INDOT contract R-42801-A bid tabulation
BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on July 9, 2025, Franklin, Seymour. 6 bids received; low bid $2,797,000 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 148
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $2,797,000 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $3,000,000 | +7.0% |
| 3 | Sunesis Construction Company | $3,061,772 | +9.0% |
| 4 | Beaty Construction Inc | $3,224,617 | +15% |
| 5 | Paul H Rohe Company Inc | $3,252,389 | +16% |
| 6 | Milestone Contractors LP | $3,720,000 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. Rieth-Riley Construction Co., Inc. | 3. Sunesis Construction Company | 4. Beaty Construction Inc | 5. Paul H Rohe Company Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $30,000 | $33,685 | $33,927 | $33,250 | $33,685 | $26,250 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $134,850 | $145,989 | $178,258 | $161,175 | $159,050 | $186,000 |
| 0009 | Tree, 6 in., remove (201-02245) | EACH | 4 | $500.00 | $350.00 | $398.08 | $350.00 | $600.00 | $850.00 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $15,000 | $90,775 | $8,776.91 | $32,235 | $118,910 | $37,000 |
| 0011 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $60,000 | $57,814 | $252,363 | $45,000 | $415,777 | $67,500 |
| 0012 | Sidewalk concrete, remove (202-52710) | SYS | 168 | $25.00 | $24.75 | $8.04 | $12.00 | $58.00 | $45.00 |
| 0013 | Retaining wall, remove (202-90747) | LFT | 68 | $125.00 | $25.00 | $81.08 | $85.00 | $400.00 | $65.00 |
| 0014 | Stump, remove (202-91922) | EACH | 1 | $500.00 | $1,300.00 | $93.87 | $850.00 | $3,000.00 | $420.00 |
| 0015 | Fence and posts, remove (202-96430) | LS | 1 | $6,000.00 | $1,240.00 | $827.10 | $3,500.00 | $7,115.00 | $3,500.00 |
| 0016 | Excavation, common (203-02000) | CYS | 1,185 | $60.00 | $98.40 | $137.97 | $63.00 | $68.00 | $140.00 |
| 0017 | Borrow (203-02070) | CYS | 570 | $20.00 | $0.01 | $25.61 | $50.00 | $82.00 | $85.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 30,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $5,000.00 | $40,942 | $32,231 | $30,750 | $18,000 | $57,000 |
| 0020 | SWQCP preparation (205-12618) | LS | 1 | $5,000.00 | $4,000.00 | $2,820.09 | $3,500.00 | $1,700.00 | $4,200.00 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 1,347 | $25.00 | $83.00 | $32.59 | $48.25 | $53.00 | $85.00 |
| 0022 | Subgrade treatment, type III (207-08266) | SYS | 410 | $6.00 | $14.40 | $4.16 | $5.50 | $30.00 | $75.00 |
| 0023 | B borrow (211-02050) | CYS | 3 | $300.00 | $560.00 | $133.83 | $350.00 | $330.00 | $120.00 |
| 0024 | Structure backfill, type 2 (211-09265) | CYS | 367 | $70.00 | $78.60 | $180.55 | $93.50 | $90.00 | $80.00 |
| 0025 | Geogrid, type IB (214-11796) | SYS | 1,160 | $5.00 | $2.56 | $2.92 | $4.30 | $9.00 | $6.25 |
| 0026 | Compacted aggregate, no. 53 (301-12234) | CYS | 384 | $100.00 | $135.45 | $142.76 | $105.00 | $110.00 | $185.00 |
