INDOT contract B-43770-A bid tabulation

REPLACE SUPERSTRUCTURE. Let by Indiana DOT on August 6, 2025, Ripley, Seymour. 6 bids received; low bid $1,607,029 by Duncan Robertson Inc.

Owner
Indiana DOT
Letting
06 AUG 2025
Pay items
92
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duncan Robertson Inc$1,607,029Low
2Dave Omara Contractor Inc$1,783,000+11%
3Sunesis Construction Company$1,857,427+16%
4Ragle, Inc.$1,888,041+17%
5Paul H Rohe Company Inc$1,928,024+20%
6Milestone Contractors LP$2,224,977+38%
INDOT contract B-43770-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duncan Robertson Inc2. Dave Omara Contractor Inc3. Sunesis Construction Company4. Ragle, Inc.5. Paul H Rohe Company Inc6. Milestone Contractors LP
0001Construction engineering (105-06845)LS1$20,000$11,700$11,700$18,000$11,700$21,600
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$80,000$89,939$185,282$95,425$68,375$80,000
0010Clearing right-of-way (201-52370)LS1$16,000$18,000$1,667.66$19,000$17,190$25,000
0011Pavement removal (202-02240)SYS121$55.00$130.00$16.22$70.00$80.00$70.40
0012Regulated asbestos containing materials, remove (202-03135)SFT22$50.00$659.00$503.96$100.00$300.00$550.00
0013Present structure, remove portions, structure no. 1 (202-51328)LS1$200,000$164,000$171,512$196,000$369,260$310,000
0014Detector housing, remove (202-90277)EACH4$330.00$300.00$302.37$125.00$300.00$300.00
0015Excavation, common (203-02000)CYS680$60.00$95.00$72.03$45.00$47.95$95.60
0016Pump around (205-11626)EACH1$12,500$70,000$25,453$30,000$21,330$70,900
0017Stormwater management budget (205-12108)DOL11,000$1.00$1.00$1.00$1.00$1.00$1.00
0018Stormwater management implementation (205-12616)LS1$15,000$3,500.00$22,960$15,000$2,500.00$14,300
0019Subgrade treatment, type IC (207-09935)SYS1,708$45.00$45.00$56.19$45.00$40.37$44.10
0020Structure backfill, type 4 (211-09267)CYS16$250.00$130.00$376.28$435.00$475.00$260.00
0021Geotextile for pavement, type 1A (214-12236)SYS241$3.00$2.20$6.58$5.35$5.00$3.00
0022Geotextile for pavement, type 2B (214-12239)SYS1,799$5.00$3.50$4.84$4.50$4.65$4.45
0023Compacted aggregate, no. 53 (301-12234)CYS87$85.00$60.00$187.39$145.00$120.00$164.25
0024Subbase for PCCP (302-06464)CYS61$110.00$150.00$151.82$140.00$140.00$290.00
0025Compacted aggregate, no. 73 (303-07449)TON44$110.00$45.00$101.26$50.00$80.00$59.20
0026Compacted aggregate, no. 53, temporary for driveways (303-08210)TON44$110.00$340.00$98.92$50.00$80.00$59.20
0027Milling, asphalt, 1 1/2 in. (306-08034)SYS455$20.00$25.00$11.98$12.00$13.00$16.90
0028QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON189$187.00$130.00$171.34$130.00$175.00$209.00
0029QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON223$163.00$130.00$149.17$130.00$150.00$177.75
0030QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON559$132.00$130.00$120.95$130.00$115.00$137.75
0031Joint adhesive, surface (401-10258)LFT1,398$0.82$0.50$0.76$0.50$0.80$0.60
