INDOT contract R-45636-A bid tabulation
HMA OVERLAY, PREVENTIVE MAINTENANCE. Let by Indiana DOT on February 11, 2026, Morgan, Seymour. 5 bids received; low bid $227,722 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 48
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $227,722 | Low |
| 2 | Paf Construction, LLC | $263,165 | +16% |
| 3 | Calumet Civil Contractors Inc | $288,000 | +26% |
| 4 | Milestone Contractors LP | $289,523 | +27% |
| 5 | Rieth-Riley Construction Co., Inc. | $359,499 | +58% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Paf Construction, LLC | 3. Calumet Civil Contractors Inc | 4. Milestone Contractors LP | 5. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $5,065.25 | $28,600 | $1,300.00 | $6,000.00 | $4,800.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $6,787.50 | $15,000 | $14,200 | $13,991 | $32,193 |
| 0010 | Clearing and grubbing (201-01015) | LS | 1 | $14,400 | $9,750.00 | $18,945 | $28,500 | $27,351 |
| 0011 | Pipe abandon and grout fill (202-02637) | LFT | 23 | $100.00 | $75.00 | $69.00 | $160.00 | $40.03 |
| 0012 | Catch basin, remove (202-02928) | EACH | 1 | $850.00 | $500.00 | $699.00 | $1,400.00 | $1,896.02 |
| 0013 | Pipe, remove (202-96133) | LFT | 165 | $33.00 | $20.00 | $33.50 | $52.00 | $37.58 |
| 0014 | Excavation, common (203-02000) | CYS | 435 | $69.00 | $30.00 | $48.00 | $42.00 | $123.40 |
| 0015 | Stormwater management budget (205-12108) | DOL | 3,035 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $2,200.00 | $3,035.00 | $8,000.00 | $9,200.00 | $12,254 |
| 0017 | Subgrade treatment, type II (207-08264) | SYS | 469 | $31.50 | $18.00 | $23.00 | $31.02 | $47.14 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 54 | $75.00 | $80.00 | $80.00 | $110.00 | $80.11 |
| 0019 | Geogrid, type IB (214-11796) | SYS | 469 | $2.75 | $5.00 | $6.50 | $2.00 | $3.30 |
| 0020 | Compacted aggregate, no. 8 (301-12233) | CYS | 22 | $80.00 | $75.00 | $115.00 | $150.00 | $148.99 |
| 0021 | Compacted aggregate, no. 53 (301-12234) | CYS | 79 | $100.00 | $80.00 | $103.00 | $110.00 | $114.05 |
| 0022 | HMA patching, full depth, type B (304-12623) | TON | 129 | $140.00 | $300.00 | $168.00 | $280.00 | $233.15 |
| 0023 | Milling, asphalt, 1 1/4 in. (306-08563) | SYS | 3,462 | $5.25 | $1.50 | $5.50 | $5.70 | $5.59 |
| 0024 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 280 | $140.00 | $175.00 | $143.00 | $150.00 | $155.63 |
| 0025 | Joint adhesive (401-11526) | LFT | 3,462 | $0.50 | $1.00 | $1.00 | $0.40 | $0.90 |
| 0026 | Asphalt for tack coat (406-05521) | SYS | 3,996 | $0.25 | $0.25 | $1.00 | $0.15 | $0.01 |
| 0027 | Fence, chain link, reset (603-06065) | LFT | 140 | $60.00 | $40.00 | $136.00 | $68.00 | $136.00 |
| 0028 | Parking barrier, concrete (615-11537) | EACH | 4 | $350.00 | $500.00 | $570.00 | $250.00 | $1,266.97 |
| 0029 | Parking barrier, reset (615-97768) | EACH | 4 | $24.00 | $500.00 | $291.00 | $100.00 | $446.09 |
| 0030 | Riprap, revetment (616-06405) | TON | 12 | $125.00 | $250.00 | $98.00 | $200.00 | $171.66 |
| 0031 | Geotextile for riprap, type 1A (616-12246) | SYS | 27 | $6.00 | $32.00 | $47.00 | $40.00 | $9.67 |
| 0032 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $650.00 | $750.00 | $900.00 | $700.00 | $700.00 |
| 0033 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $957.00 | $550.00 | $750.00 | $10.00 | $10.00 |
| 0034 | Mulched seeding, type U (621-06560) | SYS | 727 | $2.50 | $5.00 | $16.00 | $4.00 | $4.00 |
| 0035 | Water (621-06567) | KGAL | 2 | $50.00 | $500.00 | $15.00 | $0.01 | $0.01 |
| 0036 | Sodding, nursery (621-06575) | SYS | 339 | $19.00 | $20.00 | $32.00 | $14.00 | $14.00 |
| 0037 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 181 | $76.25 | $75.00 | $98.00 | $73.00 | $48.73 |
| 0038 | PCCP for structure installation (715-08283) | SYS | 5 | $425.00 | $115.00 | $560.00 | $900.00 | $586.15 |
| 0039 | Pipe end section, diameter 12 in. (715-46000) | EACH | 1 | $622.00 | $2,600.00 | $1,650.00 | $1,500.00 | $1,922.53 |
| 0040 | Inlet, type HA5 (720-45042) | EACH | 1 | $4,600.00 | $3,250.00 | $4,000.00 | $6,500.00 | $4,547.36 |
| 0041 | Barricade, type III-A (801-07118) | LFT | 48 | $38.50 | $25.00 | $10.00 | $10.00 | $10.00 |
| 0042 | Bollard (802-03896) | EACH | 2 | $1,134.00 | $2,500.00 | $3,300.00 | $500.00 | $5,511.98 |
| 0043 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 6 | $35.75 | $125.00 | $170.00 | $40.00 | $170.00 |
| 0044 | Sign post, type B (802-76065) | LFT | 21 | $7.25 | $40.00 | $25.00 | $25.00 | $25.00 |
| 0045 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 2,219 | $0.75 | $2.00 | $2.88 | $2.88 | $2.88 |
| 0046 | Line, remove (808-06716) | LFT | 99 | $0.50 | $10.00 | $0.85 | $0.85 | $0.85 |
| 0047 | Line, paint, solid, blue, 4 in. (808-09314) | LFT | 567 | $0.75 | $5.00 | $4.69 | $4.69 | $4.69 |
| 0048 | Pavement message marking, paint, ADA accessible symbol (808-97222) | EACH | 5 | $77.00 | $500.00 | $750.00 | $750.00 | $750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.