| 0027 | Dense graded subbase (302-07455) | CYS | 41 | $125.00 | $111.75 | $223.13 | $185.00 | $130.00 | $165.00 |
| 0028 | HMA patching, full depth, type B (304-12623) | TON | 203 | $100.00 | $420.00 | $355.85 | $450.00 | $250.00 | $600.00 |
| 0029 | PCCP patching, partial depth (506-06334) | SYS | 124 | $600.00 | $324.00 | $301.80 | $265.00 | $290.00 | $425.00 |
| 0030 | Guardrail, reset (601-06035) | LFT | 244 | $11.00 | $11.00 | $28.20 | $11.00 | $11.00 | $30.00 |
| 0031 | Guardrail end treatment, reset (601-91147) | EACH | 2 | $4,000.00 | $4,000.00 | $3,323.68 | $4,000.00 | $4,000.00 | $3,465.00 |
| 0032 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $3,500.00 | $3,500.00 | $4,079.06 | $3,500.00 | $3,500.00 | $4,250.00 |
| 0033 | HMA for sidewalk (604-05528) | TON | 53 | $100.00 | $335.75 | $287.05 | $325.00 | $285.00 | $800.00 |
| 0034 | Sidewalk, concrete (604-06070) | SYS | 2,755 | $100.00 | $70.60 | $84.96 | $114.50 | $86.00 | $160.00 |
| 0035 | Curb ramp, concrete (604-08086) | SYS | 263 | $300.00 | $203.00 | $257.67 | $250.00 | $218.00 | $525.00 |
| 0036 | Detectable warning surfaces (604-12083) | SYS | 45 | $400.00 | $400.00 | $418.73 | $550.00 | $250.00 | $365.00 |
| 0037 | Handrail, pedestrian (604-95344) | LFT | 155 | $200.00 | $486.00 | $282.01 | $486.00 | $486.00 | $300.00 |
| 0038 | Curb, integral concrete (605-06090) | LFT | 354 | $60.00 | $67.55 | $40.50 | $45.00 | $65.00 | $90.00 |
| 0039 | Curb, concrete (605-06120) | LFT | 658 | $50.00 | $48.30 | $40.49 | $53.50 | $55.00 | $70.00 |
| 0040 | Curb and gutter, concrete (605-06140) | LFT | 229 | $60.00 | $61.00 | $42.91 | $110.00 | $75.00 | $85.00 |
| 0041 | Curb and gutter, concrete , modified (605-06140) | LFT | 367 | $65.00 | $48.15 | $42.67 | $75.00 | $55.00 | $100.00 |
| 0042 | Curb and gutter, rolled curb (605-97937) | LFT | 641 | $60.00 | $42.80 | $42.65 | $98.75 | $50.00 | $85.00 |
| 0043 | PCCP for approaches, 6 in. (610-08446) | SYS | 242 | $120.00 | $100.00 | $116.60 | $123.00 | $122.00 | $190.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 8 | $300.00 | $137.75 | $77.81 | $120.00 | $185.00 | $300.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 10 | $60.00 | $5.00 | $83.95 | $15.00 | $18.00 | $40.00 |
| 0046 | Topsoil (621-06570) | CYS | 19 | $150.00 | $120.00 | $20.63 | $200.00 | $135.00 | $500.00 |
| 0047 | Sodding (621-06574) | SYS | 112 | $80.00 | $9.00 | $16.98 | $15.00 | $50.00 | $52.50 |
| 0048 | Computer system equipment (628-11976) | EACH | 3 | $700.00 | $1,000.00 | $2,031.62 | $1,650.00 | $985.00 | $750.00 |
| 0049 | Field office, type D (628-12683) | MOS | 18 | $2,800.00 | $3,850.00 | $4,464.05 | $6,275.00 | $3,500.00 | $4,000.00 |
| 0050 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $5,000.00 | $2,265.00 | $4,913.55 | $1,430.00 | $5,200.00 | $9,500.00 |
| 0051 | Field drilled hole in concrete (702-51863) | EACH | 851 | $30.00 | $38.00 | $24.51 | $24.00 | $28.00 | $25.00 |
| 0052 | Reinforcing bars, epoxy coated (703-06029) | LBS | 14,246 | $3.00 | $1.81 | $2.27 | $1.75 | $1.79 | $2.40 |