0032Joint adhesive, intermediate (401-10259)LFT1,023$1.05$0.50$0.96$0.50$1.00$1.15
0033Asphalt for tack coat (406-05521)SYS5,219$0.50$0.50$0.45$0.50$0.40$0.30
0034Fog seal (412-09355)SYS1,989$0.60$0.10$0.55$0.10$0.45$1.15
0035Guardrail transition, type TGB , modified (601-01522)EACH1$3,520.00$2,675.00$3,225.31$3,200.00$3,200.00$3,500.00
0036Guardrail, remove (601-02241)LFT551$1.10$7.00$1.01$6.25$1.00$1.10
0037Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT63$22.00$25.00$20.16$20.00$20.00$22.00
0038Guardrail transition, MGS without curb (601-12292)EACH3$2,970.00$3,900.00$2,721.36$2,700.00$2,700.00$3,000.00
0039Guardrail end treatment, type OS (601-94689)EACH3$3,190.00$3,125.00$2,922.94$2,900.00$2,900.00$3,200.00
0040Reinforced concrete bridge approach, 12 in. (609-06259)SYS241.70$315.00$250.00$370.63$260.00$230.00$425.00
0041HMA for approaches, type B (610-07487)TON10$247.00$130.00$226.78$130.00$250.00$580.00
0042Mailbox assembly, reset, single (611-08232)EACH1$310.00$280.00$157.06$280.00$280.00$275.00
0043Monument, type B (615-06505)EACH4$1,300.00$1,180.00$1,209.49$1,200.00$1,200.00$1,300.00
0044Benchmark post (615-06530)EACH1$660.00$600.00$1,905.47$1,200.00$600.00$830.00
0045Riprap, class 1 (616-05688)TON318$75.00$115.00$134.60$135.00$110.00$160.50
0046Riprap, revetment (616-06405)TON127$45.00$75.00$189.92$75.00$130.00$135.25
0047Geotextile for riprap, type 1A (616-12246)SYS769$4.00$2.00$3.36$4.00$2.70$1.25
0048Mobilization and demobilization for seeding (621-01004)EACH1$1,650.00$1,000.00$1,511.87$1,500.00$1,000.00$1,700.00
0049Erosion control blanket (621-02770)SYS1,056$1.92$3.25$1.76$1.75$3.25$1.95
0050Mulched seeding, type R (621-06559)SYS1,056$1.65$3.25$3.30$1.50$3.25$1.65
0051Sodding (621-06574)SYS29$115.00$135.00$110.69$125.00$135.00$115.50
0052Seed mixture, floodplain (621-12612)LBS3$660.00$1,000.00$991.36$600.00$1,000.00$660.00
0053Sign, 'DO not mow or spray' (622-52436)EACH4$93.00$110.00$85.67$85.00$110.00$93.60
0054Computer system equipment (628-11976)EACH2$1,000.00$900.00$1,878.52$750.00$950.00$6,500.00
0055Field office, type D (628-12683)MOS12$2,500.00$2,100.00$1,000.00$2,350.00$3,550.00$4,600.00
0056Temporary shoring (702-04325)LS1$20,000$24,000$35,052$25,000$32,360$37,300
0057Reinforcing bars, epoxy coated (703-06029)LBS53,410$1.50$1.45$1.87$1.85$1.60$1.85
0058Threaded tie bar assembly, epoxy coated (703-97936)EACH312$60.00$33.00$47.84$52.50$38.00$50.50
0059Concrete, C, superstructure (704-51002)CYS168.30$1,650.00$2,825.00$2,519.43$3,150.00$3,040.00$3,200.00
0060Concrete bridge railing transition, type TPF-1 (706-06351)EACH4$3,360.00$7,500.00$7,689.95$5,600.00$7,500.00$8,300.00
0061Railing, steel type PF-1 (706-11404)LFT125$120.00$78.00$117.04$109.00$109.00$120.00
0062Railing, concrete type PF-1 (706-11602)CYS6.60$1,850.00$3,951.00$4,140.83$3,500.00$3,951.00$4,900.00
0063Surface seal (709-51821)LS1$1,750.00$2,989.39$16.34$1.00$2,490.00$2,700.00
