INDOT contract B-43770-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on August 6, 2025, Ripley, Seymour. 6 bids received; low bid $1,607,029 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 06 AUG 2025
- Pay items
- 92
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,607,029 | Low |
| 2 | Dave Omara Contractor Inc | $1,783,000 | +11% |
| 3 | Sunesis Construction Company | $1,857,427 | +16% |
| 4 | Ragle, Inc. | $1,888,041 | +17% |
| 5 | Paul H Rohe Company Inc | $1,928,024 | +20% |
| 6 | Milestone Contractors LP | $2,224,977 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Dave Omara Contractor Inc | 3. Sunesis Construction Company | 4. Ragle, Inc. | 5. Paul H Rohe Company Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $20,000 | $11,700 | $11,700 | $18,000 | $11,700 | $21,600 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $80,000 | $89,939 | $185,282 | $95,425 | $68,375 | $80,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $16,000 | $18,000 | $1,667.66 | $19,000 | $17,190 | $25,000 |
| 0011 | Pavement removal (202-02240) | SYS | 121 | $55.00 | $130.00 | $16.22 | $70.00 | $80.00 | $70.40 |
| 0012 | Regulated asbestos containing materials, remove (202-03135) | SFT | 22 | $50.00 | $659.00 | $503.96 | $100.00 | $300.00 | $550.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $200,000 | $164,000 | $171,512 | $196,000 | $369,260 | $310,000 |
| 0014 | Detector housing, remove (202-90277) | EACH | 4 | $330.00 | $300.00 | $302.37 | $125.00 | $300.00 | $300.00 |
| 0015 | Excavation, common (203-02000) | CYS | 680 | $60.00 | $95.00 | $72.03 | $45.00 | $47.95 | $95.60 |
| 0016 | Pump around (205-11626) | EACH | 1 | $12,500 | $70,000 | $25,453 | $30,000 | $21,330 | $70,900 |
| 0017 | Stormwater management budget (205-12108) | DOL | 11,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $3,500.00 | $22,960 | $15,000 | $2,500.00 | $14,300 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 1,708 | $45.00 | $45.00 | $56.19 | $45.00 | $40.37 | $44.10 |
| 0020 | Structure backfill, type 4 (211-09267) | CYS | 16 | $250.00 | $130.00 | $376.28 | $435.00 | $475.00 | $260.00 |
| 0021 | Geotextile for pavement, type 1A (214-12236) | SYS | 241 | $3.00 | $2.20 | $6.58 | $5.35 | $5.00 | $3.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,799 | $5.00 | $3.50 | $4.84 | $4.50 | $4.65 | $4.45 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 87 | $85.00 | $60.00 | $187.39 | $145.00 | $120.00 | $164.25 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 61 | $110.00 | $150.00 | $151.82 | $140.00 | $140.00 | $290.00 |
| 0025 | Compacted aggregate, no. 73 (303-07449) | TON | 44 | $110.00 | $45.00 | $101.26 | $50.00 | $80.00 | $59.20 |
| 0026 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 44 | $110.00 | $340.00 | $98.92 | $50.00 | $80.00 | $59.20 |
| 0027 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 455 | $20.00 | $25.00 | $11.98 | $12.00 | $13.00 | $16.90 |
| 0028 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 189 | $187.00 | $130.00 | $171.34 | $130.00 | $175.00 | $209.00 |
| 0029 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 223 | $163.00 | $130.00 | $149.17 | $130.00 | $150.00 | $177.75 |
| 0030 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 559 | $132.00 | $130.00 | $120.95 | $130.00 | $115.00 | $137.75 |
| 0031 | Joint adhesive, surface (401-10258) | LFT | 1,398 | $0.82 | $0.50 | $0.76 | $0.50 | $0.80 | $0.60 |
| 0032 | Joint adhesive, intermediate (401-10259) | LFT | 1,023 | $1.05 | $0.50 | $0.96 | $0.50 | $1.00 | $1.15 |
