INDOT contract R-43164-A bid tabulation
SLIDE CORRECTION. Let by Indiana DOT on July 9, 2025, Dearborn, Seymour. 9 bids received; low bid $2,390,727 by Paul H Rohe Company Inc.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 70
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Paul H Rohe Company Inc | $2,390,727 | Low |
| 2 | Force Construction Co Inc | $2,421,396 | +1.0% |
| 3 | Milestone Contractors LP | $2,436,000 | +2.0% |
| 4 | 5 Star Company Inc | $2,525,605 | +6.0% |
| 5 | Beaty Construction Inc | $2,532,342 | +6.0% |
| 6 | Morphey Construction Inc. | $2,624,000 | +10% |
| 7 | Sunesis Construction Company | $2,779,680 | +16% |
| 8 | Dave Omara Contractor Inc | $2,824,063 | +18% |
| 9 | Olco Inc | $3,838,610 | +61% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Paul H Rohe Company Inc | 2. Force Construction Co Inc | 3. Milestone Contractors LP | 4. 5 Star Company Inc | 5. Beaty Construction Inc | 6. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $12,630 | $13,120 | $15,000 | $17,500 | $42,500 | $15,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $72,960 | $120,000 | $123,250 | $72,000 | $126,617 | $130,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $31,696 | $68,990 | $58,559 | $37,500 | $50,645 | $140,000 |
| 0011 | Guardrail end treatment, remove (202-93741) | EACH | 1 | $1,050.00 | $468.00 | $450.00 | $300.00 | $450.00 | $430.00 |
| 0012 | Pipe, remove (202-96133) | LFT | 72 | $37.00 | $74.00 | $73.65 | $25.00 | $40.00 | $28.00 |
| 0013 | Fence, farm field, remove (202-99187) | LFT | 22 | $16.50 | $17.00 | $53.40 | $10.00 | $30.00 | $4.00 |
| 0014 | Excavation, common (203-02000) | CYS | 19,525 | $21.00 | $16.00 | $26.35 | $30.00 | $28.25 | $19.00 |
| 0015 | Excavation, rock (203-02010) | CYS | 597 | $180.00 | $77.00 | $105.45 | $46.00 | $74.25 | $110.00 |
| 0016 | Pump around (205-11626) | EACH | 2 | $2,900.00 | $12,630 | $11,200 | $6,500.00 | $18,250 | $40,000 |
| 0017 | Stormwater management budget (205-12108) | DOL | 17,443 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $5,150.00 | $21,750 | $14,121 | $5,500.00 | $22,500 | $2,500.00 |
| 0019 | SWQCP preparation (205-12618) | LS | 1 | $1,600.00 | $3,637.00 | $3,500.00 | $2,900.00 | $3,000.00 | $3,450.00 |
| 0020 | Subgrade treatment, type II (207-08264) | SYS | 81 | $38.00 | $21.00 | $40.60 | $30.00 | $49.00 | $32.00 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 2,419 | $38.00 | $23.00 | $26.95 | $29.00 | $37.00 | $38.00 |
| 0022 | Structure backfill, type 1 (211-09264) | CYS | 46 | $110.00 | $68.00 | $114.20 | $40.00 | $60.00 | $87.00 |
| 0023 | Compacted aggregate, no. 2 (301-12231) | CYS | 718 | $70.00 | $51.00 | $62.40 | $54.00 | $60.00 | $97.00 |
| 0024 | Compacted aggregate, no. 8 (301-12233) | CYS | 629 | $86.00 | $57.00 | $66.35 | $64.00 | $62.50 | $107.00 |
| 0025 | Compacted aggregate, no. 53 (301-12234) | CYS | 789 | $70.00 | $56.00 | $68.00 | $61.00 | $67.25 | $97.00 |
| 0026 | Dense graded subbase (302-07455) | CYS | 7 | $180.00 | $185.00 | $201.15 | $70.00 | $215.00 | $145.00 |
| 0027 | Compacted aggregate, no. 53 (303-01180) | TON | 471 | $50.00 | $32.00 | $68.55 | $40.00 | $52.00 | $52.00 |
| 0028 | Widening with HMA, type B (304-07493) | TON | 19 | $250.00 | $160.00 | $264.50 | $180.00 | $105.00 | $350.00 |
| 0029 | Milling, profile (306-11872) | SYS | 339 | $11.30 | $15.00 | $26.85 | $12.00 | $21.25 | $18.00 |
| 0030 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 249 | $135.00 | $109.00 | $124.95 | $165.00 | $105.00 | $145.00 |
| 0031 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 440 | $103.00 | $109.00 | $122.85 | $155.00 | $105.00 | $125.00 |
| 0032 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 1,027 | $90.00 | $109.00 | $108.70 | $155.00 | $105.00 | $116.00 |
| 0033 | Joint adhesive, surface (401-10258) | LFT | 1,150 | $0.50 | $1.00 | $0.52 | $1.00 | $1.00 | $0.50 |
| 0034 | Joint adhesive, intermediate (401-10259) | LFT | 1,000 | $0.70 | $1.00 | $0.94 | $1.00 | $1.00 | $0.70 |
| 0035 | Asphalt for tack coat (406-05520) | TON | 2 | $950.00 | $743.00 | $797.30 | $1,500.00 | $715.00 | $925.00 |