| 0053 | Concrete, C, superstructure (704-51002) | CYS | 55 | $600.00 | $836.00 | $932.90 | $525.00 | $320.00 | $1,400.00 |
| 0054 | Concrete bridge railing transition, type TPS-1 (706-06353) | EACH | 2 | $5,000.00 | $7,450.00 | $8,690.41 | $5,075.00 | $9,700.00 | $9,500.00 |
| 0055 | Railing, concrete type FT , modified (706-09959) | LFT | 75 | $200.00 | $792.00 | $774.45 | $340.00 | $487.00 | $270.00 |
| 0056 | Railing, concrete type PS-1 , modified (706-09961) | LFT | 206 | $270.00 | $792.00 | $770.54 | $228.00 | $71.69 | $300.00 |
| 0057 | Railing, steel type PS-1 (706-11418) | LFT | 168 | $131.00 | $172.35 | $176.26 | $131.00 | $131.00 | $160.00 |
| 0058 | Surface seal (709-51821) | LS | 1 | $6,000.00 | $6,500.00 | $5,383.82 | $5,200.00 | $5,140.00 | $5,400.00 |
| 0059 | Concrete surface coating (709-96826) | LS | 1 | $40,000 | $37,000 | $38,740 | $37,000 | $36,990 | $46,750 |
| 0060 | Retaining wall (714-05562) | SFT | 804 | $180.00 | $195.00 | $234.55 | $250.00 | $360.00 | $240.00 |
| 0061 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 746 | $80.00 | $100.00 | $64.49 | $79.00 | $88.00 | $80.00 |
| 0062 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 28 | $140.00 | $98.65 | $62.59 | $99.00 | $210.00 | $160.00 |
| 0063 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 160 | $40.00 | $31.30 | $93.71 | $74.00 | $98.00 | $20.00 |
| 0064 | Pipe, type 2, circular, diameter 4 in. (715-08627) | LFT | 66 | $60.00 | $78.05 | $20.83 | $47.00 | $136.00 | $65.00 |
| 0065 | Video inspection for pipe (715-09064) | LFT | 840 | $3.00 | $1.70 | $3.93 | $3.90 | $3.75 | $4.00 |
| 0066 | Pipe, bridge deck drain system (715-09938) | LS | 1 | $15,000 | $24,980 | $2,449.36 | $15,500 | $27,490 | $28,500 |
| 0067 | Pipe end section, diameter 12 in. (715-46000) | EACH | 3 | $2,000.00 | $1,385.00 | $1,322.98 | $835.00 | $4,850.00 | $1,000.00 |
| 0068 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $2,000.00 | $1,445.00 | $1,384.81 | $875.00 | $3,730.00 | $1,000.00 |
| 0069 | Casting, manhole, adjust to grade (720-12798) | EACH | 9 | $1,500.00 | $895.00 | $1,194.84 | $850.00 | $1,325.00 | $1,350.00 |
| 0070 | Inlet, type B15 (720-98174) | EACH | 7 | $5,000.00 | $4,180.00 | $5,200.21 | $3,775.00 | $6,245.00 | $5,000.00 |
| 0071 | Inlet, type C15 (720-98555) | EACH | 7 | $5,000.00 | $4,180.00 | $5,200.21 | $4,050.00 | $6,435.00 | $5,000.00 |
| 0072 | Bridge deck patching, full depth (722-51401) | SFT | 100 | $120.00 | $219.00 | $229.66 | $142.75 | $72.00 | $220.00 |
| 0073 | Expansion joint sliding plate (724-03855) | LFT | 14 | $600.00 | $407.20 | $1,154.54 | $725.00 | $890.00 | $800.00 |
| 0074 | Bridge expansion joint, type PCF (724-12773) | LFT | 14 | $400.00 | $180.75 | $233.22 | $91.50 | $550.00 | $300.00 |
| 0075 | Road closure sign assembly (801-04308) | EACH | 3 | $150.00 | $353.00 | $151.08 | $389.57 | $390.00 | $370.00 |
