INDOT contract R-43621-A bid tabulation
ADDED TRAVEL LANES. Let by Indiana DOT on December 10, 2025, Hancock, Greenfield. 8 bids received; low bid $6,628,214 by His Constructors Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 152
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | His Constructors Inc | $6,628,214 | Low |
| 2 | E & B Paving LLC | $6,887,899 | +4.0% |
| 3 | William Charles Construction Company | $7,133,885 | +8.0% |
| 4 | Milestone Contractors LP | $7,245,000 | +9.0% |
| 5 | Morphey Construction Inc. | $7,395,000 | +12% |
| 6 | Calumet Civil Contractors Inc | $7,467,000 | +13% |
| 7 | Rieth-Riley Construction Co., Inc. | $7,633,021 | +15% |
| 8 | Dave Omara Contractor Inc | $8,844,108 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. His Constructors Inc | 2. E & B Paving LLC | 3. William Charles Construction Company | 4. Milestone Contractors LP | 5. Morphey Construction Inc. | 6. Calumet Civil Contractors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $68,000 | $44,400 | $60,000 | $77,000 | $31,000 | $40,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $210,000 | $333,000 | $356,000 | $362,250 | $369,750 | $240,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $49,203 | $135,000 | $210,500 | $217,350 | $155,000 | $69,599 |
| 0012 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $20,000 | $55,079 | $17,350 | $45,000 | $10,000 | $50,000 |
| 0013 | Excavation, common (203-02000) | CYS | 29,450 | $24.00 | $29.00 | $15.00 | $28.00 | $39.00 | $30.00 |
| 0014 | Pump around (205-11626) | EACH | 1 | $20,000 | $4,500.00 | $16,845 | $30,000 | $10,000 | $17,500 |
| 0015 | Stormwater management budget (205-12108) | DOL | 103,780 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $38,000 | $185,700 | $55,000 | $15,000 | $500.00 | $70,000 |
| 0017 | SWQCP preparation (205-12618) | LS | 1 | $2,700.00 | $7,500.00 | $5,060.00 | $6,000.00 | $3,100.00 | $3,500.00 |
| 0018 | Excavation, foundation, unclassified (206-51230) | CYS | 336 | $38.00 | $75.00 | $71.20 | $40.00 | $44.00 | $55.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 6,989 | $27.00 | $25.00 | $25.50 | $30.00 | $22.00 | $22.00 |
| 0020 | Subgrade treatment, type ibc (207-12635) | SYS | 32,698 | $10.00 | $11.00 | $9.80 | $9.40 | $12.00 | $11.50 |
| 0021 | Structure backfill, type 1 (211-09264) | CYS | 176 | $82.00 | $80.00 | $52.20 | $56.00 | $67.00 | $56.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 484 | $83.00 | $80.00 | $63.10 | $69.00 | $67.00 | $70.00 |
| 0023 | Structure backfill, type 3 (211-09266) | CYS | 166 | $86.00 | $75.00 | $206.00 | $69.00 | $67.00 | $75.00 |
| 0024 | Geogrid, type IB (214-11796) | SYS | 1,952 | $3.10 | $3.00 | $1.20 | $3.50 | $2.00 | $3.20 |
| 0025 | Geotextile for pavement, type 2B (214-12239) | SYS | 34,059 | $3.50 | $3.00 | $2.35 | $2.25 | $3.00 | $3.20 |
| 0026 | Chemical modification, soils, cement (215-12637) | SYS | 24,524 | $10.00 | $9.30 | $9.70 | $9.30 | $9.30 | $10.50 |
