INDOT contract R-39911-B bid tabulation
PAVEMENT REPLACEMENT. Let by Indiana DOT on January 14, 2026, Scott, Seymour. 4 bids received; low bid $5,784,721 by Dave Omara Contractor Inc.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 172
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dave Omara Contractor Inc | $5,784,721 | Low |
| 2 | Libs Paving Company Inc | $6,478,452 | +12% |
| 3 | Mac Construction & Excavating Inc | $7,235,000 | +25% |
| 4 | E & B Paving LLC | $8,465,500 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dave Omara Contractor Inc | 2. Libs Paving Company Inc | 3. Mac Construction & Excavating Inc | 4. E & B Paving LLC |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $59,000 | $100,000 | $100,000 | $210,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $289,000 | $320,000 | $340,000 | $420,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $115,000 | $75,000 | $216,090 | $150,000 |
| 0013 | Pavement removal (202-02240) | SYS | 4,142 | $8.90 | $5.00 | $12.00 | $43.00 |
| 0014 | Curb, concrete, remove (202-02278) | LFT | 5,983 | $9.94 | $1.00 | $8.50 | $11.00 |
| 0015 | Curb and gutter, remove (202-02279) | LFT | 430 | $11.23 | $1.00 | $10.50 | $32.00 |
| 0016 | Regulated materials, dispose, type C (202-05544) | GAL | 50 | $35.00 | $53.50 | $53.50 | $151.00 |
| 0017 | Regulated materials, remove, type C (202-05549) | GAL | 50 | $60.00 | $98.00 | $98.00 | $122.00 |
| 0018 | Regulated materials, transport, type C (202-05554) | GAL | 50 | $35.00 | $35.00 | $35.00 | $35.00 |
| 0019 | Relocate , pedestrian pedestal and signal pole (202-06542) | EACH | 1 | $545.00 | $500.00 | $500.00 | $3,700.00 |
| 0020 | Contaminated soil, remove (202-06580) | CYS | 10 | $375.00 | $310.00 | $310.00 | $600.00 |
| 0021 | Testing for wastes, type C (202-07603) | EACH | 1 | $5,200.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0022 | Sign, remove (202-74035) | EACH | 2 | $54.00 | $50.00 | $127.80 | $50.00 |
| 0023 | Detector housing, remove (202-90277) | EACH | 5 | $327.00 | $300.00 | $300.00 | $300.00 |
| 0024 | Inlet, remove (202-91385) | EACH | 18 | $580.00 | $450.00 | $500.00 | $1,850.00 |
| 0025 | Post, remove (202-94747) | EACH | 41 | $54.00 | $50.00 | $150.00 | $716.04 |
| 0026 | Pipe, remove (202-96133) | LFT | 284 | $65.00 | $30.00 | $70.00 | $44.00 |
| 0027 | Excavation, common (203-02000) | CYS | 975 | $49.00 | $95.00 | $130.00 | $265.00 |
| 0028 | Borrow (203-02070) | CYS | 370 | $92.00 | $109.00 | $90.00 | $50.00 |
| 0029 | Stormwater management budget (205-12108) | DOL | 17,974 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0030 | Stormwater management implementation (205-12616) | LS | 1 | $49,000 | $25,000 | $150,000 | $138,529 |
| 0031 | SWQCP preparation (205-12618) | LS | 1 | $4,900.00 | $5,000.00 | $4,500.00 | $2,150.00 |
| 0032 | Subgrade treatment, type II (207-08264) | SYS | 3,274 | $27.00 | $45.00 | $29.00 | $50.00 |
| 0033 | Subgrade treatment, type III (207-08266) | SYS | 3,838 | $13.00 | $5.00 | $4.00 | $5.00 |
| 0034 | Subgrade treatment, type IC (207-09935) | SYS | 7,140 | $35.00 | $65.00 | $55.00 | $64.00 |
| 0035 | B borrow (211-02050) | CYS | 43 | $63.00 | $295.00 | $110.00 | $260.00 |
| 0036 | Structure backfill, type 2 (211-09265) | CYS | 3,860 | $73.00 | $65.00 | $71.00 | $57.00 |
| 0037 | Geogrid, type IB (214-11796) | SYS | 5,877 | $3.95 | $1.24 | $2.85 | $4.50 |