| 0036 | Guardrail transition, type TGB (601-01522) | EACH | 2 | $2,550.00 | $2,858.00 | $2,750.00 | $2,850.00 | $2,750.00 | $2,750.00 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,035 | $22.00 | $19.00 | $18.75 | $20.00 | $18.75 | $18.75 |
| 0038 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,250.00 | $3,117.00 | $3,000.00 | $3,150.00 | $3,000.00 | $3,000.00 |
| 0039 | HMA for approaches, type B (610-07487) | TON | 10 | $240.00 | $109.00 | $494.15 | $200.00 | $105.00 | $350.00 |
| 0040 | PCCP for approaches, 6 in. (610-08446) | SYS | 39 | $150.00 | $208.00 | $158.15 | $130.00 | $122.00 | $90.00 |
| 0041 | Mailbox assembly, single (611-06497) | EACH | 2 | $195.00 | $283.00 | $272.00 | $285.00 | $272.00 | $272.00 |
| 0042 | Monument, type B (615-06505) | EACH | 7 | $865.00 | $1,273.00 | $1,225.00 | $1,320.00 | $1,225.00 | $1,225.00 |
| 0043 | Monument, type C (615-06510) | EACH | 3 | $600.00 | $779.00 | $750.00 | $840.00 | $750.00 | $750.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 23,394 | $45.00 | $38.00 | $38.50 | $44.00 | $35.00 | $40.00 |
| 0045 | Riprap, uniform (616-06451) | TON | 151 | $80.00 | $59.00 | $69.60 | $49.00 | $110.00 | $107.00 |
| 0046 | Geotextile for riprap, type 1B (616-12247) | SYS | 200 | $4.00 | $8.20 | $8.20 | $4.00 | $6.00 | $10.00 |
| 0047 | Geotextile for riprap, type 2A (616-12248) | SYS | 6,221 | $2.20 | $5.40 | $3.20 | $3.75 | $3.25 | $2.50 |
| 0048 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $100.00 | $104.00 | $100.00 | $500.00 | $100.00 | $100.00 |
| 0049 | Fertilizer, for permanent seeding , for permanent seeding (621-06545) | TON | 1 | $50.00 | $52.00 | $10.00 | $500.00 | $10.00 | $10.00 |
| 0050 | Seed mixture, type R (621-06553) | LBS | 210 | $26.00 | $27.00 | $27.00 | $10.00 | $27.00 | $145.00 |
| 0051 | Mulching material (621-06565) | TON | 2 | $1,000.00 | $1,039.00 | $700.00 | $250.00 | $700.00 | $700.00 |
| 0052 | Sodding (621-06574) | SYS | 154 | $40.00 | $42.00 | $26.00 | $12.00 | $26.00 | $31.00 |
| 0053 | Computer system equipment (628-11976) | EACH | 3 | $915.00 | $267.00 | $545.50 | $500.00 | $1,600.00 | $800.00 |
| 0054 | Field office, type D (628-12683) | MOS | 12 | $3,300.00 | $5,819.00 | $3,858.45 | $1,550.00 | $7,000.00 | $2,400.00 |
| 0055 | Pipe end section, diameter 48 in. (715-02246) | EACH | 1 | $4,160.00 | $1,750.00 | $2,824.10 | $2,800.00 | $3,275.00 | $6,700.00 |
| 0056 | Pipe, type 1, circular, diameter 15 in. , RCP (715-05119) | LFT | 51 | $145.00 | $121.00 | $70.10 | $100.00 | $91.25 | $178.00 |
| 0057 | Pipe, type 3, circular, diameter 15 in. , RCP (715-05169) | LFT | 29 | $130.00 | $98.00 | $76.00 | $100.00 | $132.35 | $178.00 |
| 0058 | Pipe extension, circular, diameter 36 in. , CMP (715-05757) | LFT | 26 | $195.00 | $309.00 | $384.70 | $195.00 | $285.00 | $220.00 |
| 0059 | Pipe extension, circular, diameter 48 in. , CMP (715-06337) | LFT | 27 | $206.00 | $264.00 | $268.30 | $275.00 | $295.00 | $325.00 |
| 0060 | Pipe end section, diameter 15 in. (715-46005) | EACH | 5 | $2,550.00 | $492.00 | $3,480.10 | $1,500.00 | $1,830.00 | $1,800.00 |
| 0061 | Pipe end section, diameter 36 in. (715-46040) | EACH | 2 | $2,205.00 | $2,041.00 | $2,167.55 | $1,700.00 | $2,400.00 | $3,000.00 |
| 0062 | Road closure sign assembly (801-04308) | EACH | 4 | $350.00 | $234.00 | $371.00 | $240.00 | $349.68 | $350.00 |
| 0063 | Detour route marker assembly (801-06625) | EACH | 34 | $147.00 | $99.00 | $185.00 | $112.00 | $146.57 | $100.00 |
| 0064 | Construction sign, type A (801-06640) | EACH | 4 | $250.00 | $130.00 | $323.00 | $136.00 | $249.61 | $250.00 |
| 0065 | Maintaining traffic (801-06775) | LS | 1 | $7,800.00 | $276,150 | $25,000 | $54,000 | $119,899 | $79,450 |
| 0066 | Barricade, type III-B (801-07119) | LFT | 96 | $17.00 | $17.00 | $16.45 | $17.00 | $16.89 | $22.00 |
| 0067 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 52 | $35.50 | $33.00 | $32.00 | $37.00 | $35.18 | $32.00 |
| 0068 | Sign, sheet, and supports, remove (802-07059) | EACH | 1 | $39.00 | $239.00 | $230.00 | $220.00 | $38.69 | $230.00 |
| 0069 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 14 | $39.00 | $76.00 | $73.00 | $33.00 | $38.31 | $73.00 |
| 0070 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 2,300 | $1.00 | $1.00 | $0.52 | $1.00 | $0.96 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.