00 | $2.00 | $3.05 | $5.72 |
| 0064 | Geotextile for riprap, type 2B (616-12249) | SYS | 1,055 | $3.25 | $5.54 | $6.00 | $3.00 | $5.95 | $6.22 |
| 0065 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $500.00 | $529.52 | $500.00 | $1,000.00 | $500.00 | $503.74 |
| 0066 | Erosion control blanket (621-02770) | SYS | 2,722 | $1.75 | $1.85 | $1.75 | $2.25 | $1.75 | $5.02 |
| 0067 | Mulched seeding, type R (621-06559) | SYS | 1,725 | $3.00 | $3.18 | $3.00 | $0.75 | $3.00 | $6.24 |
| 0068 | Mulched seeding, type U (621-06560) | SYS | 2,954 | $1.50 | $1.59 | $1.50 | $0.50 | $1.50 | $3.47 |
| 0069 | Sodding (621-06574) | SYS | 801 | $9.00 | $9.53 | $9.00 | $7.00 | $9.00 | $12.04 |
| 0070 | Computer system equipment (628-11976) | EACH | 3 | $900.00 | $847.24 | $915.00 | $700.00 | $622.00 | $3,154.33 |
| 0071 | Field office, type D (628-12683) | MOS | 18 | $2,400.00 | $4,024.38 | $3,300.00 | $3,800.00 | $3,732.00 | $7,378.89 |
| 0072 | Concrete, B, above footings (702-51010) | CYS | 193.40 | $1,000.00 | $1,071.10 | $770.00 | $1,400.00 | $1,500.00 | $1,325.62 |
| 0073 | Concrete, B, footings (702-51015) | CYS | 115.20 | $600.00 | $335.83 | $915.00 | $850.00 | $880.00 | $823.51 |
| 0074 | Concrete, C , concrete cap for water and force main (702-93722) | CYS | 1.90 | $1,100.00 | $1,906.28 | $2,340.00 | $1,239.28 | $3,100.00 | $533.79 |
| 0075 | Reinforcing bars (703-06028) | LBS | 23,784 | $1.50 | $1.52 | $1.36 | $2.00 | $1.80 | $1.75 |
| 0076 | Reinforcing bars, epoxy coated (703-06029) | LBS | 32,679 | $1.70 | $1.88 | $1.49 | $1.80 | $1.95 | $2.01 |
| 0077 | Concrete, C, superstructure (704-51002) | CYS | 80.80 | $1,800.00 | $2,037.22 | $2,935.00 | $1,280.00 | $2,200.00 | $2,495.21 |
| 0078 | Surface seal , CV 007-039- 03.75 (709-51821) | LS | 1 | $5,000.00 | $1.06 | $5,777.17 | $1.00 | $0.01 | $1.01 |
| 0079 | Surface seal , CV 007-039- 04.85 (709-51821) | LS | 1 | $5,000.00 | $1.06 | $5,777.17 | $1.00 | $0.01 | $1.01 |
| 0080 | Structure, reinforced concrete, box sections, 7 FT X 7 FT (714-11168) | LFT | 133 | $1,400.00 | $1,033.47 | $1,785.00 | $4,562.70 | $1,780.00 | $6,957.37 |
| 0081 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 69 | $60.00 | $117.06 | $130.00 | $120.00 | $170.00 | $74.97 |
| 0082 | Pipe, type 3, circular, diameter 18 in. (715-05171) | LFT | 44 | $60.00 | $130.28 | $230.00 | $140.00 | $176.00 | $140.61 |
| 0083 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 338 | $27.00 | $16.57 | $35.00 | $8.00 | $29.50 | $12.51 |
| 0084 | Water main connections (715-07794) | EACH | 2 | $8,000.00 | $2,329.91 | $9,500.00 | $2,663.93 | $9,875.00 | $5,695.85 |
| 0085 | Water main, 12 in. (715-98165) | LFT | 79 | $120.00 | $794.29 | $400.00 | $652.76 | $377.00 | $924.27 |
| 0086 | Force main , 6 inch (715-98961) | LFT | 91 | $240.00 | $264.76 | $450.00 | $755.64 | $593.00 | $503.56 |
| 0087 | Geotextile for underdrains, type 1B (718-12306) | SYS | 684 | $3.00 | $5.56 | $6.00 | $3.00 | $3.75 | $7.53 |
| 0088 | Inlet, type F7 (720-45035) | EACH | 1 | $2,500.00 | $3,236.50 | $6,400.00 | $5,500.00 | $5,002.00 | $4,288.16 |
| 0089 | Road closure sign assembly (801-04308) | EACH | 21 | $190.00 | $276.41 | $250.00 | $250.00 | $250.00 | $226.68 |
| 0090 | Detour route marker assembly (801-06625) | EACH | 103 | $115.00 | $181.10 | $75.00 | $75.00 | $75.00 | $95.71 |
| 0091 | Construction sign, type A (801-06640) | EACH | 48 | $150.00 | $247.82 | $120.00 | $120.00 | $120.00 | $176.31 |
| 0092 | Maintaining traffic (801-06775) | LS | 1 | $30,000 | $3,115.32 | $29,740 | $100,000 | $41,987 | $22,471 |
| 0093 | Barricade, type III-A (801-07118) | LFT | 247 | $10.00 | $16.85 | $12.00 | $12.00 | $12.00 | $16.12 |
| 0094 | Barricade, type III-B (801-07119) | LFT | 463 | $12.00 | $16.85 | $12.00 | $12.00 | $12.00 | $17.13 |
| 0095 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 14 | $37.00 | $26.48 | $37.00 | $63.00 | $37.00 | $35.26 |
| 0096 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 10 | $32.00 | $21.18 | $32.00 | $49.00 | $32.00 | $25.19 |
| 0097 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 146 | $2.50 | $1.57 | $2.25 | $2.25 | $2.25 | $1.26 |
| 0098 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 3,282 | $1.00 | $0.92 | $2.25 | $2.25 | $2.25 | $1.11 |
| 0099 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,950 | $1.00 | $0.92 | $2.25 | $2.25 | $2.25 | $1.11 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.