INDOT contract B-44276-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Hancock, Greenfield. 10 bids received; low bid $1,496,461 by His Constructors Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 88
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | His Constructors Inc | $1,496,461 | Low |
| 2 | Pontem Contractors Inc | $1,504,366 | +1.0% |
| 3 | Duncan Robertson Inc | $1,515,382 | +1.0% |
| 4 | Beaty Construction Inc | $1,583,000 | +6.0% |
| 5 | Icc Group Inc | $1,731,000 | +16% |
| 6 | E & B Paving LLC | $1,770,000 | +18% |
| 7 | Dave Omara Contractor Inc | $1,896,230 | +27% |
| 8 | William Charles Construction Company | $1,900,000 | +27% |
| 9 | Rieth-Riley Construction Co., Inc. | $1,965,626 | +31% |
| 10 | Milestone Contractors LP | $2,168,000 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. His Constructors Inc | 2. Pontem Contractors Inc | 3. Duncan Robertson Inc | 4. Beaty Construction Inc | 5. Icc Group Inc | 6. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $9,000.00 | $15,408 | $12,000 | $50,000 | $15,300 | $24,730 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $80,000 | $75,000 | $75,000 | $79,000 | $86,650 | $88,500 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $20,794 | $30,000 | $30,000 | $31,000 | $34,660 | $35,400 |
| 0011 | Present structure, remove portions, structure no. 30-00067 (202-51328) | LS | 1 | $40,000 | $115,074 | $60,000 | $40,000 | $124,473 | $115,000 |
| 0012 | Excavation, common (203-02000) | CYS | 110 | $143.00 | $206.22 | $50.00 | $40.00 | $160.00 | $390.00 |
| 0013 | Borrow (203-02070) | CYS | 980 | $33.00 | $32.47 | $15.00 | $60.00 | $90.00 | $1.00 |
| 0014 | Excavation, waterway (203-51223) | CYS | 480 | $28.00 | $51.43 | $20.00 | $40.00 | $45.00 | $45.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 15,900 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $9,500.00 | $5,093.85 | $17,500 | $15,600 | $10,130 | $20,000 |
| 0017 | Excavation, wet (206-51220) | CYS | 145 | $36.00 | $64.80 | $65.00 | $25.00 | $45.00 | $80.00 |
| 0018 | Excavation, dry (206-51225) | CYS | 35 | $40.00 | $58.47 | $15.00 | $38.00 | $60.00 | $45.00 |
| 0019 | Cofferdam (206-51235) | LS | 1 | $28,000 | $37,979 | $15,000 | $6,800.00 | $8,000.00 | $65,000 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 1,210 | $35.00 | $35.82 | $33.00 | $37.00 | $45.00 | $44.54 |
| 0021 | Aggregate for end bent backfill (211-06467) | CYS | 16 | $158.00 | $106.56 | $145.00 | $150.00 | $210.00 | $250.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 45 | $94.00 | $74.86 | $160.00 | $74.00 | $100.00 | $96.50 |
| 0023 | Geotextile for pavement, type 2A (214-12238) | SYS | 246 | $6.00 | $5.38 | $4.50 | $4.00 | $12.00 | $6.50 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,384 | $4.00 | $1.42 | $5.50 | $5.00 | $7.00 | $5.35 |
| 0025 | Compacted aggregate, no. 8 (301-12233) | CYS | 82 | $98.00 | $89.33 | $150.00 | $141.00 | $130.00 | $119.37 |
| 0026 | Subbase for PCCP (302-06464) | CYS | 44 | $74.00 | $195.65 | $175.00 | $178.00 | $105.00 | $124.26 |
| 0027 | Compacted aggregate, no. 53 (303-01180) | TON | 164 | $48.00 | $56.90 | $75.00 | $59.00 | $52.00 | $55.00 |
| 0028 | Milling, transition (306-08043) | SYS | 188 | $20.00 | $22.06 | $50.00 | $12.00 | $14.00 | $30.00 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 103 | $171.00 | $174.41 | $236.00 | $215.00 | $215.00 | $215.00 |
