INDOT contract R-44051-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Owen, Seymour. 8 bids received; low bid $1,396,263 by Crider & Crider Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 77
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crider & Crider Inc | $1,396,263 | Low |
| 2 | Morphey Construction Inc. | $1,478,220 | +6.0% |
| 3 | E & B Paving LLC | $1,597,430 | +14% |
| 4 | His Constructors Inc | $1,630,546 | +17% |
| 5 | Paf Construction, LLC | $1,699,379 | +22% |
| 6 | Ragle, Inc. | $1,780,329 | +28% |
| 7 | Milestone Contractors LP | $1,984,294 | +42% |
| 8 | CLR Inc | $2,110,878 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crider & Crider Inc | 2. Morphey Construction Inc. | 3. E & B Paving LLC | 4. His Constructors Inc | 5. Paf Construction, LLC | 6. Ragle, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $63,184 | $10,000 | $40,000 | $9,700.00 | $90,000 | $65,000 |
| 0002 | Railroad flagging budget (107-12976) | DOL | 51,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $39,308 | $74,000 | $78,000 | $73,485 | $90,000 | $89,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $58,366 | $20,000 | $52,000 | $43,008 | $45,000 | $35,000 |
| 0013 | Paved side ditch, remove (202-02272) | LFT | 225 | $18.62 | $60.00 | $22.00 | $23.00 | $50.00 | $16.50 |
| 0014 | Pipe abandon and grout fill (202-02637) | LFT | 55 | $42.64 | $130.00 | $37.00 | $59.00 | $30.00 | $30.00 |
| 0015 | Railroad , remove and reset tracks (202-04997) | LS | 1 | $26,000 | $40,000 | $35,000 | $45,300 | $52,000 | $65,000 |
| 0016 | Sign and supports, channel posts, remove (202-74045) | EACH | 2 | $135.75 | $25.00 | $125.00 | $135.00 | $150.00 | $68.00 |
| 0017 | Guardrail end treatment, remove (202-93741) | EACH | 5 | $491.71 | $300.00 | $750.00 | $540.00 | $600.00 | $750.00 |
| 0018 | Excavation, common (203-02000) | CYS | 1,899 | $44.46 | $60.00 | $73.00 | $40.00 | $50.00 | $26.50 |
| 0019 | Excavation, rock (203-02010) | CYS | 41 | $256.92 | $170.00 | $195.00 | $176.00 | $150.00 | $120.00 |
| 0020 | Excavation, unclassified (203-02020) | CYS | 334 | $134.12 | $100.00 | $50.00 | $37.00 | $125.00 | $65.00 |
| 0021 | Borrow (203-02070) | CYS | 1,602 | $5.00 | $30.00 | $20.00 | $33.00 | $60.00 | $50.00 |
| 0022 | Pump around (205-11626) | EACH | 2 | $13,024 | $5,000.00 | $8,650.00 | $20,000 | $4,500.00 | $26,500 |
| 0023 | Stormwater management budget (205-12108) | DOL | 32,925 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $6,730.27 | $5,000.00 | $23,000 | $10,000 | $15,000 | $25,000 |
| 0025 | Subgrade treatment, type IC (207-09935) | SYS | 1,099 | $37.56 | $40.00 | $28.00 | $38.00 | $49.00 | $43.00 |
| 0026 | Structure backfill, type 2 (211-09265) | CYS | 1,317 | $81.79 | $70.00 | $150.00 | $70.00 | $60.00 | $60.00 |
| 0027 | Structure backfill, type 5 (211-09268) | CYS | 8 | $286.06 | $200.00 | $250.00 | $210.00 | $275.00 | $500.00 |
| 0028 | Structure backfill, type 5 , CLSM (211-09268) | CYS | 289 | $227.19 | $200.00 | $183.00 | $195.00 | $275.00 | $500.00 |