| 0033 | Asphalt for tack coat (406-05521) | SYS | 5,219 | $0.50 | $0.50 | $0.45 | $0.50 | $0.40 | $0.30 |
| 0034 | Fog seal (412-09355) | SYS | 1,989 | $0.60 | $0.10 | $0.55 | $0.10 | $0.45 | $1.15 |
| 0035 | Guardrail transition, type TGB , modified (601-01522) | EACH | 1 | $3,520.00 | $2,675.00 | $3,225.31 | $3,200.00 | $3,200.00 | $3,500.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 551 | $1.10 | $7.00 | $1.01 | $6.25 | $1.00 | $1.10 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 63 | $22.00 | $25.00 | $20.16 | $20.00 | $20.00 | $22.00 |
| 0038 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $2,970.00 | $3,900.00 | $2,721.36 | $2,700.00 | $2,700.00 | $3,000.00 |
| 0039 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,190.00 | $3,125.00 | $2,922.94 | $2,900.00 | $2,900.00 | $3,200.00 |
| 0040 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 241.70 | $315.00 | $250.00 | $370.63 | $260.00 | $230.00 | $425.00 |
| 0041 | HMA for approaches, type B (610-07487) | TON | 10 | $247.00 | $130.00 | $226.78 | $130.00 | $250.00 | $580.00 |
| 0042 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $310.00 | $280.00 | $157.06 | $280.00 | $280.00 | $275.00 |
| 0043 | Monument, type B (615-06505) | EACH | 4 | $1,300.00 | $1,180.00 | $1,209.49 | $1,200.00 | $1,200.00 | $1,300.00 |
| 0044 | Benchmark post (615-06530) | EACH | 1 | $660.00 | $600.00 | $1,905.47 | $1,200.00 | $600.00 | $830.00 |
| 0045 | Riprap, class 1 (616-05688) | TON | 318 | $75.00 | $115.00 | $134.60 | $135.00 | $110.00 | $160.50 |
| 0046 | Riprap, revetment (616-06405) | TON | 127 | $45.00 | $75.00 | $189.92 | $75.00 | $130.00 | $135.25 |
| 0047 | Geotextile for riprap, type 1A (616-12246) | SYS | 769 | $4.00 | $2.00 | $3.36 | $4.00 | $2.70 | $1.25 |
| 0048 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,650.00 | $1,000.00 | $1,511.87 | $1,500.00 | $1,000.00 | $1,700.00 |
| 0049 | Erosion control blanket (621-02770) | SYS | 1,056 | $1.92 | $3.25 | $1.76 | $1.75 | $3.25 | $1.95 |
| 0050 | Mulched seeding, type R (621-06559) | SYS | 1,056 | $1.65 | $3.25 | $3.30 | $1.50 | $3.25 | $1.65 |
| 0051 | Sodding (621-06574) | SYS | 29 | $115.00 | $135.00 | $110.69 | $125.00 | $135.00 | $115.50 |
| 0052 | Seed mixture, floodplain (621-12612) | LBS | 3 | $660.00 | $1,000.00 | $991.36 | $600.00 | $1,000.00 | $660.00 |
| 0053 | Sign, 'DO not mow or spray' (622-52436) | EACH | 4 | $93.00 | $110.00 | $85.67 | $85.00 | $110.00 | $93.60 |
| 0054 | Computer system equipment (628-11976) | EACH | 2 | $1,000.00 | $900.00 | $1,878.52 | $750.00 | $950.00 | $6,500.00 |
| 0055 | Field office, type D (628-12683) | MOS | 12 | $2,500.00 | $2,100.00 | $1,000.00 | $2,350.00 | $3,550.00 | $4,600.00 |
| 0056 | Temporary shoring (702-04325) | LS | 1 | $20,000 | $24,000 | $35,052 | $25,000 | $32,360 | $37,300 |
| 0057 | Reinforcing bars, epoxy coated (703-06029) | LBS | 53,410 | $1.50 | $1.45 | $1.87 | $1.85 | $1.60 | $1.85 |
| 0058 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 312 | $60.00 | $33.00 | $47.84 | $52.50 | $38.00 | $50.50 |
| 0059 | Concrete, C, superstructure (704-51002) | CYS | 168.30 | $1,650.00 | $2,825.00 | $2,519.43 | $3,150.00 | $3,040.00 | $3,200.00 |
| 0060 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 4 | $3,360.00 | $7,500.00 | $7,689.95 | $5,600.00 | $7,500.00 | $8,300.00 |
| 0061 | Railing, steel type PF-1 (706-11404) | LFT | 125 | $120.00 | $78.00 | $117.04 | $109.00 | $109.00 | $120.00 |
| 0062 | Railing, concrete type PF-1 (706-11602) | CYS | 6.60 | $1,850.00 | $3,951.00 | $4,140.83 | $3,500.00 | $3,951.00 | $4,900.00 |