| 0030 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 144 | $143.00 | $145.52 | $187.00 | $170.00 | $170.00 | $170.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 342 | $126.00 | $128.40 | $140.00 | $128.00 | $128.00 | $128.00 |
| 0032 | Joint adhesive (401-11526) | LFT | 2,200 | $0.74 | $0.75 | $0.22 | $0.20 | $0.20 | $0.20 |
| 0033 | Asphalt for tack coat (406-05521) | SYS | 2,214 | $1.58 | $1.61 | $0.02 | $0.01 | $0.01 | $0.01 |
| 0034 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $11,000 | $11,235 | $500.00 | $455.00 | $455.00 | $455.00 |
| 0035 | Guardrail, remove (601-02241) | LFT | 202 | $1.05 | $1.07 | $5.00 | $10.00 | $1.00 | $1.00 |
| 0036 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 194 | $21.00 | $21.40 | $24.00 | $22.00 | $20.00 | $20.00 |
| 0037 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,382.00 | $3,436.84 | $3,850.00 | $3,500.00 | $3,212.00 | $3,212.00 |
| 0038 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,054.00 | $3,103.00 | $2,530.00 | $2,300.00 | $2,900.00 | $2,900.00 |
| 0039 | Barrier delineator (602-06729) | EACH | 10 | $53.00 | $134.19 | $30.00 | $18.00 | $25.00 | $30.00 |
| 0040 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 174 | $265.00 | $193.71 | $225.00 | $146.00 | $225.00 | $275.00 |
| 0041 | Right-of-way marker (615-06490) | EACH | 9 | $157.00 | $160.50 | $244.00 | $222.00 | $150.00 | $150.00 |
| 0042 | Monument, type B (615-06505) | EACH | 2 | $1,027.00 | $1,044.32 | $1,705.00 | $1,550.00 | $976.00 | $976.00 |
| 0043 | Riprap, class 1 (616-05688) | TON | 685 | $100.00 | $99.08 | $75.00 | $103.00 | $150.00 | $124.88 |
| 0044 | Riprap, revetment (616-06405) | TON | 92 | $73.00 | $48.59 | $75.00 | $83.00 | $90.00 | $105.80 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 777 | $3.00 | $3.75 | $3.50 | $5.00 | $8.00 | $4.44 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $265.00 | $267.50 | $275.00 | $250.00 | $250.00 | $250.00 |
| 0047 | Erosion control blanket (621-02770) | SYS | 1,107 | $1.84 | $1.87 | $1.90 | $1.75 | $1.75 | $1.75 |
| 0048 | Water (621-06567) | KGAL | 5 | $1.05 | $1.07 | $1.10 | $1.00 | $0.10 | $1.00 |
| 0049 | Sodding (621-06574) | SYS | 110 | $20.00 | $37.56 | $20.00 | $18.50 | $18.50 | $18.50 |
| 0050 | Seed mixture, floodplain (621-12612) | LBS | 21 | $53.00 | $53.50 | $55.00 | $50.00 | $50.00 | $50.00 |
| 0051 | Sign, 'DO not spray' (621-52448) | EACH | 8 | $105.00 | $107.00 | $110.00 | $100.00 | $100.00 | $100.00 |
| 0052 | Field office, type A (628-09401) | MOS | 12 | $1,400.00 | $2,575.09 | $2,500.00 | $3,250.00 | $3,000.00 | $3,000.00 |
| 0053 | Test pile, indicator, production (701-09558) | LFT | 290 | $145.00 | $76.68 | $70.00 | $50.00 | $120.00 | $95.00 |
| 0054 | Test pile, indicator, restrike (701-09560) | EACH | 4 | $598.00 | $951.18 | $1,000.00 | $1,500.00 | $1,000.00 | $3,000.00 |
| 0055 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 10 | $141.00 | $135.23 | $275.00 | $150.00 | $200.00 | $200.00 |
| 0056 | Pile shoe, HP 14 X 73 (701-09770) | EACH | 14 | $153.00 | $146.05 | $300.00 | $150.00 | $250.00 | $250.00 |
| 0057 | Reinforced concrete encasement for H piles (701-12709) | LFT | 145 | $79.00 | $265.64 | $480.00 | $220.00 | $450.00 | $250.00 |
| 0058 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 400 | $113.00 | $70.84 | $70.00 | $125.00 | $70.00 | $80.00 |
| 0059 | Pile, steel H, HP, 14 X 73 (701-93575) | LFT | 900 | $123.00 | $82.19 | $70.00 | $118.00 | $80.00 | $85.00 |
| 0060 | Concrete, A, substructure (702-51005) | CYS | 20.80 | $2,448.00 | $1,050.79 | $1,650.00 | $3,200.00 | $1,800.00 | $1,950.00 |