| 0076 | Detour route marker assembly, multiple routes (801-06196) | EACH | 43 | $150.00 | $358.00 | $151.08 | $158.29 | $160.00 | $375.00 |
| 0077 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 7,100 | $1.40 | $1.70 | $1.41 | $1.61 | $1.61 | $1.80 |
| 0078 | Construction sign, type A (801-06640) | EACH | 72 | $200.00 | $255.00 | $201.44 | $249.62 | $250.00 | $267.75 |
| 0079 | Construction sign, type B (801-06645) | EACH | 14 | $100.00 | $80.00 | $100.72 | $163.33 | $165.00 | $85.00 |
| 0080 | Flashing arrow sign (801-06710) | DAY | 220 | $20.00 | $14.00 | $20.14 | $45.00 | $20.00 | $14.70 |
| 0081 | Maintaining traffic (801-06775) | LS | 1 | $274,012 | $146,640 | $132,296 | $539,374 | $131,573 | $290,141 |
| 0082 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $7,800.00 | $7,800.00 | $13,953 | $7,800.00 | $8,355.00 | $12,000 |
| 0083 | Barricade, type III-A (801-07118) | LFT | 108 | $20.00 | $16.00 | $20.14 | $19.62 | $20.00 | $16.80 |
| 0084 | Barricade, type III-B (801-07119) | LFT | 48 | $20.00 | $19.00 | $20.14 | $19.62 | $20.00 | $20.00 |
| 0085 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 936 | $70.00 | $97.40 | $44.21 | $102.00 | $82.00 | $95.00 |
| 0086 | Truck mounted attenuator (801-12042) | DAY | 60 | $150.00 | $2,048.00 | $151.08 | $450.00 | $370.00 | $700.00 |
| 0087 | Temporary pedestrian channelizer (801-12862) | LFT | 40 | $60.00 | $38.00 | $82.76 | $70.00 | $37.30 | $75.00 |
| 0088 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 277 | $40.00 | $30.00 | $30.22 | $30.00 | $26.80 | $31.50 |
| 0089 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 40 | $38.00 | $29.00 | $29.21 | $29.00 | $30.65 | $30.50 |
| 0090 | Sign post, square, type 3, unreinforced anchor base (802-05706) | LFT | 25 | $115.00 | $32.00 | $32.23 | $32.00 | $38.10 | $35.00 |
| 0091 | Sign, panel, with legend (802-07057) | SFT | 96 | $115.00 | $45.00 | $45.32 | $45.00 | $36.75 | $50.00 |
| 0092 | Sign, sheet assembly, relocate (802-07058) | EACH | 24 | $723.00 | $250.00 | $251.79 | $250.00 | $37.40 | $260.00 |
| 0093 | Sign, sheet, and supports, remove (802-07059) | EACH | 8 | $300.00 | $150.00 | $151.08 | $150.00 | $41.20 | $155.00 |
| 0094 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 99 | $45.00 | $31.00 | $31.22 | $31.00 | $20.15 | $32.50 |
| 0095 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 27 | $52.00 | $33.00 | $33.24 | $33.00 | $22.70 | $35.00 |
| 0096 | Wide flange sign post support foundation, type A (802-12222) | EACH | 2 | $5,000.00 | $2,800.00 | $2,820.10 | $2,800.00 | $2,650.00 | $3,000.00 |
| 0097 | Sign and supports, wide flange, remove (802-74040) | EACH | 2 | $900.00 | $1,000.00 | $1,007.18 | $1,000.00 | $1,597.00 | $1,050.00 |
| 0098 | Structural steel, breakaway (802-76095) | LBS | 323 | $16.00 | $7.00 | $7.05 | $7.00 | $9.12 | $7.25 |
| 0099 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 2 | $5,300.00 | $6,000.00 | $6,100.31 | $6,000.00 | $6,000.00 | $6,300.00 |
| 0100 | Handhole, signal, adjust to grade (805-01843) | EACH | 6 | $1,500.00 | $700.00 | $711.70 | $700.00 | $700.00 | $750.00 |