| 0063 | Surface seal (709-51821) | LS | 1 | $1,750.00 | $2,989.39 | $16.34 | $1.00 | $2,490.00 | $2,700.00 |
| 0064 | Pipe, type 3, circular, diameter 24 in. (715-05173) | LFT | 14 | $200.00 | $80.00 | $331.39 | $160.00 | $320.00 | $220.00 |
| 0065 | Inlet, type E7 (720-45030) | EACH | 1 | $2,500.00 | $2,700.00 | $5,098.08 | $6,200.00 | $6,150.00 | $4,100.00 |
| 0066 | Longitudinal grooving (722-12732) | SYS | 538 | $12.00 | $3.50 | $13.79 | $10.00 | $5.00 | $3.85 |
| 0067 | Construction sign, type D (801-03291) | EACH | 2 | $110.00 | $160.00 | $100.79 | $160.00 | $100.00 | $640.00 |
| 0068 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 3,095 | $1.37 | $1.81 | $1.26 | $1.81 | $1.25 | $1.70 |
| 0069 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 24 | $11.00 | $16.39 | $10.08 | $16.39 | $10.00 | $12.80 |
| 0070 | Construction sign, type A (801-06640) | EACH | 16 | $220.00 | $261.00 | $201.58 | $261.00 | $200.00 | $315.00 |
| 0071 | Construction sign, type B (801-06645) | EACH | 6 | $110.00 | $112.00 | $100.79 | $112.00 | $100.00 | $158.50 |
| 0072 | Maintaining traffic (801-06775) | LS | 1 | $100,000 | $28,925 | $9,832.83 | $26,539 | $20,790 | $50,346 |
| 0073 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $7,700.00 | $7,700.00 | $7,055.37 | $7,000.00 | $7,000.00 | $7,700.00 |
| 0074 | Barricade, type III-A (801-07118) | LFT | 24 | $16.50 | $18.00 | $15.12 | $18.00 | $15.00 | $25.40 |
| 0075 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 900 | $55.00 | $50.00 | $49.38 | $63.50 | $51.00 | $51.80 |
| 0076 | Portable signal (801-12081) | LS | 1 | $27,500 | $25,000 | $25,198 | $75,000 | $25,000 | $16,500 |
| 0077 | Driveway assistance device (801-12482) | EACH | 2 | $6,490.00 | $5,900.00 | $5,946.67 | $15,000 | $5,900.00 | $5,000.00 |
| 0078 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $440.00 | $373.00 | $403.17 | $373.00 | $400.00 | $910.00 |
| 0079 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 10 | $33.00 | $86.00 | $30.24 | $56.00 | $30.00 | $33.00 |
| 0080 | Sign, sheet, relocate (802-07060) | EACH | 1 | $330.00 | $670.00 | $302.37 | $370.00 | $300.00 | $330.00 |
| 0081 | Signal cable, loop detector lead-in, copper, 2C/14 gauge (805-02389) | LFT | 72 | $3.30 | $3.00 | $3.02 | $1.00 | $3.00 | $3.30 |
| 0082 | Conduit, PVC, 2 in. (805-06595) | LFT | 72 | $44.00 | $40.00 | $40.32 | $26.50 | $40.00 | $44.00 |
| 0083 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 592 | $2.20 | $2.00 | $2.02 | $1.00 | $2.00 | $2.20 |
| 0084 | Signal detector housing (805-78785) | EACH | 2 | $3,300.00 | $3,000.00 | $3,023.73 | $1,650.00 | $3,000.00 | $3,300.00 |
| 0085 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 148 | $14.00 | $13.00 | $13.10 | $10.00 | $13.00 | $14.30 |
| 0086 | Line, remove (808-06716) | LFT | 2,385 | $0.82 | $0.76 | $0.76 | $0.76 | $0.75 | $1.20 |
| 0087 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,150 | $4.40 | $4.00 | $6.32 | $4.00 | $4.00 | $4.40 |
| 0088 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,150 | $4.40 | $4.00 | $6.32 | $4.00 | $4.00 | $4.40 |
| 0089 | Grooving for pavement markings (808-12032) | LFT | 1,865 | $2.20 | $3.47 | $2.02 | $3.47 | $2.00 | $5.85 |
| 0090 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 13 | $30.00 | $25.32 | $25.24 | $15.00 | $40.00 | $35.70 |
| 0091 | Snowplowable raised pavement marker (808-75998) | EACH | 13 | $110.00 | $100.00 | $100.79 | $100.00 | $100.00 | $110.00 |
| 0092 | Atr station, 2 lane (809-05906) | EACH | 1 | $44,000 | $40,000 | $40,316 | $30,000 | $40,000 | $44,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 6, 2025. Compiled by Mirage Metrics.