| 0061 | Concrete, C, substructure (702-92857) | CYS | 32 | $1,691.00 | $1,000.26 | $1,300.00 | $1,150.00 | $1,000.00 | $1,250.00 |
| 0062 | Reinforcing bars (703-06028) | LBS | 2,412 | $1.39 | $1.34 | $1.50 | $1.41 | $1.70 | $1.55 |
| 0063 | Reinforcing bars, epoxy coated (703-06029) | LBS | 47,530 | $1.31 | $1.45 | $1.65 | $1.52 | $2.00 | $1.65 |
| 0064 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 32 | $40.00 | $37.14 | $65.00 | $30.00 | $60.00 | $20.00 |
| 0065 | Concrete, C, superstructure (704-51002) | CYS | 100.80 | $1,641.00 | $1,174.04 | $1,350.00 | $1,700.00 | $1,100.00 | $1,340.00 |
| 0066 | Railing, concrete type FC (706-11600) | CYS | 20.10 | $916.00 | $930.90 | $1,050.00 | $855.00 | $1,100.00 | $950.00 |
| 0067 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,632.00 | $2,675.00 | $3,000.00 | $1,800.00 | $1,500.00 | $4,000.00 |
| 0068 | Structural member, concrete, box beam, 12 in. X 48 in. (707-09029) | LFT | 515 | $411.00 | $462.63 | $500.00 | $400.00 | $575.00 | $428.00 |
| 0069 | Surface seal , structure no. 30-00067 (709-51821) | LS | 1 | $3,622.00 | $5,350.00 | $3,500.00 | $1.00 | $3,440.00 | $0.01 |
| 0070 | Anchor plate (711-02707) | EACH | 20 | $62.00 | $199.53 | $850.00 | $1,200.00 | $400.00 | $450.00 |
| 0071 | Pipe, type 3, circular, diameter 30 in. (715-05175) | LFT | 101 | $110.00 | $66.44 | $100.00 | $135.00 | $160.00 | $125.55 |
| 0072 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 108 | $12.00 | $14.05 | $15.00 | $18.00 | $16.00 | $15.00 |
| 0073 | Pipe end section, diameter 30 in. (715-46030) | EACH | 2 | $2,276.00 | $1,314.81 | $1,100.00 | $1,500.00 | $2,400.00 | $1,735.00 |
| 0074 | Geotextile for underdrains, type 2A (718-12307) | SYS | 59 | $10.00 | $2.42 | $3.00 | $8.00 | $8.00 | $5.00 |
| 0075 | Automatic drainage gate, diameter 30 in. (721-43030) | EACH | 1 | $15,000 | $15,233 | $3,000.00 | $16,500 | $1,600.00 | $20,000 |
| 0076 | Longitudinal grooving (722-12732) | SYS | 484 | $5.44 | $17.51 | $10.00 | $7.00 | $5.17 | $10.00 |
| 0077 | Bearing assembly, elastomeric (726-92406) | EACH | 40 | $546.00 | $204.11 | $500.00 | $300.00 | $270.03 | $2,000.00 |
| 0078 | Road closure sign assembly (801-04308) | EACH | 4 | $337.00 | $342.40 | $352.00 | $320.00 | $320.00 | $320.00 |
| 0079 | Detour route marker assembly (801-06625) | EACH | 21 | $142.00 | $144.45 | $148.00 | $135.00 | $135.00 | $135.00 |
| 0080 | Construction sign, type A (801-06640) | EACH | 10 | $200.00 | $203.30 | $209.00 | $190.00 | $190.00 | $190.00 |
| 0081 | Maintaining traffic (801-06775) | LS | 1 | $1,066.00 | $7,805.61 | $22,500 | $8,400.74 | $1,013.00 | $27,000 |
| 0082 | Barricade, type III-A (801-07118) | LFT | 48 | $17.00 | $17.12 | $17.50 | $16.00 | $16.00 | $16.00 |
| 0083 | Barricade, type III-B (801-07119) | LFT | 48 | $17.00 | $17.12 | $17.50 | $16.00 | $16.00 | $16.00 |
| 0084 | Sign, ground mounted, reset (802-91122) | EACH | 4 | $106.00 | $108.07 | $336.00 | $306.00 | $101.00 | $101.00 |
| 0085 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,130 | $1.05 | $1.07 | $1.10 | $1.00 | $1.00 | $1.00 |
| 0086 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 410 | $1.05 | $1.07 | $1.10 | $1.00 | $1.00 | $1.00 |
| 0087 | Grooving for pavement markings (808-12032) | LFT | 1,823 | $0.58 | $0.59 | $0.60 | $0.55 | $0.55 | $0.55 |
| 0088 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 283 | $1.47 | $1.50 | $1.50 | $1.40 | $1.40 | $1.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.