| 0027 | Compacted aggregate, no. 8 (301-12233) | CYS | 135 | $86.00 | $90.00 | $89.60 | $120.00 | $120.00 | $90.00 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 5,622 | $67.00 | $66.00 | $104.50 | $65.00 | $85.00 | $71.00 |
| 0029 | Dense graded subbase (302-07455) | CYS | 47 | $104.00 | $110.00 | $157.50 | $95.00 | $160.00 | $140.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 3,372 | $44.00 | $42.00 | $63.80 | $40.00 | $50.00 | $48.00 |
| 0031 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 200 | $58.00 | $42.00 | $76.30 | $69.00 | $50.00 | $70.00 |
| 0032 | QC/QA-HMA, 3, 58E, intermediate, 19.0 MM (401-000044) | TON | 3,816 | $90.00 | $85.00 | $85.60 | $102.00 | $85.00 | $115.00 |
| 0033 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 6,106 | $78.00 | $73.00 | $73.50 | $92.00 | $73.00 | $95.00 |
| 0034 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 4,622 | $77.00 | $72.50 | $73.00 | $71.00 | $72.50 | $95.00 |
| 0035 | HMA for temporary pavement, type B (402-10084) | TON | 1,219 | $158.00 | $96.00 | $96.70 | $96.00 | $170.00 | $175.00 |
| 0036 | Asphalt for tack coat (406-05520) | TON | 24 | $0.01 | $0.01 | $0.01 | $564.00 | $0.01 | $200.00 |
| 0037 | QC/QA-HMA, 4, 58E, surface, 9.5 MM - SMA (410-000073) | TON | 3,054 | $132.00 | $124.00 | $125.00 | $146.00 | $124.00 | $160.00 |
| 0038 | Void reducing asphalt membrane for SMA (410-12466) | LFT | 15,262 | $1.55 | $1.50 | $1.50 | $6.35 | $1.50 | $4.75 |
| 0039 | PCCP, 11 in. (502-06328) | SYS | 489 | $98.00 | $92.00 | $159.50 | $85.00 | $110.00 | $120.00 |
| 0040 | D-1 contraction joint (503-05240) | LFT | 380 | $23.00 | $22.00 | $21.30 | $32.00 | $22.00 | $19.00 |
| 0041 | Guardrail terminal system, W-beam, curved, type 6 (601-01839) | EACH | 1 | $2,410.00 | $2,260.00 | $2,269.00 | $2,260.00 | $2,260.00 | $2,260.00 |
| 0042 | Guardrail, remove (601-02241) | LFT | 410 | $4.25 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0043 | Hand dig guardrail post holes (601-09238) | EACH | 1 | $60.00 | $55.00 | $55.20 | $55.00 | $500.00 | $55.00 |
| 0044 | Guardrail, W-beam, structure top-mounted posts (601-12422) | EACH | 5 | $530.00 | $500.00 | $502.00 | $500.00 | $500.00 | $500.00 |
| 0045 | Guardrail end treatment, type OS , 27-3/4 inch (601-94689) | EACH | 3 | $2,345.00 | $2,200.00 | $2,209.00 | $2,200.00 | $2,200.00 | $2,200.00 |
| 0046 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 250 | $23.00 | $22.00 | $22.10 | $22.00 | $22.00 | $22.00 |
| 0047 | Curb, integral concrete (605-06090) | LFT | 157 | $47.00 | $44.00 | $98.20 | $65.00 | $50.00 | $34.00 |
| 0048 | Curb, concrete (605-06120) | LFT | 727 | $75.00 | $70.00 | $52.60 | $60.00 | $84.00 | $36.00 |
| 0049 | Curb and gutter, concrete (605-06140) | LFT | 2,776 | $33.00 | $31.00 | $46.90 | $30.00 | $34.00 | $33.00 |
| 0050 | Curb and gutter, concrete, type B (605-06145) | LFT | 283 | $38.00 | $36.00 | $55.10 | $45.00 | $42.00 | $43.00 |
| 0051 | Center curb, concrete, type D (605-06255) | SYS | 803 | $138.00 | $130.00 | $157.50 | $175.00 | $142.00 | $158.00 |
| 0052 | Gutter, concrete, type A (607-06175) | LFT | 92 | $114.00 | $107.00 | $248.50 | $215.00 | $126.00 | $55.00 |
