INDOT contract R-43788-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Ripley, Seymour. 8 bids received; low bid $466,102 by Olco Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 59
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Olco Inc | $466,102 | Low |
| 2 | Dave Omara Contractor Inc | $466,380 | 0.0% |
| 3 | 5 Star Company Inc | $468,166 | 0.0% |
| 4 | Paul H Rohe Company Inc | $525,542 | +13% |
| 5 | Morphey Construction Inc. | $554,554 | +19% |
| 6 | Paf Construction, LLC | $586,473 | +26% |
| 7 | Force Construction Co Inc | $640,000 | +37% |
| 8 | Sunesis Construction Company | $659,746 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Olco Inc | 2. Dave Omara Contractor Inc | 3. 5 Star Company Inc | 4. Paul H Rohe Company Inc | 5. Morphey Construction Inc. | 6. Paf Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $9,900.00 | $9,000.00 | $18,500 | $8,900.00 | $7,000.00 | $80,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $10,577 | $23,319 | $39,200 | $21,280 | $25,000 | $25,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $22,979 | $9,327.60 | $5,500.00 | $9,855.00 | $10,000 | $16,875 |
| 0012 | Excavation, common (203-02000) | CYS | 410 | $50.49 | $30.00 | $45.00 | $80.00 | $50.00 | $45.00 |
| 0013 | Excavation, rock (203-02010) | CYS | 6 | $109.40 | $95.00 | $350.00 | $250.00 | $320.00 | $250.00 |
| 0014 | Borrow (203-02070) | CYS | 65 | $83.90 | $39.00 | $22.00 | $70.00 | $45.00 | $100.00 |
| 0015 | Pump around (205-11626) | EACH | 2 | $5,375.03 | $3,700.00 | $6,450.00 | $7,770.00 | $15,000 | $7,500.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 1,866 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $5,670.00 | $2,800.00 | $4,200.00 | $3,500.00 | $1,500.00 | $15,000 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 312 | $48.33 | $46.50 | $45.00 | $54.00 | $45.00 | $40.00 |
| 0019 | Structure backfill, type 2 (211-09265) | CYS | 131 | $76.25 | $94.00 | $120.00 | $100.00 | $75.00 | $85.00 |
| 0020 | Structure backfill, type 5 (211-09268) | CYS | 89 | $256.60 | $295.00 | $200.00 | $240.00 | $180.00 | $125.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 312 | $6.03 | $6.25 | $5.00 | $5.80 | $6.00 | $5.00 |
| 0022 | Compacted aggregate, no. 5 (301-12232) | CYS | 38 | $95.59 | $104.00 | $100.00 | $150.00 | $130.00 | $95.00 |
| 0023 | Compacted aggregate, no. 8 (301-12233) | CYS | 27 | $85.92 | $98.00 | $100.00 | $160.00 | $140.00 | $90.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 174 | $56.35 | $37.00 | $50.00 | $65.00 | $85.00 | $50.00 |
| 0025 | Milling, transition (306-08043) | SYS | 646 | $13.32 | $5.00 | $7.00 | $10.00 | $18.00 | $8.00 |
| 0026 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 76 | $233.37 | $350.00 | $185.00 | $280.00 | $290.00 | $265.00 |
| 0027 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 38 | $215.96 | $350.00 | $180.00 | $270.00 | $285.00 | $250.00 |
| 0028 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 88 | $215.96 | $350.00 | $150.00 | $240.00 | $270.00 | $225.00 |
| 0029 | Joint adhesive (401-11526) | LFT | 490 | $1.79 | $0.50 | $1.00 | $1.60 | $1.75 | $1.00 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 1,186 | $1.14 | $0.50 | $0.85 | $1.00 | $1.10 | $1.00 |
| 0031 | Right-of-way marker (615-06490) | EACH | 10 | $207.00 | $210.00 | $220.00 | $207.00 | $207.00 | $240.00 |