| 0038 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,833 | $5.35 | $3.50 | $5.00 | $6.00 |
| 0039 | Compacted aggregate, no. 5 (301-12232) | CYS | 100 | $99.00 | $230.00 | $170.00 | $200.00 |
| 0040 | Compacted aggregate, no. 8 (301-12233) | CYS | 27 | $73.00 | $270.00 | $150.00 | $140.00 |
| 0041 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,504 | $82.00 | $170.00 | $125.00 | $147.00 |
| 0042 | Dense graded subbase (302-07455) | CYS | 413 | $106.00 | $170.00 | $140.00 | $200.00 |
| 0043 | Compacted aggregate, no. 53 (303-01180) | TON | 48 | $42.00 | $160.00 | $145.00 | $135.00 |
| 0044 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 420 | $42.00 | $125.00 | $90.00 | $95.00 |
| 0045 | Widening with HMA, type C (304-07494) | TON | 1,442 | $135.00 | $150.00 | $222.00 | $210.00 |
| 0046 | Milling, profile (306-11872) | SYS | 13,421 | $2.00 | $3.60 | $1.50 | $3.25 |
| 0047 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 1,376 | $103.00 | $132.00 | $127.00 | $110.00 |
| 0048 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 1,201 | $84.00 | $132.00 | $112.00 | $70.00 |
| 0049 | Joint adhesive (401-11526) | LFT | 7,701 | $1.00 | $0.01 | $0.95 | $0.10 |
| 0050 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 18,804 | $3.35 | $2.55 | $2.55 | $2.50 |
| 0051 | HMA for temporary pavement, type C (402-10086) | TON | 342 | $137.00 | $260.00 | $169.00 | $325.00 |
| 0052 | Asphalt for tack coat (406-05520) | TON | 9 | $654.00 | $1,100.00 | $0.01 | $1.00 |
| 0053 | D-1 contraction joint (503-05240) | LFT | 62 | $22.00 | $35.00 | $14.25 | $27.39 |
| 0054 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $4,360.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0055 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $4,142.00 | $5,500.00 | $3,800.00 | $3,800.00 |
| 0056 | Fence , wrought iron (603-03829) | LFT | 102 | $517.00 | $475.00 | $475.00 | $475.00 |
| 0057 | HMA for sidewalk (604-05528) | TON | 461 | $147.00 | $175.00 | $144.00 | $165.00 |
| 0058 | Sidewalk, concrete (604-06070) | SYS | 2,090 | $67.00 | $85.00 | $53.00 | $58.43 |
| 0059 | Curb ramp, concrete (604-08086) | SYS | 286 | $121.00 | $265.00 | $113.00 | $111.09 |
| 0060 | Detectable warning surfaces (604-12083) | SYS | 51 | $375.00 | $340.00 | $225.00 | $418.63 |
| 0061 | Steps, concrete (604-44251) | CYS | 1 | $2,070.00 | $3,000.00 | $1,800.00 | $3,815.53 |
| 0062 | Handrail, steel (604-92237) | LFT | 6 | $1,034.00 | $685.00 | $685.00 | $685.00 |
| 0063 | Curb, concrete (605-06120) | LFT | 1,869 | $32.00 | $40.00 | $21.95 | $38.83 |
| 0064 | Curb and gutter, concrete (605-06140) | LFT | 6,540 | $31.00 | $30.00 | $28.95 | $28.53 |
| 0065 | Center curb, concrete, type D (605-06215) | LFT | 24 | $95.00 | $76.00 | $49.00 | $165.72 |
| 0066 | HMA for approaches, type C (610-07488) | TON | 177 | $205.00 | $195.00 | $275.00 | $325.00 |
| 0067 | PCCP for approaches, 6 in. (610-08446) | SYS | 434 | $87.00 | $115.00 | $75.00 | $102.08 |
| 0068 | PCCP for approaches, 9 in. (610-09108) | SYS | 2,039 | $97.00 | $135.00 | $94.00 | $100.06 |
| 0069 | Monument, type B (615-06505) | EACH | 9 | $1,035.00 | $950.00 | $950.00 | $950.00 |
| 0070 | Riprap, revetment (616-06405) | TON | 16 | $61.00 | $130.00 | $210.00 | $95.00 |
| 0071 | Geotextile for riprap, type 1A (616-12246) | SYS | 21 | $18.00 | $28.00 | $12.00 | $5.00 |