| 0053 | HMA for approaches, type B (610-07487) | TON | 1,202 | $143.00 | $134.00 | $135.00 | $130.00 | $173.00 | $125.00 |
| 0054 | PCCP for approaches, 6 in. (610-08446) | SYS | 287 | $93.00 | $87.00 | $114.50 | $110.00 | $102.00 | $100.00 |
| 0055 | Mailbox assembly, single (611-06497) | EACH | 9 | $265.00 | $250.00 | $251.00 | $250.00 | $250.00 | $250.00 |
| 0056 | Mailbox assembly, double (611-06498) | EACH | 3 | $375.00 | $350.00 | $351.50 | $350.00 | $350.00 | $350.00 |
| 0057 | Right-of-way marker (615-06490) | EACH | 35 | $185.00 | $200.00 | $175.50 | $175.00 | $175.00 | $175.00 |
| 0058 | Monument, type B (615-06505) | EACH | 5 | $1,280.00 | $975.00 | $1,205.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 0059 | Monument, type C (615-06510) | EACH | 2 | $1,010.00 | $375.00 | $954.00 | $950.00 | $950.00 | $950.00 |
| 0060 | Monument, type D (615-06515) | EACH | 10 | $138.00 | $175.00 | $130.50 | $130.00 | $130.00 | $130.00 |
| 0061 | Monument, section corner (615-06527) | EACH | 2 | $800.00 | $575.00 | $753.00 | $750.00 | $750.00 | $750.00 |
| 0062 | Riprap, class 1 (616-05688) | TON | 54 | $132.00 | $105.00 | $180.50 | $110.00 | $145.00 | $120.00 |
| 0063 | Riprap, revetment (616-06405) | TON | 1,169 | $75.00 | $56.00 | $118.50 | $70.00 | $125.00 | $87.00 |
| 0064 | Riprap, uniform (616-06451) | TON | 9 | $135.00 | $116.00 | $284.50 | $105.00 | $115.00 | $110.00 |
| 0065 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,787 | $3.00 | $5.00 | $1.20 | $3.00 | $2.00 | $4.00 |
| 0066 | Geotextile for riprap, type 2B (616-12249) | SYS | 368 | $5.00 | $5.00 | $2.80 | $4.50 | $3.50 | $7.00 |
| 0067 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $265.00 | $250.00 | $251.00 | $250.00 | $250.00 | $250.00 |
| 0068 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $1,625.00 | $1,525.00 | $1,531.00 | $1,525.00 | $1,525.00 | $1,525.00 |
| 0069 | Seed mixture, type U (621-06554) | LBS | 1,190 | $3.75 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0070 | Mulching material (621-06565) | TON | 12 | $540.00 | $510.00 | $512.00 | $510.00 | $510.00 | $510.00 |
| 0071 | Water (621-06567) | KGAL | 3 | $1.05 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0072 | Sodding, nursery (621-06575) | SYS | 969 | $5.30 | $5.00 | $5.00 | $5.00 | $11.00 | $8.64 |
| 0073 | Field office, type C (628-09403) | MOS | 18 | $2,625.00 | $3,450.00 | $2,500.00 | $2,750.00 | $2,400.00 | $3,200.00 |
| 0074 | Topsoil processing and distribution (629-000149) | SYS | 10,341 | $2.15 | $4.00 | $6.85 | $9.75 | $9.00 | $12.00 |
| 0075 | Topsoil amendment budget (629-000150) | DOL | 20,682 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0076 | Temporary shoring (702-04325) | LS | 1 | $100,000 | $15,000 | $30,245 | $49,719 | $90,000 | $15,000 |
| 0077 | Concrete, A, substructure (702-51005) | CYS | 24.80 | $2,035.00 | $1,500.00 | $3,888.00 | $2,250.00 | $1,650.00 | $1,200.00 |
| 0078 | Concrete, B, footings (702-51015) | CYS | 34.80 | $975.00 | $1,500.00 | $1,294.00 | $825.00 | $610.00 | $850.00 |
