INDOT contract R-43749-A bid tabulation
SMALL STRUCTURE REPLACEMENT AND PIPE LINING. Let by Indiana DOT on December 10, 2025, Harrison, Seymour. 4 bids received; low bid $2,236,731 by Paf Construction, LLC.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 99
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Paf Construction, LLC | $2,236,731 | Low |
| 2 | Mac Construction & Excavating Inc | $2,321,000 | +4.0% |
| 3 | Ragle, Inc. | $2,344,177 | +5.0% |
| 4 | E & B Paving LLC | $2,623,400 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Paf Construction, LLC | 2. Mac Construction & Excavating Inc | 3. Ragle, Inc. | 4. E & B Paving LLC |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $160,000 | $55,000 | $35,000 | $58,032 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 8 | $750.00 | $1,100.00 | $600.00 | $1,450.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $75,000 | $108,000 | $115,000 | $133,000 |
| 0012 | Tree, 10 in., remove (201-02250) | EACH | 3 | $1,400.00 | $367.00 | $1,600.00 | $366.67 |
| 0013 | Tree, 18 in., remove (201-02255) | EACH | 8 | $2,000.00 | $700.00 | $1,800.00 | $700.00 |
| 0014 | Tree, 30 in., remove (201-02260) | EACH | 1 | $2,500.00 | $3,850.00 | $3,000.00 | $3,850.00 |
| 0015 | Tree, 48 in., remove (201-02265) | EACH | 1 | $3,500.00 | $5,500.00 | $5,700.00 | $5,500.00 |
| 0016 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $155,526 | $46,000 | $52,500 |
| 0017 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $23,000 | $7,800.00 | $6,000.00 | $7,000.00 |
| 0018 | Present structure, remove, structure no. CV 011-031-12.30 (202-51330) | LS | 1 | $23,000 | $7,800.00 | $25,000 | $11,000 |
| 0019 | Present structure, remove, structure no. CV 062-031-129.70 (202-51330) | LS | 1 | $23,000 | $7,800.00 | $25,000 | $10,777 |
| 0020 | Present structure, remove, structure no. CV 337-031-014.40 (202-51330) | LS | 1 | $25,000 | $7,800.00 | $15,000 | $8,000.00 |
| 0021 | Excavation, common (203-02000) | CYS | 434 | $65.00 | $90.00 | $75.00 | $135.00 |
| 0022 | Pump around (205-11626) | EACH | 6 | $7,500.00 | $12,500 | $18,000 | $5,000.00 |
| 0023 | Stormwater management budget (205-12108) | DOL | 56,822 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $33,000 | $95,000 | $15,000 | $44,793 |
| 0025 | Excavation, wet (206-51220) | CYS | 170 | $80.00 | $72.00 | $80.00 | $93.00 |
| 0026 | Subgrade treatment, type II (207-08264) | SYS | 169 | $50.00 | $70.00 | $35.00 | $85.00 |
| 0027 | Subgrade treatment, type IC (207-09935) | SYS | 570 | $55.00 | $64.00 | $60.00 | $72.00 |
| 0028 | Structure backfill, type 1 (211-09264) | CYS | 7 | $100.00 | $67.00 | $55.00 | $74.00 |
| 0029 | Structure backfill, type 2 (211-09265) | CYS | 608 | $60.00 | $73.00 | $90.00 | $52.00 |
| 0030 | Structure backfill, type 5 (211-09268) | CYS | 223 | $80.00 | $267.00 | $300.00 | $195.00 |
| 0031 | Geocell confinement system (214-11609) | SYS | 118 | $75.00 | $111.00 | $55.00 | $109.60 |
| 0032 | Geogrid, type IB (214-11796) | SYS | 336 | $4.00 | $15.00 | $5.00 | $2.00 |
| 0033 | Geotextile for pavement, type 2B (214-12239) | SYS | 755 | $5.00 | $6.00 | $5.00 | $3.00 |
| 0034 | Compacted aggregate, no. 53 (301-12234) | CYS | 29 | $130.00 | $211.00 | $160.00 | $112.00 |