| 0101 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 16 | $1,400.00 | $900.00 | $915.05 | $900.00 | $900.00 | $950.00 |
| 0102 | Controller and cabinet, type P1 (805-02445) | EACH | 1 | $19,000 | $23,000 | $23,385 | $23,000 | $23,000 | $24,200 |
| 0103 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 15 | $2,000.00 | $2,000.00 | $2,033.44 | $2,000.00 | $2,000.00 | $2,100.00 |
| 0104 | Signal pole, pedestal, 12 FT (805-04133) | EACH | 9 | $1,700.00 | $1,200.00 | $1,220.06 | $1,200.00 | $1,200.00 | $1,250.00 |
| 0105 | Signal pole, pedestal, 4 FT (805-05405) | EACH | 6 | $1,400.00 | $900.00 | $915.05 | $900.00 | $900.00 | $950.00 |
| 0106 | Solar powered flashing beacon assembly (805-06742) | EACH | 1 | $11,000 | $11,000 | $11,184 | $11,000 | $8,270.00 | $11,575 |
| 0107 | Pedestrian hybrid beacon (805-11496) | EACH | 4 | $1,900.00 | $2,000.00 | $2,033.44 | $2,000.00 | $2,000.00 | $2,100.00 |
| 0108 | Handhole, signal, type 2 (805-11744) | EACH | 4 | $2,900.00 | $1,500.00 | $1,525.08 | $1,500.00 | $1,500.00 | $1,575.00 |
| 0109 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 217 | $45.00 | $33.00 | $33.55 | $33.00 | $33.00 | $34.75 |
| 0110 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 296 | $46.00 | $35.00 | $35.59 | $35.00 | $35.00 | $36.85 |
| 0111 | Pedestrian push button, APS (805-11817) | EACH | 16 | $1,950.00 | $1,100.00 | $1,118.39 | $1,100.00 | $1,100.00 | $1,155.00 |
| 0112 | Span, catenary, and tether (805-78415) | EACH | 1 | $5,800.00 | $4,500.00 | $4,575.23 | $4,500.00 | $4,500.00 | $4,735.00 |
| 0113 | Signal service (805-78445) | EACH | 1 | $4,600.00 | $2,200.00 | $2,236.78 | $2,200.00 | $2,200.00 | $2,300.00 |
| 0114 | Signal cable, service, copper, 3C/8 gauge (805-78467) | LFT | 17 | $5.00 | $5.00 | $5.08 | $5.00 | $5.00 | $5.25 |
| 0115 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 916 | $1.25 | $2.00 | $2.03 | $2.00 | $2.00 | $2.10 |
| 0116 | Signal cable, control, copper, 3C/14 gauge (805-78480) | LFT | 1,121 | $3.50 | $5.00 | $5.08 | $5.00 | $5.00 | $5.25 |
| 0117 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 43 | $4.00 | $5.50 | $5.59 | $5.50 | $5.50 | $5.75 |
| 0118 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 1,396 | $4.50 | $6.00 | $6.10 | $6.00 | $6.00 | $6.30 |
| 0119 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 388 | $4.00 | $2.00 | $2.03 | $2.00 | $14.00 | $2.10 |
| 0120 | Signal detector housing (805-78785) | EACH | 2 | $4,000.00 | $3,000.00 | $3,050.16 | $3,000.00 | $3,000.00 | $3,150.00 |
| 0121 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 385 | $16.25 | $14.00 | $14.23 | $14.00 | $14.00 | $14.75 |
| 0122 | Controller cabinet foundation, type P1 (805-78925) | EACH | 1 | $4,575.00 | $4,500.00 | $4,575.23 | $4,500.00 | $4,500.00 | $4,800.00 |
| 0123 | Signal pole, steel strain, 30 FT (805-81032) | EACH | 2 | $11,000 | $10,000 | $10,167 | $10,000 | $10,000 | $10,525 |