| 0079 | Field drilled hole in concrete (702-51863) | EACH | 198 | $20.00 | $20.00 | $55.90 | $25.00 | $20.00 | $18.00 |
| 0080 | Reinforcing bars (703-06028) | LBS | 12,748 | $1.30 | $1.75 | $2.70 | $1.65 | $3.00 | $1.75 |
| 0081 | Reinforcing bars, epoxy coated (703-06029) | LBS | 4,223 | $1.50 | $2.00 | $2.95 | $1.80 | $3.10 | $2.00 |
| 0082 | Concrete, C, superstructure (704-51002) | CYS | 7.70 | $5,250.00 | $2,500.00 | $13,585 | $3,200.00 | $2,550.00 | $4,350.00 |
| 0083 | Surface seal (709-51821) | LS | 1 | $3,500.00 | $1.00 | $5,305.00 | $2,500.00 | $3,250.00 | $1,550.00 |
| 0084 | Waterproofing membrane, type 2 (714-000086) | SFT | 972 | $7.00 | $7.50 | $4.35 | $3.25 | $2.50 | $9.50 |
| 0085 | Safety metal end section, 6:1, diameter 15 in. (715-02628) | EACH | 40 | $1,750.00 | $1,400.00 | $1,558.00 | $1,100.00 | $1,300.00 | $1,100.00 |
| 0086 | Safety metal end section, 4:1, diameter 15 in. (715-03475) | EACH | 2 | $1,690.00 | $1,400.00 | $1,476.00 | $1,100.00 | $1,300.00 | $1,100.00 |
| 0087 | Pipe, type 2, circular, diameter 15 in. (715-05032) | LFT | 378 | $50.00 | $81.00 | $92.10 | $70.00 | $70.00 | $96.00 |
| 0088 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 11,698 | $8.50 | $7.90 | $10.90 | $8.25 | $8.00 | $9.00 |
| 0089 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 249 | $38.00 | $35.00 | $37.30 | $35.00 | $28.00 | $40.00 |
| 0090 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 70 | $50.00 | $105.00 | $114.00 | $75.00 | $95.00 | $98.00 |
| 0091 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 1,092 | $50.00 | $82.00 | $99.50 | $75.00 | $85.00 | $98.00 |
| 0092 | Pipe, type 1, deformed, min. area 1.6 SFT (715-05228) | LFT | 85 | $136.00 | $150.00 | $264.00 | $165.00 | $174.00 | $225.00 |
| 0093 | Pipe, type 1, deformed, min. area 7.4 SFT (715-05239) | LFT | 212 | $265.00 | $265.00 | $466.50 | $265.00 | $335.00 | $310.00 |
| 0094 | Concrete anchor, min. area 12.9 SFT (715-07536) | EACH | 2 | $2,410.00 | $2,700.00 | $12,065 | $6,000.00 | $6,100.00 | $11,500 |
| 0095 | Safety metal end section, 4:1, min. area 2.0 SFT (715-07668) | EACH | 2 | $2,215.00 | $1,800.00 | $2,201.00 | $1,500.00 | $1,400.00 | $1,000.00 |
| 0096 | Pipe, type 1, deformed, min. area 12.9 SFT (715-08171) | LFT | 122 | $450.00 | $450.00 | $673.50 | $420.00 | $530.00 | $500.00 |
| 0097 | Video inspection for pipe (715-09064) | LFT | 1,874 | $2.00 | $2.50 | $3.25 | $1.75 | $1.75 | $1.75 |
| 0098 | Concrete anchor, min. area 7.4 SFT (715-11668) | EACH | 4 | $2,310.00 | $2,700.00 | $8,069.00 | $4,300.00 | $5,100.00 | $9,500.00 |
| 0099 | Pipe end section, diameter 15 in. (715-46005) | EACH | 4 | $1,810.00 | $1,500.00 | $1,162.00 | $1,250.00 | $1,900.00 | $1,600.00 |
| 0100 | Outlet protector, type 1 (718-06528) | EACH | 13 | $3,190.00 | $2,990.00 | $1,533.00 | $1,450.00 | $1,500.00 | $375.00 |
| 0101 | Video inspection for underdrain (718-06532) | LFT | 3,000 | $2.00 | $1.25 | $1.25 | $1.25 | $1.10 | $1.10 |
| 0102 | Geotextile for underdrains, type 1A (718-12305) | SYS | 10,620 | $3.50 | $3.45 | $1.75 | $1.65 | $1.50 | $3.45 |
