INDOT contract R-43739-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on September 10, 2025, Decatur, Seymour. 10 bids received; low bid $2,242,000 by Calumet Civil Contractors Inc.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 70
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Calumet Civil Contractors Inc | $2,242,000 | Low |
| 2 | His Constructors Inc | $2,674,110 | +19% |
| 3 | Force Construction Co Inc | $2,680,915 | +20% |
| 4 | 5 Star Company Inc | $2,749,041 | +23% |
| 5 | Milestone Contractors LP | $2,777,000 | +24% |
| 6 | Beaty Construction Inc | $2,815,943 | +26% |
| 7 | Dave Omara Contractor Inc | $2,959,237 | +32% |
| 8 | Paul H Rohe Company Inc | $2,959,692 | +32% |
| 9 | Morphey Construction Inc. | $3,090,000 | +38% |
| 10 | Sunesis Construction Company | $3,627,509 | +62% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Calumet Civil Contractors Inc | 2. His Constructors Inc | 3. Force Construction Co Inc | 4. 5 Star Company Inc | 5. Milestone Contractors LP | 6. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,000 | $10,800 | $18,700 | $25,500 | $16,000 | $12,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $95,918 | $104,060 | $129,000 | $103,000 | $110,000 | $140,750 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $19,750 | $12,310 | $14,500 | $280,000 | $28,150 |
| 0012 | Pavement removal (202-02240) | SYS | 1,965 | $17.00 | $15.00 | $18.00 | $32.00 | $30.20 | $28.00 |
| 0013 | Excavation, common (203-02000) | CYS | 905 | $55.00 | $39.00 | $53.00 | $45.00 | $80.55 | $45.00 |
| 0014 | Borrow (203-02070) | CYS | 142 | $10.00 | $54.00 | $37.00 | $15.00 | $1.00 | $1.00 |
| 0015 | Pump around (205-11626) | EACH | 6 | $7,000.00 | $29,900 | $10,650 | $12,100 | $17,031 | $11,000 |
| 0016 | Stormwater management budget (205-12108) | DOL | 55,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $25,000 | $28,500 | $35,451 | $12,000 | $10,955 | $20,000 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 5,518 | $33.00 | $35.00 | $27.00 | $50.00 | $35.02 | $37.00 |
| 0019 | B borrow (211-02050) | CYS | 30 | $75.00 | $102.00 | $61.00 | $38.00 | $42.12 | $85.00 |
| 0020 | Structure backfill, type 2 (211-09265) | CYS | 765 | $66.00 | $81.00 | $70.00 | $102.00 | $57.63 | $165.00 |
| 0021 | Structure backfill, type 5 (211-09268) | CYS | 359 | $215.00 | $238.00 | $178.00 | $165.00 | $212.66 | $302.00 |
| 0022 | Compacted aggregate, no. 8 (301-12233) | CYS | 335 | $65.00 | $87.00 | $62.00 | $108.00 | $125.20 | $159.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 1,800 | $32.00 | $35.00 | $37.00 | $56.00 | $42.63 | $38.00 |
| 0024 | Widening with HMA, type D (304-07789) | TON | 1,105 | $100.00 | $167.00 | $187.00 | $188.00 | $104.00 | $100.00 |
| 0025 | Milling, transition (306-08043) | SYS | 1,795 | $4.50 | $6.00 | $7.70 | $13.00 | $14.27 | $8.00 |
| 0026 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 320 | $206.00 | $206.00 | $164.00 | $184.00 | $200.00 | $206.00 |
| 0027 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 220 | $227.00 | $200.00 | $164.00 | $181.00 | $210.00 | $227.00 |
| 0028 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 885 | $115.00 | $173.00 | $164.00 | $178.00 | $140.00 | $115.00 |
| 0029 | Joint adhesive (401-11526) | LFT | 8,020 | $0.55 | $0.90 | $0.50 | $1.00 | $1.10 | $0.55 |
| 0030 | HMA for temporary pavement, type D (402-10087) | TON | 505 | $230.00 | $206.00 | $177.00 | $285.00 | $175.00 | $230.00 |
| 0031 | Asphalt for tack coat (406-05520) | TON | 4 | $0.01 | $1,295.00 | $675.00 | $1,100.00 | $650.00 | $0.01 |
| 0032 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $5,600.00 | $6,480.00 | $3,325.00 | $7,000.00 | $7,000.00 | $5,600.00 |
| 0033 | Milled HMA corrugations, conventional (606-12399) | LFT | 680 | $12.45 | $8.50 | $16.00 | $8.00 | $1.00 | $14.00 |
| 0034 | Riprap, class 1 (616-05688) | TON | 175 | $100.00 | $72.00 | $91.00 | $84.00 | $70.34 | $105.00 |
| 0035 | Riprap, revetment (616-06405) | TON | 385 | $90.00 | $60.00 | $73.00 | $48.00 | $56.24 | $75.00 |
| 0036 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,569 | $3.75 | $3.50 | $2.40 | $5.00 | $2.99 | $4.00 |