| 0124 | Luminaire, mast arm, 15 FT (807-02783) | EACH | 1 | $1,950.00 | $1,800.00 | $1,830.09 | $1,800.00 | $1,800.00 | $1,900.00 |
| 0125 | Luminaire , LED (807-04866) | EACH | 1 | $775.00 | $650.00 | $660.87 | $650.00 | $650.00 | $685.00 |
| 0126 | Service point, type II (807-86810) | EACH | 1 | $10,300 | $11,000 | $11,184 | $11,000 | $11,000 | $11,600 |
| 0127 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 102 | $4.00 | $1.50 | $1.53 | $1.50 | $1.50 | $1.60 |
| 0128 | Connector kit, unfused (807-86910) | EACH | 1 | $200.00 | $75.00 | $76.25 | $75.00 | $75.00 | $80.00 |
| 0129 | Connector kit, fused (807-86915) | EACH | 1 | $200.00 | $75.00 | $76.25 | $75.00 | $75.00 | $80.00 |
| 0130 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 4 | $150.00 | $35.00 | $35.59 | $35.00 | $35.00 | $40.00 |
| 0131 | Insulation link, non- waterproofed (807-86930) | EACH | 5 | $75.00 | $35.00 | $35.59 | $35.00 | $35.00 | $40.00 |
| 0132 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 16 | $23.00 | $25.00 | $25.42 | $25.00 | $25.00 | $26.50 |
| 0133 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 1,552 | $15.00 | $9.81 | $15.11 | $7.40 | $7.40 | $10.30 |
| 0134 | Pavement message marking, remove (808-05866) | SYS | 68 | $50.00 | $35.00 | $50.36 | $11.75 | $11.75 | $36.75 |
| 0135 | Transverse marking, remove (808-06368) | LFT | 100 | $10.00 | $4.54 | $10.07 | $6.10 | $6.10 | $4.75 |
| 0136 | Line, remove (808-06716) | LFT | 3,139 | $0.75 | $0.76 | $0.76 | $1.20 | $1.20 | $0.80 |
| 0137 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 318 | $3.10 | $2.95 | $5.96 | $2.95 | $2.95 | $4.20 |
| 0138 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 2,995 | $2.45 | $2.95 | $5.96 | $2.95 | $2.95 | $4.20 |
| 0139 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 457 | $50.00 | $2.95 | $5.96 | $2.95 | $2.95 | $4.20 |
| 0140 | Transverse marking, thermoplastic, yield line, white, 27 in. (808-11698) | LFT | 57 | $25.00 | $23.80 | $25.18 | $10.45 | $10.45 | $25.00 |
| 0141 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 145 | $50.00 | $2.95 | $5.96 | $2.95 | $2.95 | $4.20 |
| 0142 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 9 | $10.00 | $4.91 | $10.07 | $4.65 | $4.65 | $5.00 |
| 0143 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 207 | $10.00 | $4.91 | $10.07 | $4.65 | $4.65 | $5.00 |
| 0144 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 143 | $15.00 | $9.81 | $15.11 | $7.50 | $7.50 | $10.30 |
| 0145 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 6 | $200.00 | $207.00 | $201.44 | $170.00 | $170.00 | $215.00 |
| 0146 | Tree, 18 in., remove (201-02255) | EACH | 1 | $1,800.00 | $1,500.00 | $1,570.30 | $900.00 | $2,300.00 | $1,575.00 |
| 0147 | Guardrail, remove (601-02241) | LFT | 112.50 | $7.00 | $7.00 | $10.07 | $7.00 | $7.00 | $10.50 |
| 0148 | Mulched seeding, type U (621-06560) | SYS | 4,918 | $20.00 | $2.00 | $4.07 | $1.25 | $1.50 | $1.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.