| 0032 | Monument, type B (615-06505) | EACH | 4 | $1,300.00 | $1,350.00 | $1,350.00 | $1,300.00 | $1,300.00 | $1,500.00 |
| 0033 | Riprap, class 1 (616-05688) | TON | 165 | $57.19 | $95.00 | $100.00 | $115.00 | $115.00 | $95.00 |
| 0034 | Riprap, revetment (616-06405) | TON | 114 | $74.60 | $63.00 | $90.00 | $110.00 | $110.00 | $90.00 |
| 0035 | Geotextile for riprap, type 1A (616-12246) | SYS | 436 | $3.61 | $4.50 | $5.00 | $2.60 | $3.00 | $5.00 |
| 0036 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $228.42 | $1,025.00 | $350.00 | $1,000.00 | $1,000.00 | $1,150.00 |
| 0037 | Seed mixture, native (621-03909) | LBS | 1 | $174.62 | $1,525.00 | $200.00 | $1,500.00 | $2,200.00 | $1,725.00 |
| 0038 | Seed mixture , pollinator mix (621-04258) | LBS | 1 | $210.18 | $1,525.00 | $200.00 | $1,500.00 | $2,500.00 | $1,725.00 |
| 0039 | Seed mixture , stream mix (621-04258) | LBS | 1 | $314.78 | $1,525.00 | $200.00 | $1,500.00 | $2,200.00 | $1,725.00 |
| 0040 | Mulched seeding, type R (621-06559) | SYS | 1,445 | $1.93 | $1.50 | $2.00 | $1.45 | $8.00 | $3.00 |
| 0041 | Mulching material (621-06565) | TON | 1 | $3,084.41 | $925.00 | $150.00 | $900.00 | $900.00 | $1,000.00 |
| 0042 | Sodding (621-06574) | SYS | 123 | $16.64 | $31.00 | $19.00 | $30.00 | $35.00 | $35.00 |
| 0043 | Computer system equipment (628-11976) | EACH | 2 | $700.00 | $250.00 | $400.00 | $900.00 | $1,000.00 | $850.00 |
| 0044 | Field office, type D (628-12683) | MOS | 6 | $900.00 | $2,000.00 | $1,500.00 | $3,500.00 | $2,000.00 | $4,000.00 |
| 0045 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,855 | $4.98 | $3.50 | $3.20 | $4.15 | $6.00 | $10.00 |
| 0046 | Structure, reinforced concrete, box sections, 8 FT X 4 FT (714-11177) | LFT | 40 | $1,941.89 | $1,960.00 | $1,750.00 | $1,885.00 | $2,500.00 | $1,975.00 |
| 0047 | Structure, reinforced concrete, box sections, 7 FT X 5 FT (714-11311) | LFT | 45 | $1,995.79 | $1,603.00 | $1,120.00 | $2,205.00 | $2,050.00 | $1,850.00 |
| 0048 | Geotextile for underdrains, type 2A (718-12307) | SYS | 256 | $3.41 | $4.50 | $5.00 | $4.00 | $4.00 | $5.00 |
| 0049 | Construction sign, type C (801-03290) | EACH | 4 | $250.00 | $325.00 | $251.00 | $250.00 | $120.00 | $287.50 |
| 0050 | Road closure sign assembly (801-04308) | EACH | 16 | $150.00 | $125.00 | $155.00 | $150.00 | $170.00 | $172.50 |
| 0051 | Detour route marker assembly (801-06625) | EACH | 78 | $75.00 | $130.00 | $79.00 | $75.00 | $85.00 | $90.00 |
| 0052 | Construction sign, type A (801-06640) | EACH | 41 | $150.00 | $200.00 | $155.00 | $150.00 | $120.00 | $170.00 |
| 0053 | Maintaining traffic (801-06775) | LS | 1 | $14,162 | $8,184.40 | $56,000 | $8,930.00 | $11,977 | $9,500.00 |
| 0054 | Barricade, type III-B (801-07119) | LFT | 288 | $13.00 | $6.25 | $14.00 | $13.00 | $16.00 | $15.00 |
| 0055 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 50 | $2.00 | $14.00 | $2.20 | $2.00 | $1.10 | $2.00 |
| 0056 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 780 | $1.00 | $3.25 | $1.10 | $1.00 | $1.10 | $2.00 |
| 0057 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 580 | $1.00 | $3.25 | $1.10 | $1.00 | $1.10 | $2.00 |
| 0058 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 10 | $19.26 | $5.00 | $20.00 | $42.00 | $10.00 | $150.00 |
| 0059 | Snowplowable raised pavement marker (808-75998) | EACH | 10 | $100.00 | $110.00 | $110.00 | $100.00 | $100.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.