0064Pipe, type 3, circular, diameter 24 in. (715-05173)LFT14$200.00$80.00$331.39$160.00$320.00$220.00
0065Inlet, type E7 (720-45030)EACH1$2,500.00$2,700.00$5,098.08$6,200.00$6,150.00$4,100.00
0066Longitudinal grooving (722-12732)SYS538$12.00$3.50$13.79$10.00$5.00$3.85
0067Construction sign, type D (801-03291)EACH2$110.00$160.00$100.79$160.00$100.00$640.00
0068Temporary pavement marking, removable, 4 in. (801-06207)LFT3,095$1.37$1.81$1.26$1.81$1.25$1.70
0069Temporary transverse pavement marking, removable, 24 in. (801-06218)LFT24$11.00$16.39$10.08$16.39$10.00$12.80
0070Construction sign, type A (801-06640)EACH16$220.00$261.00$201.58$261.00$200.00$315.00
0071Construction sign, type B (801-06645)EACH6$110.00$112.00$100.79$112.00$100.00$158.50
0072Maintaining traffic (801-06775)LS1$100,000$28,925$9,832.83$26,539$20,790$50,346
0073Energy absorbing terminal, CZ, TL-2 (801-07023)EACH2$7,700.00$7,700.00$7,055.37$7,000.00$7,000.00$7,700.00
0074Barricade, type III-A (801-07118)LFT24$16.50$18.00$15.12$18.00$15.00$25.40
0075Temporary traffic barrier, anchored, type 2 (801-08508)LFT900$55.00$50.00$49.38$63.50$51.00$51.80
0076Portable signal (801-12081)LS1$27,500$25,000$25,198$75,000$25,000$16,500
0077Driveway assistance device (801-12482)EACH2$6,490.00$5,900.00$5,946.67$15,000$5,900.00$5,000.00
0078Temporary worksite speed limit sign assembly, continuous (801-12883)EACH4$440.00$373.00$403.17$373.00$400.00$910.00
0079Sign post, square, type 1, reinforced anchor base (802-05701)LFT10$33.00$86.00$30.24$56.00$30.00$33.00
0080Sign, sheet, relocate (802-07060)EACH1$330.00$670.00$302.37$370.00$300.00$330.00
0081Signal cable, loop detector lead-in, copper, 2C/14 gauge (805-02389)LFT72$3.30$3.00$3.02$1.00$3.00$3.30
0082Conduit, PVC, 2 in. (805-06595)LFT72$44.00$40.00$40.32$26.50$40.00$44.00
0083Signal cable, roadway loop, copper, 1C/14 gauge (805-78470)LFT592$2.20$2.00$2.02$1.00$2.00$2.20
0084Signal detector housing (805-78785)EACH2$3,300.00$3,000.00$3,023.73$1,650.00$3,000.00$3,300.00
0085Saw cut for roadway loop detector and sealant (805-78795)LFT148$14.00$13.00$13.10$10.00$13.00$14.30
0086Line, remove (808-06716)LFT2,385$0.82$0.76$0.76$0.76$0.75$1.20
0087Line, multi-component, solid, white, 6 in. (808-10049)LFT1,150$4.40$4.00$6.32$4.00$4.00$4.40
0088Line, multi-component, solid, yellow, 6 in. (808-10057)LFT1,150$4.40$4.00$6.32$4.00$4.00$4.40
0089Grooving for pavement markings (808-12032)LFT1,865$2.20$3.47$2.02$3.47$2.00$5.85
0090Snowplowable raised pavement marker, remove (808-75996)EACH13$30.00$25.32$25.24$15.00$40.00$35.70
0091Snowplowable raised pavement marker (808-75998)EACH13$110.00$100.00$100.79$100.00$100.00$110.00
0092Atr station, 2 lane (809-05906)EACH1$44,000$40,000$40,316$30,000$40,000$44,000
INDOT contract B-43770-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of August 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy