INDOT contract B-44436-A bid tabulation

SMALL STRUCTURE REPLACEMENT WITH BRIDGE. Let by Indiana DOT on August 5, 2026, Jennings, Seymour. 10 bids received; low bid $570,215 by Paul H Rohe Company Inc.

Owner
Indiana DOT
Letting
05 AUG 2026
Pay items
58
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Paul H Rohe Company Inc$570,215Low
2Force Construction Co Inc$586,335+3.0%
3Olco Inc$594,392+4.0%
4Dave O'Mara Contractor Inc$618,907+9.0%
5Paf Construction, LLC$635,598+11%
65 Star Company Inc$648,888+14%
7Milestone Contractors LP$674,297+18%
8Libs Paving Company Inc$696,770+22%
9Morphey Construction Inc.$759,759+33%
10Mac Construction & Excavating Inc$961,000+69%
INDOT contract B-44436-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Paul H Rohe Company Inc2. Force Construction Co Inc3. Olco Inc4. Dave O'Mara Contractor Inc5. Paf Construction, LLC6. 5 Star Company Inc
0001Construction engineering (105-06845)LS1$8,823.00$9,539.00$11,823$10,585$39,000$13,790
0002Inspection hole, deeper than 3 FT (107-09358)EACH3$800.00$1,097.00$1.00$1,275.00$1,400.00$550.00
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$24,860$29,000$11,684$30,900$35,000$52,600
0011Clearing right-of-way (201-52370)LS1$7,530.00$907.00$10,818$12,300$10,000$12,500
0012Excavation, common (203-02000)CYS125$80.00$55.00$46.44$87.00$150.00$50.00
0013Pump around (205-11626)EACH2$7,700.00$7,079.00$5,804.50$17,418$6,000.00$7,500.00
0014Stormwater management budget (205-12108)DOL6,300$1.00$1.00$1.00$1.00$1.00$1.00
0015Stormwater management implementation (205-12616)LS1$3,000.00$8,947.00$3,501.77$2,500.00$13,500$6,000.00
0018Subgrade treatment, type II (207-08264)SYS283$35.00$46.00$27.10$32.00$20.00$45.00
0019Subgrade treatment, type IC (207-09935)SYS185$65.00$70.00$47.31$54.00$41.50$58.00
0020Structure backfill, type 2 (211-09265)CYS445$90.00$74.00$67.81$84.00$70.00$70.00
0021Geotextile for pavement, type 2B (214-12239)SYS197$10.00$11.00$5.91$9.75$10.00$5.00
0022Compacted aggregate, no. 53 (301-12234)CYS42$110.00$113.00$88.70$67.00$100.00$53.00
0023Compacted aggregate, no. 53 (303-01180)TON11$110.00$89.00$84.65$55.00$140.00$45.00
0024Milling, transition (306-08043)SYS308$9.00$20.00$13.86$20.00$11.00$11.00
0025Milling, approach (306-08432)SYS45$26.00$30.00$22.54$20.00$32.00$11.00
0026QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON44$280.00$216.00$265.46$200.00$328.00$220.00
0027Joint adhesive (401-11526)LFT465$1.00$0.55$2.18$0.50$1.25$1.00
0028Asphalt for tack coat (406-05521)SYS923$1.00$0.55$1.21$0.50$3.25$1.00
0029HMA for approaches, type B (610-07487)TON55$220.00$216.00$213.85$200.00$292.00$190.00
0030Right-of-way marker (615-06490)EACH6$260.00$281.00$350.00$285.00$375.00$271.00
0031Monument, type B (615-06505)EACH3$1,550.00$1,676.00$1,400.00$1,700.00$1,500.00$1,600.00
0032Riprap, class 1 (616-05688)TON104$100.00$122.00$77.13$89.00$135.00$160.00
0033Riprap, revetment (616-06405)TON56$74.00$88.00$55.05$65.00$145.00$120.00
0034Geotextile for riprap, type 1A (616-12246)SYS230$6.00$5.00$3.73$5.60$3.50$5.00
0035Mobilization and demobilization for seeding (621-01004)EACH1$1,500.00$1,622.00$250.11$1,000.00$1,650.00$500.00
0036Mulched seeding, type R (621-06559)SYS461$6.00$4.10$4.66$3.00$5.25$3.90
0037Computer system equipment (628-11976)EACH5$900.00$743.00$710.37$357.00$800.00$500.00
0038Field office, type D (628-12683)MOS6$3,650.00$3,979.00$1,575.54$1,998.00$5,000.00$1,690.00
0039Waterproofing membrane, type 2 (714-000086)SFT3,030$4.00$2.50$5.14$3.80$7.25$4.00
0040Structure, reinforced concrete, box sections, 20 FT X 9 FT (714-11130)LFT50$3,800.00$3,254.00$4,632.96$4,658.00$3,725.00$4,980.00
0041Structure, reinforced concrete, box sections, 4 FT X 3 FT (714-11192)LFT60$715.00$585.00$1,356.12$637.00$825.00$905.00
0043Road closure sign assembly (801-04308)EACH8$150.00$300.00$150.00$250.00$175.00$155.00
0044Detour route marker assembly (801-06625)EACH59$75.00$150.00$75.00$245.00$100.00$81.00
0045Construction sign, type A (801-06640)EACH4$200.00$234.00$200.00$200.00$250.00$215.00
0046Maintaining traffic (801-06775)LS1$12,675$71,001$13,834$18,204$8,500.00$31,500
0047Barricade, type III-A (801-07118)LFT72$12.00$18.00$12.00$14.00$15.00$13.00
0048Barricade, type III-B (801-07119)LFT96$12.00$18.00$12.00$15.00$15.00$13.00
0049Portable changeable message sign (801-11642)EACH3$2,000.00$1,344.00$2,000.00$1,875.00$2,125.00$2,200.00
0050Sign post, square, type 1, reinforced anchor base (802-05701)LFT36$32.00$35.00$38.00$35.00$42.00$35.00
0051Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT12$59.00$64.00$48.00$65.00$53.00$62.00
0052Sign, ground mounted, reset (802-91122)EACH3$375.00$405.00$250.00$400.00$300.00$400.00
0053Line, paint, broken, yellow, 4 in. (808-06712)LFT38$5.00$15.00$5.00$13.00$5.00$6.00
0054Line, paint, solid, white, 4 in. (808-06713)LFT242$2.00$15.00$2.00$3.50$3.25$3.00
0055Transverse marking, paint, stop line, white, 24 in. (808-06726)LFT14$10.00$9.00$10.00$30.00$10.00$11.00
0056Snowplowable raised pavement marker, remove (808-75996)EACH2$115.00$270.00$18.24$125.00$600.00$15.00
0057Snowplowable raised pavement marker (808-75998)EACH2$500.00$2,087.00$500.00$1,000.00$600.00$550.00
0058Present structure, remove, structure no. CV 003-040-10793 (202-51330)LS1$33,090$16,180$23,827$21,780$20,000$16,500
0059Present structure, remove, structure no. CLV-7130 (202-51330)LS1$12,770$12,490$13,610$8,712.00$10,000$5,500.00
0060QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON24$230.00$216.00$210.62$200.00$290.00$185.00
0061QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON58$190.00$216.00$206.92$200.00$190.00$185.00
INDOT contract B-44436-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of August 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy