Paf Construction, LLC: INDOT bid record
Paf Construction, LLC submitted 12 bids on Indiana DOT contracts in the data, from 13 NOV 2025 to 05 AUG 2026, and was the low bidder on 1 of them (8%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $2,236,731
- Latest bid
- 05 AUG 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 6 | 1 | 17% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 9 | 1 | 11% |
| Greenfield | 2 | 0 | 0% |
| Crawfordsville | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Project estimate adjustment | 109-08463 | DOL | 6 | 6 (100%) | $1.00 | $1.00 |
| Milling, asphalt, 1 1/2 in. | 306-08034 | SYS | 6 | 3 (50%) | $13.50 | $10.00 |
| Riprap, revetment | 616-06405 | TON | 12 | 2 (17%) | $122.50 | $100.00 |
| Excavation, common | 203-02000 | CYS | 9 | 2 (22%) | $65.00 | $63.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Morphey Construction Inc. | 8 | 5 of 8 |
| E & B Paving LLC | 5 | 4 of 5 |
| 5 Star Company Inc | 5 | 4 of 5 |
| Milestone Contractors LP | 5 | 2 of 5 |
| Force Construction Co Inc | 4 | 1 of 4 |
| Olco Inc | 4 | 4 of 4 |
| Dave Omara Contractor Inc | 4 | 2 of 4 |
| Paul H Rohe Company Inc | 4 | 4 of 4 |
| Yarberry Companies Inc | 4 | 0 of 4 |
| Calumet Civil Contractors Inc | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 AUG 2026 | B-44436-A | Seymour | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | 5 of 10 | $635,598 | +11% |
| 08 APR 2026 | R-43683-A | Crawfordsville | SMALL STRUCTURE REPLACEMENT | 8 of 10 | $976,366 | +32% |
| 11 FEB 2026 | R-45636-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 2 of 5 | $263,165 | +16% |
| 11 FEB 2026 | R-46255-A | Seymour | SMALL STRUCTURE PIPE LINING | 2 of 3 | $667,339 | +11% |
| 14 JAN 2026 | R-43956-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 2 of 6 | $197,368 | +11% |
| 14 JAN 2026 | B-43516-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 10 of 12 | $908,742 | +36% |
| 10 DEC 2025 | R-43749-A | Seymour | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 1 of 4 | $2,236,731 | Low, 4.0% under the second |
| 10 DEC 2025 | R-43788-A | Seymour | SMALL STRUCTURE REPLACEMENT | 6 of 8 | $586,473 | +26% |
| 10 DEC 2025 | R-44051-A | Seymour | SMALL STRUCTURE REPLACEMENT | 5 of 8 | $1,699,379 | +22% |
| 10 DEC 2025 | B-44962-A | Seymour | EMBANKMENT STABILIZATION | 4 of 7 | $171,419 | +4.0% |
| 13 NOV 2025 | R-43304-A | Seymour | SMALL STRUCTURE REPLACEMENT | 3 of 4 | $1,596,098 | +8.0% |
| 13 NOV 2025 | R-43888-A | Seymour | SMALL STRUCTURE REPLACEMENT | 6 of 7 | $862,184 | +38% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.