| 0029 | Geogrid, type IB (214-11796) | SYS | 1,099 | $2.13 | $2.00 | $0.80 | $3.00 | $2.00 | $2.65 |
| 0030 | Compacted aggregate, no. 5 (301-12232) | CYS | 115 | $145.20 | $120.00 | $215.00 | $92.00 | $200.00 | $120.00 |
| 0031 | Compacted aggregate, no. 53 (303-01180) | TON | 476 | $62.12 | $50.00 | $53.00 | $42.00 | $100.00 | $48.25 |
| 0032 | Subballast (303-90466) | TON | 37 | $103.75 | $55.00 | $125.00 | $57.00 | $500.00 | $52.00 |
| 0033 | Ballast (303-92491) | TON | 28 | $150.00 | $130.00 | $125.00 | $260.00 | $750.00 | $240.00 |
| 0034 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,794 | $5.00 | $5.00 | $4.00 | $4.00 | $2.50 | $4.00 |
| 0035 | Lean concrete base, 9 in. (309-12695) | SYS | 205 | $70.44 | $90.00 | $82.00 | $96.00 | $110.00 | $95.00 |
| 0036 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 325 | $145.00 | $150.00 | $142.00 | $154.00 | $250.00 | $142.00 |
| 0037 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 152 | $140.00 | $130.00 | $130.00 | $141.00 | $240.00 | $130.00 |
| 0038 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 381 | $140.00 | $130.00 | $130.00 | $141.00 | $165.00 | $130.00 |
| 0039 | Joint adhesive (401-11526) | LFT | 4,628 | $0.70 | $1.00 | $0.65 | $0.70 | $1.00 | $0.65 |
| 0040 | Asphalt for tack coat (406-05520) | TON | 3 | $750.00 | $700.00 | $700.00 | $750.00 | $750.00 | $700.00 |
| 0041 | Guardrail, remove (601-02241) | LFT | 1,004 | $9.82 | $3.00 | $3.25 | $7.00 | $7.25 | $3.25 |
| 0042 | Guardrail height transition, MGS (601-12289) | EACH | 3 | $1,000.00 | $950.00 | $950.00 | $1,140.00 | $1,250.00 | $950.00 |
| 0043 | Guardrail end treatment, type OS (601-94689) | EACH | 5 | $2,500.00 | $2,400.00 | $2,400.00 | $3,590.00 | $3,750.00 | $2,400.00 |
| 0044 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 988 | $25.00 | $23.00 | $23.00 | $28.00 | $30.00 | $23.00 |
| 0045 | Monument, type B (615-06505) | EACH | 6 | $1,150.00 | $1,125.00 | $1,125.00 | $1,140.00 | $1,250.00 | $1,125.00 |
| 0046 | Riprap, class 1 (616-05688) | TON | 248 | $105.71 | $150.00 | $127.00 | $89.00 | $140.00 | $85.00 |
| 0047 | Riprap, revetment (616-06405) | TON | 262 | $87.60 | $130.00 | $115.00 | $70.00 | $100.00 | $68.00 |
| 0048 | Geotextile for riprap, type 1A (616-12246) | SYS | 801 | $3.04 | $2.00 | $2.00 | $3.25 | $3.00 | $3.25 |
| 0049 | Geotextile for riprap, type 2B (616-12249) | SYS | 687 | $4.96 | $3.00 | $3.00 | $5.40 | $4.50 | $5.75 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $900.00 | $800.00 | $900.00 | $870.00 | $1,000.00 | $800.00 |
| 0051 | Fertilizer for permanent seeding (621-06545) | TON | 2 | $5.00 | $1.00 | $800.00 | $1.05 | $100.00 | $10.00 |
| 0052 | Seed mixture, type R (621-06553) | LBS | 188 | $8.00 | $10.00 | $4.25 | $7.60 | $10.00 | $7.00 |
| 0053 | Sodding (621-06574) | SYS | 206 | $25.00 | $35.00 | $35.00 | $24.00 | $25.00 | $26.50 |