| 0103 | Aggregate for underdrains (718-52610) | CYS | 1,052 | $81.00 | $75.40 | $83.70 | $110.00 | $85.00 | $75.40 |
| 0104 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $985.00 | $1,500.00 | $1,020.00 | $750.00 | $1,000.00 | $900.00 |
| 0105 | Inlet, type E7 (720-45030) | EACH | 1 | $2,270.00 | $2,900.00 | $4,945.00 | $3,000.00 | $3,200.00 | $3,500.00 |
| 0106 | Inlet, type C15 (720-98555) | EACH | 3 | $3,355.00 | $3,600.00 | $4,490.00 | $4,000.00 | $5,000.00 | $4,500.00 |
| 0107 | Road closure sign assembly (801-04308) | EACH | 12 | $240.00 | $225.00 | $226.00 | $225.00 | $225.00 | $225.00 |
| 0108 | Temporary pavement marking, 4 in. (801-06203) | LFT | 9,133 | $0.90 | $0.85 | $0.85 | $0.85 | $0.85 | $0.85 |
| 0109 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 9,280 | $1.75 | $1.65 | $1.65 | $1.65 | $1.65 | $1.65 |
| 0110 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 11 | $9.50 | $9.00 | $9.05 | $9.00 | $9.00 | $9.00 |
| 0111 | Detour route marker assembly (801-06625) | EACH | 52 | $90.00 | $85.00 | $85.40 | $85.00 | $85.00 | $85.00 |
| 0112 | Construction sign, type A (801-06640) | EACH | 46 | $105.00 | $100.00 | $100.50 | $100.00 | $100.00 | $100.00 |
| 0113 | Construction sign, type B (801-06645) | EACH | 53 | $70.00 | $65.00 | $65.30 | $65.00 | $65.00 | $65.00 |
| 0114 | Maintaining traffic (801-06775) | LS | 1 | $107,205 | $189,660 | $14,285 | $200,000 | $37,842 | $160,000 |
| 0115 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 4 | $5,000.00 | $4,400.00 | $4,418.00 | $4,400.00 | $4,400.00 | $4,400.00 |
| 0116 | Barricade, type III-A (801-07118) | LFT | 144 | $14.00 | $13.00 | $13.10 | $13.00 | $13.00 | $13.00 |
| 0117 | Barricade, type III-B (801-07119) | LFT | 180 | $14.00 | $13.00 | $13.10 | $13.00 | $13.00 | $13.00 |
| 0118 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 510 | $82.00 | $35.00 | $82.10 | $53.00 | $42.50 | $41.00 |
| 0119 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 304 | $20.00 | $30.00 | $18.10 | $30.00 | $18.00 | $30.00 |
| 0120 | Sign post, square, type 2, unreinforced anchor base (802-05705) | LFT | 191 | $17.00 | $29.00 | $16.10 | $29.00 | $16.00 | $29.00 |
| 0121 | Sign, sheet, relocate (802-07060) | EACH | 4 | $320.00 | $200.00 | $301.00 | $200.00 | $300.00 | $200.00 |
| 0122 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 160 | $29.00 | $31.00 | $27.10 | $31.00 | $27.00 | $31.00 |
| 0123 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 39 | $36.00 | $33.00 | $34.10 | $33.00 | $34.00 | $33.00 |
| 0124 | Delineator post (804-06770) | EACH | 13 | $31.00 | $100.00 | $29.10 | $29.00 | $29.00 | $29.00 |
| 0125 | Handhole, lighting (807-02191) | EACH | 4 | $1,500.00 | $1,400.00 | $2,510.00 | $1,400.00 | $2,500.00 | $1,400.00 |
| 0126 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 217 | $37.00 | $35.00 | $45.20 | $35.00 | $45.00 | $35.00 |
| 0127 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 1,537 | $23.50 | $22.00 | $42.20 | $22.00 | $42.00 | $22.00 |
| 0128 | Luminaire, low lumen roadway (807-12202) | EACH | 12 | $640.00 | $600.00 | $602.50 | $600.00 | $600.00 | $600.00 |
