INDOT contract R-43956-A bid tabulation
SMALL STRUCTURES AND DRAINS CONSTRUCTION. Let by Indiana DOT on January 14, 2026, Hancock, Greenfield. 6 bids received; low bid $178,000 by Calumet Civil Contractors Inc.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 24
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Calumet Civil Contractors Inc | $178,000 | Low |
| 2 | Paf Construction, LLC | $197,368 | +11% |
| 3 | Morphey Construction Inc. | $208,000 | +17% |
| 4 | Yarberry Companies Inc | $237,538 | +33% |
| 5 | 3D Company Inc | $242,098 | +36% |
| 6 | Midwest Mole Inc | $260,581 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Calumet Civil Contractors Inc | 2. Paf Construction, LLC | 3. Morphey Construction Inc. | 4. Yarberry Companies Inc | 5. 3D Company Inc | 6. Midwest Mole Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $2,520.00 | $14,500 | $2,500.00 | $5,000.00 | $5,390.00 | $6,000.00 |
| 0002 | Utility protection (105-12018) | LS | 1 | $2,497.64 | $3,000.00 | $1.00 | $5,000.00 | $8,165.00 | $7,000.00 |
| 0003 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 10 | $311.18 | $860.00 | $590.00 | $600.00 | $970.00 | $1,000.00 |
| 0004 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 5 | $311.21 | $700.00 | $590.00 | $500.00 | $620.00 | $2,000.00 |
| 0005 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $8,316.38 | $10,000 | $10,350 | $15,000 | $24,400 | $13,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $302.28 | $5,000.00 | $9,400.00 | $10,000 | $7,305.00 | $600.00 |
| 0012 | Stormwater management budget (205-12108) | DOL | 2,683 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Stormwater management implementation (205-12616) | LS | 1 | $6,635.00 | $11,300 | $1,300.00 | $10,000 | $6,905.00 | $10,000 |
| 0014 | Riprap, class 2 (616-05689) | TON | 7 | $367.97 | $200.00 | $800.00 | $400.00 | $330.00 | $1,000.00 |
| 0015 | Riprap, revetment (616-06405) | TON | 5 | $406.45 | $200.00 | $700.00 | $400.00 | $390.00 | $900.00 |
| 0016 | Geotextile for riprap, type 1A (616-12246) | SYS | 25 | $5.63 | $36.00 | $25.00 | $20.00 | $29.45 | $165.00 |
| 0017 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $2,000.00 | $700.00 | $575.00 | $800.00 | $865.00 | $1,000.00 |
| 0020 | Pipe, type 1, circular, diameter 21 in. (715-05122) | LFT | 136 | $131.60 | $135.00 | $0.01 | $60.00 | $80.48 | $175.00 |
| 0021 | Pipe end section, diameter 21 in. (715-46015) | EACH | 2 | $2,080.27 | $1,300.00 | $4,500.00 | $3,000.00 | $1,690.00 | $5,500.00 |
| 0022 | Pipe installation, trenchless, 21 in. (716-09631) | LFT | 136 | $770.00 | $750.00 | $900.00 | $1,000.00 | $931.57 | $875.00 |
| 0023 | Construction sign, type A (801-06640) | EACH | 10 | $239.00 | $210.00 | $200.00 | $175.00 | $204.00 | $380.00 |
| 0024 | Construction sign, type B (801-06645) | EACH | 2 | $117.00 | $100.00 | $75.00 | $150.00 | $105.00 | $190.00 |
| 0025 | Maintaining traffic (801-06775) | LS | 1 | $4,500.00 | $8,000.00 | $19,940 | $20,000 | $19,800 | $20,000 |
| 0026 | Mulched seeding, type U (621-06560) | SYS | 608 | $15.99 | $2.50 | $15.00 | $5.00 | $9.07 | $11.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.