| 0035 | Compacted aggregate, no. 53 (303-01180) | TON | 46 | $95.00 | $127.00 | $75.00 | $69.00 |
| 0036 | Aggregate, no. 5 (303-05738) | TON | 274 | $65.00 | $98.00 | $80.00 | $50.00 |
| 0037 | Widening with HMA, type B (304-07493) | TON | 19 | $265.00 | $561.00 | $698.80 | $794.93 |
| 0038 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 413 | $18.50 | $18.00 | $7.50 | $17.00 |
| 0039 | Milling, transition (306-08043) | SYS | 312 | $18.50 | $33.00 | $15.00 | $27.50 |
| 0040 | Milling, profile (306-11872) | SYS | 90 | $18.50 | $47.00 | $12.00 | $40.00 |
| 0041 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 96 | $300.00 | $372.00 | $264.00 | $264.00 |
| 0042 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 49 | $285.00 | $427.00 | $297.00 | $297.00 |
| 0043 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 126 | $250.00 | $215.00 | $150.00 | $150.00 |
| 0044 | Joint adhesive (401-11526) | LFT | 1,151 | $1.00 | $0.70 | $0.46 | $0.46 |
| 0045 | Asphalt for tack coat (406-05520) | TON | 1.24 | $1,000.00 | $0.01 | $1.00 | $1.00 |
| 0046 | HMA for approaches, type B (610-07487) | TON | 38 | $400.00 | $495.00 | $498.89 | $498.17 |
| 0047 | Mailbox assembly, reset, single (611-08232) | EACH | 3 | $1,000.00 | $450.00 | $450.00 | $450.00 |
| 0048 | Right-of-way marker (615-06490) | EACH | 22 | $275.00 | $225.00 | $225.00 | $225.00 |
| 0049 | Monument, type B (615-06505) | EACH | 2 | $2,500.00 | $2,125.00 | $2,125.00 | $2,125.00 |
| 0050 | Riprap, class 1 (616-05688) | TON | 179 | $115.00 | $125.00 | $120.00 | $110.00 |
| 0051 | Riprap, class 2 (616-05689) | TON | 145 | $110.00 | $89.00 | $130.00 | $115.00 |
| 0052 | Riprap, revetment (616-06405) | TON | 196 | $100.00 | $109.00 | $95.00 | $95.00 |
| 0053 | Riprap, uniform (616-06451) | TON | 40 | $185.00 | $142.00 | $150.00 | $110.00 |
| 0054 | Geotextile for riprap, type 1A (616-12246) | SYS | 95 | $5.00 | $27.00 | $5.00 | $4.50 |
| 0055 | Geotextile for riprap, type 1B (616-12247) | SYS | 294 | $5.00 | $3.60 | $4.50 | $4.00 |
| 0056 | Geotextile for riprap, type 2A (616-12248) | SYS | 67 | $5.00 | $15.00 | $5.00 | $9.00 |
| 0057 | Geotextile for riprap, type 2B (616-12249) | SYS | 326 | $5.00 | $8.00 | $5.00 | $3.00 |
| 0058 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $1,000.00 | $1,000.00 | $1,000.00 | $1,050.00 |
| 0059 | Erosion control blanket (621-02770) | SYS | 680 | $6.00 | $5.00 | $5.00 | $4.32 |
| 0060 | Seed mixture, native (621-03909) | LBS | 20 | $100.00 | $300.00 | $300.00 | $156.90 |
| 0061 | Mulched seeding, type R (621-06559) | SYS | 1,273 | $6.25 | $5.50 | $5.50 | $8.15 |
| 0062 | Topsoil (621-06570) | CYS | 36 | $90.00 | $170.00 | $100.00 | $150.00 |
| 0063 | Sodding (621-06574) | SYS | 298 | $25.00 | $20.00 | $27.00 | $17.57 |
| 0064 | Field office, type C (628-09403) | MOS | 24 | $3,850.00 | $2,591.00 | $3,100.00 | $2,780.00 |
| 0065 | Computer system equipment (628-11976) | EACH | 3 | $2,750.00 | $1,080.00 | $1,000.00 | $750.00 |
| 0066 | Temporary shoring (702-04325) | LS | 1 | $25,000 | $60,000 | $80,000 | $135,012 |
| 0067 | Waterproofing membrane, type 2 (714-000086) | SFT | 2,654 | $5.75 | $8.00 | $5.75 | $5.00 |
| 0068 | Structure, coated reinforced concrete, box sections, 7 FT X 6 FT (714-000125) | LFT | 56 | $2,000.00 | $2,500.00 | $3,000.00 | $4,000.00 |