| 0054 | Computer system equipment (628-11976) | EACH | 2 | $1,000.00 | $1,000.00 | $284.00 | $270.00 | $950.00 | $750.00 |
| 0055 | Field office, type D (628-12683) | MOS | 6 | $2,500.00 | $4,200.00 | $3,800.00 | $8,075.00 | $4,000.00 | $3,300.00 |
| 0056 | Waterproofing membrane, type 2 (714-000086) | SFT | 5,880 | $3.08 | $3.00 | $3.00 | $6.25 | $5.00 | $5.00 |
| 0057 | Structure, reinforced concrete, box sections, 6 FT X 4 FT (714-11174) | LFT | 120 | $1,192.38 | $1,400.00 | $1,495.00 | $2,155.00 | $975.00 | $1,950.00 |
| 0058 | Structure, reinforced concrete, box sections, 7 FT X 5 FT (714-11311) | LFT | 118 | $980.37 | $1,300.00 | $1,167.00 | $1,840.00 | $975.00 | $1,825.00 |
| 0059 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 5 | $510.04 | $125.00 | $179.00 | $320.00 | $500.00 | $110.00 |
| 0060 | Inlet, cap (720-44296) | EACH | 1 | $1,390.91 | $1,300.00 | $1,800.00 | $2,270.00 | $2,500.00 | $1,250.00 |
| 0061 | Catch basin, type E7 (720-45235) | EACH | 1 | $5,441.16 | $4,000.00 | $5,000.00 | $4,400.00 | $4,000.00 | $4,800.00 |
| 0062 | Manhole, type C4, modified (720-45510) | EACH | 1 | $6,062.32 | $3,000.00 | $5,000.00 | $5,345.00 | $3,500.00 | $4,250.00 |
| 0063 | Road closure sign assembly (801-04308) | EACH | 8 | $300.00 | $150.00 | $300.00 | $325.00 | $200.00 | $300.00 |
| 0064 | Detour route marker assembly (801-06625) | EACH | 202 | $85.00 | $75.00 | $85.00 | $93.00 | $90.00 | $30.00 |
| 0065 | Construction sign, type A (801-06640) | EACH | 52 | $100.00 | $150.00 | $100.00 | $110.00 | $175.00 | $160.00 |
| 0066 | Construction sign, type B (801-06645) | EACH | 8 | $75.00 | $75.00 | $75.00 | $82.00 | $100.00 | $110.00 |
| 0067 | Maintaining traffic (801-06775) | LS | 1 | $24,997 | $55,841 | $25,003 | $20,000 | $16,000 | $78,250 |
| 0068 | Barricade, type III-A (801-07118) | LFT | 160 | $18.00 | $11.00 | $18.00 | $19.00 | $14.00 | $16.00 |
| 0069 | Barricade, type III-B (801-07119) | LFT | 240 | $18.00 | $11.00 | $18.00 | $19.00 | $14.00 | $16.00 |
| 0070 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 19 | $27.00 | $26.00 | $26.00 | $30.00 | $40.00 | $27.50 |
| 0071 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 15 | $30.00 | $28.00 | $28.00 | $35.00 | $40.00 | $27.50 |
| 0072 | Line, thermoplastic, broken, white, 4 in. (808-06701) | LFT | 90 | $1.30 | $3.00 | $1.25 | $1.35 | $3.00 | $1.20 |
| 0073 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 1,507 | $1.30 | $3.00 | $1.25 | $1.35 | $3.00 | $1.00 |
| 0074 | Grooving for pavement markings (808-12032) | LFT | 3,104 | $1.30 | $2.00 | $1.25 | $1.35 | $2.00 | $0.85 |
| 0075 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 1,507 | $1.30 | $3.00 | $1.25 | $1.35 | $3.00 | $1.00 |
| 0076 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 29 | $30.00 | $10.00 | $26.00 | $38.00 | $60.00 | $17.50 |
| 0077 | Snowplowable raised pavement marker (808-75998) | EACH | 29 | $300.00 | $75.00 | $295.00 | $320.00 | $90.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.