| 0037 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $200.00 | $865.00 | $208.00 | $220.00 | $800.00 | $200.00 |
| 0038 | Mulched seeding, type R (621-06559) | SYS | 11,600 | $4.00 | $1.60 | $1.60 | $3.00 | $1.50 | $1.50 |
| 0039 | Computer system equipment (628-11976) | EACH | 2 | $1,500.00 | $540.00 | $1,039.00 | $500.00 | $600.00 | $1,000.00 |
| 0040 | Field office, type D (628-12683) | MOS | 12 | $6,500.00 | $5,650.00 | $4,669.00 | $3,200.00 | $3,600.00 | $3,500.00 |
| 0041 | Waterproofing membrane type 2 (714-000086) | SFT | 8,550 | $1.62 | $3.65 | $3.20 | $2.50 | $3.45 | $5.00 |
| 0042 | Structure, reinforced concrete, box sections, 9 FT X 6 FT (714-11073) | LFT | 234 | $1,120.00 | $1,165.00 | $1,177.00 | $1,128.00 | $1,196.75 | $1,800.00 |
| 0043 | Structure, reinforced concrete, box sections, 8 FT X 5 FT (714-11178) | LFT | 202 | $970.00 | $1,040.00 | $1,066.00 | $1,305.00 | $920.57 | $1,650.00 |
| 0044 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 468 | $11.50 | $18.00 | $18.00 | $10.00 | $63.90 | $24.00 |
| 0045 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 504 | $20.00 | $18.00 | $22.00 | $12.00 | $63.06 | $39.00 |
| 0046 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 66 | $74.39 | $83.00 | $93.00 | $31.00 | $147.29 | $100.00 |
| 0047 | Outlet protector, type 1 (718-06528) | EACH | 5 | $500.00 | $2,650.00 | $1,395.00 | $2,250.00 | $5,155.25 | $3,000.00 |
| 0048 | Geotextile for underdrains, type 1A (718-12305) | SYS | 82 | $3.50 | $6.50 | $7.30 | $5.00 | $12.30 | $27.00 |
| 0049 | Aggregate for underdrains (718-52610) | CYS | 113 | $100.00 | $64.00 | $54.00 | $95.00 | $41.97 | $60.00 |
| 0050 | Casting, type 7, furnish and adjust to grade (720-44040) | EACH | 1 | $1,500.00 | $950.00 | $1,281.00 | $700.00 | $1,196.75 | $2,200.00 |
| 0051 | Inlet, type E7 (720-45030) | EACH | 2 | $3,500.00 | $2,315.00 | $2,248.00 | $1,705.00 | $4,787.02 | $3,400.00 |
| 0052 | Road closure sign assembly (801-04308) | EACH | 1 | $231.00 | $335.00 | $322.00 | $310.00 | $310.00 | $310.00 |
| 0053 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 18,250 | $2.02 | $1.80 | $2.10 | $1.80 | $1.68 | $1.68 |
| 0054 | Detour route marker assembly (801-06625) | EACH | 21 | $150.00 | $146.00 | $140.00 | $138.00 | $135.00 | $135.00 |
| 0055 | Construction sign, type A (801-06640) | EACH | 102 | $209.00 | $200.00 | $192.00 | $188.00 | $185.00 | $185.00 |
| 0056 | Construction sign, type B (801-06645) | EACH | 16 | $81.00 | $125.00 | $119.00 | $120.00 | $115.00 | $115.00 |
| 0057 | Flashing arrow sign (801-06710) | DAY | 240 | $25.00 | $19.00 | $18.00 | $18.00 | $17.55 | $17.55 |
| 0058 | Maintaining traffic (801-06775) | LS | 1 | $86,592 | $71,135 | $258,000 | $105,000 | $130,292 | $73,400 |
| 0059 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 4 | $10,137 | $7,110.00 | $10,530 | $11,200 | $10,138 | $10,138 |
| 0060 | Barricade, type III-A (801-07118) | LFT | 359 | $13.00 | $19.50 | $19.00 | $18.00 | $18.00 | $18.00 |
| 0061 | Barricade, type III-B (801-07119) | LFT | 24 | $15.00 | $19.50 | $19.00 | $18.00 | $18.00 | $18.00 |
| 0062 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,785 | $23.42 | $65.00 | $60.00 | $49.00 | $40.00 | $38.00 |
| 0063 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 270 | $44.38 | $135.00 | $108.00 | $50.00 | $82.00 | $75.00 |
| 0064 | Portable changeable message sign (801-11642) | EACH | 4 | $4,573.00 | $6,010.00 | $5,771.00 | $5,700.00 | $5,555.00 | $5,555.00 |
| 0065 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 680 | $4.14 | $1.35 | $1.30 | $1.30 | $1.25 | $1.25 |
| 0066 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 2,070 | $4.14 | $1.35 | $1.30 | $1.30 | $1.25 | $1.25 |
| 0067 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 540 | $4.14 | $1.35 | $1.30 | $1.30 | $1.25 | $1.25 |
| 0068 | Grooving for pavement markings (808-12032) | LFT | 3,290 | $1.00 | $0.70 | $0.70 | $0.80 | $0.65 | $0.65 |
| 0069 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 18 | $110.00 | $59.00 | $114.00 | $55.00 | $125.00 | $11.00 |
| 0070 | Snowplowable raised pavement marker (808-75998) | EACH | 18 | $130.00 | $70.00 | $366.00 | $65.00 | $65.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.