| 0069 | Structure, coated reinforced concrete, box sections, 10 FT X 4 FT (714-11580) | LFT | 40 | $2,500.00 | $3,100.00 | $3,300.00 | $3,600.00 |
| 0070 | Headwall reconstruct (714-96273) | LS | 1 | $40,000 | $192,000 | $160,000 | $200,000 |
| 0071 | Pipe end section, min. area 42.4 SFT (715-000186) | EACH | 1 | $25,000 | $22,000 | $24,000 | $19,200 |
| 0072 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 151 | $100.00 | $148.00 | $75.00 | $155.00 |
| 0073 | HMA for structure installation, type B (715-08305) | TON | 96 | $265.00 | $222.00 | $200.14 | $190.00 |
| 0074 | Pipe, type 1, deformed, min. area 42.4 SFT (715-09951) | LFT | 57 | $1,200.00 | $1,700.00 | $3,000.00 | $6,600.00 |
| 0075 | Concrete anchor, min. area 42.4 SFT (715-12322) | EACH | 2 | $10,000 | $21,000 | $6,500.00 | $16,000 |
| 0076 | Geotextile for pipe, type 2B (715-12872) | SYS | 204 | $12.00 | $2.60 | $5.00 | $4.00 |
| 0077 | Pipe end section, diameter 15 in. (715-46005) | EACH | 6 | $3,500.00 | $1,200.00 | $1,200.00 | $1,500.00 |
| 0078 | Pipe liner, cured-in- place, 72 in. (725-10203) | LFT | 65 | $9,000.00 | $3,800.00 | $4,500.00 | $4,250.00 |
| 0079 | Road closure sign assembly (801-04308) | EACH | 21 | $175.00 | $150.00 | $289.00 | $287.00 |
| 0080 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 684 | $1.60 | $1.35 | $1.51 | $1.77 |
| 0081 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 435 | $2.00 | $2.00 | $2.27 | $2.55 |
| 0082 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 22 | $2.00 | $10.00 | $10.79 | $19.87 |
| 0083 | Detour route marker assembly (801-06625) | EACH | 82 | $85.00 | $75.00 | $165.00 | $154.00 |
| 0084 | Construction sign, type A (801-06640) | EACH | 57 | $200.00 | $175.00 | $221.00 | $176.00 |
| 0085 | Construction sign, type B (801-06645) | EACH | 17 | $60.00 | $50.00 | $111.00 | $63.00 |
| 0086 | Maintaining traffic (801-06775) | LS | 1 | $17,250 | $40,000 | $79,000 | $100,000 |
| 0087 | Barricade, type III-A (801-07118) | LFT | 160 | $20.00 | $15.00 | $15.61 | $11.00 |
| 0088 | Barricade, type III-B (801-07119) | LFT | 204 | $20.00 | $15.00 | $15.61 | $12.00 |
| 0089 | Portable changeable message sign (801-11642) | EACH | 6 | $3,500.00 | $3,000.00 | $6,000.00 | $3,424.00 |
| 0090 | Portable signal (801-12081) | LS | 1 | $40,000 | $26,464 | $40,000 | $3,500.00 |
| 0091 | Driveway assistance device (801-12482) | EACH | 3 | $12,000 | $6,245.00 | $6,500.00 | $900.00 |
| 0092 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $500.00 | $400.00 | $987.00 | $239.00 |
| 0093 | Temporary buzz strips (801-97643) | LFT | 396 | $25.00 | $20.00 | $20.88 | $30.45 |
| 0094 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 382 | $2.50 | $0.75 | $0.98 | $5.41 |
| 0095 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 382 | $2.50 | $0.75 | $0.98 | $2.75 |
| 0096 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 610 | $2.50 | $1.00 | $1.38 | $1.79 |
| 0097 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 610 | $2.50 | $1.00 | $1.38 | $1.80 |
| 0098 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 3 | $400.00 | $100.00 | $25.00 | $70.00 |
| 0099 | Snowplowable raised pavement marker (808-75998) | EACH | 5 | $400.00 | $200.00 | $100.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.