| 0129 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 12 | $2,670.00 | $2,500.00 | $3,012.00 | $2,500.00 | $3,000.00 | $2,500.00 |
| 0130 | Light pole, 30 FT E.M.H., 8 FT mast arm, breakaway base (807-85488) | EACH | 12 | $3,735.00 | $3,500.00 | $3,615.00 | $3,500.00 | $3,600.00 | $3,500.00 |
| 0131 | Service point, type I (807-86805) | EACH | 1 | $10,500 | $9,800.00 | $11,045 | $9,800.00 | $11,000 | $9,800.00 |
| 0132 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 1,368 | $1.50 | $1.50 | $2.00 | $1.50 | $2.00 | $1.50 |
| 0133 | Connector kit, unfused (807-86910) | EACH | 12 | $32.00 | $30.00 | $65.30 | $30.00 | $65.00 | $30.00 |
| 0134 | Connector kit, fused (807-86915) | EACH | 12 | $32.00 | $30.00 | $65.30 | $30.00 | $65.00 | $30.00 |
| 0135 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 25 | $32.00 | $30.00 | $20.10 | $30.00 | $20.00 | $30.00 |
| 0136 | Multiple compression fitting, waterproofed (807-86925) | EACH | 8 | $48.00 | $45.00 | $25.10 | $45.00 | $25.00 | $45.00 |
| 0137 | Insulation link, non- waterproofed (807-86930) | EACH | 31 | $32.00 | $30.00 | $20.10 | $30.00 | $20.00 | $30.00 |
| 0138 | Insulation link, waterproofed (807-86935) | EACH | 16 | $48.00 | $45.00 | $25.10 | $45.00 | $25.00 | $45.00 |
| 0139 | Pavement message marking , one way (808-06609) | EACH | 1 | $320.00 | $300.00 | $301.00 | $300.00 | $300.00 | $300.00 |
| 0140 | Line, remove (808-06716) | LFT | 4,615 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0141 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,200.00 | $2,000.00 | $2,008.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0142 | Line, thermoplastic, dotted, white, 6 in. (808-11650) | LFT | 85 | $1.00 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
| 0143 | Transverse marking, thermoplastic, yield line, white, 27 in. (808-11698) | LFT | 73 | $10.50 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0144 | Grooving for pavement markings (808-12032) | LFT | 23,728 | $1.00 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
| 0145 | Line, thermoplastic, solid, white, 10 in. (808-12667) | LFT | 160 | $3.00 | $2.75 | $2.75 | $2.75 | $2.75 | $2.75 |
| 0146 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 9,277 | $1.00 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
| 0147 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 11,881 | $1.00 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
| 0148 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 37 | $3.50 | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 |
| 0149 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 52 | $3.50 | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 |
| 0150 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 118 | $10.50 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0151 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 45 | $101.00 | $95.00 | $95.40 | $95.00 | $95.00 | $95.00 |
| 0152 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 2,236 | $1.00 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.