| 0072 | Mulching material (621-06565) | TON | 1 | $20.00 | $490.00 | $490.00 | $10.00 |
| 0073 | Water (621-06567) | KGAL | 23 | $10.00 | $2.00 | $2.00 | $0.01 |
| 0074 | Sodding (621-06574) | SYS | 5,434 | $8.75 | $5.56 | $5.56 | $8.00 |
| 0075 | Plant, deciduous tree, multi-stem, 72 in. to 96 in. (622-05645) | EACH | 6 | $1,090.00 | $934.00 | $934.00 | $1,000.00 |
| 0076 | Computer system equipment (628-11976) | EACH | 4 | $228.00 | $1,000.00 | $1,350.00 | $750.00 |
| 0077 | Field office, type D (628-12683) | MOS | 30 | $2,385.00 | $4,800.00 | $4,600.00 | $3,400.00 |
| 0078 | Topsoil processing and distribution (629-000149) | SYS | 5,434 | $8.85 | $12.00 | $12.50 | $22.00 |
| 0079 | Topsoil amendment budget (629-000150) | DOL | 10,868 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0080 | Reinforcing bars, epoxy coated (703-06029) | LBS | 5,432 | $1.63 | $8.00 | $4.50 | $2.25 |
| 0081 | Reinforced concrete moment slab, 12 in. (706-08496) | SYS | 65 | $395.00 | $260.00 | $191.00 | $277.44 |
| 0082 | Reinforced concrete moment slab, 14 in. (706-08500) | SYS | 93 | $343.00 | $295.00 | $240.00 | $307.85 |
| 0083 | Railing, concrete type FT (706-09959) | LFT | 116 | $145.00 | $225.00 | $90.00 | $248.64 |
| 0084 | Railing, concrete type PF-1 (706-09962) | LFT | 45 | $208.00 | $215.00 | $300.00 | $466.19 |
| 0085 | Railing, steel type PF-1 (706-11404) | LFT | 45 | $136.00 | $125.00 | $125.00 | $125.00 |
| 0086 | Surface seal (709-51821) | LS | 1 | $2,340.00 | $2,500.00 | $3,147.28 | $2,147.28 |
| 0087 | Masonry column , A (710-11640) | EACH | 6 | $11,375 | $13,500 | $9,500.00 | $9,180.00 |
| 0088 | Masonry column , B (710-11640) | EACH | 2 | $12,785 | $20,000 | $18,500 | $10,500 |
| 0089 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 6,520 | $10.60 | $9.50 | $26.00 | $25.00 |
| 0090 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 3,720 | $75.00 | $50.00 | $90.00 | $170.00 |
| 0091 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 2,054 | $81.00 | $55.00 | $100.00 | $180.00 |
| 0092 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 814 | $100.00 | $62.00 | $92.00 | $220.00 |
| 0093 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 720 | $123.00 | $84.00 | $153.00 | $230.00 |
| 0094 | Geotextile for underdrains, type 1B (718-12306) | SYS | 5,216 | $3.62 | $2.00 | $4.25 | $5.00 |
| 0095 | Aggregate for underdrains (718-52610) | CYS | 587 | $73.00 | $55.00 | $72.00 | $56.00 |
| 0096 | Manhole, type J15, modified (720-01092) | EACH | 7 | $5,050.00 | $6,700.00 | $8,500.00 | $8,500.00 |
| 0097 | Casting, inlet, adjust to grade (720-12797) | EACH | 2 | $1,196.00 | $3,200.00 | $1,300.00 | $2,500.00 |
| 0098 | Casting, manhole, adjust to grade (720-12798) | EACH | 8 | $1,196.00 | $1,100.00 | $1,300.00 | $2,500.00 |
| 0099 | Inlet, type E7 (720-45030) | EACH | 8 | $1,865.00 | $4,500.00 | $4,500.00 | $4,250.00 |
| 0100 | Inlet, type R13 (720-45075) | EACH | 1 | $2,575.00 | $4,400.00 | $4,800.00 | $5,000.00 |
| 0101 | Manhole, type C4 (720-45410) | EACH | 50 | $3,010.00 | $4,400.00 | $5,200.00 | $6,750.00 |
| 0102 | Manhole, type C4, modified (720-45510) | EACH | 3 | $3,287.00 | $4,600.00 | $6,200.00 | $7,000.00 |
| 0103 | Inlet, type B15 (720-98174) | EACH | 56 | $2,872.00 | $4,800.00 | $6,300.00 | $5,000.00 |
| 0104 | Inlet, type C15 (720-98555) | EACH | 11 | $3,070.00 | $4,800.00 | $6,300.00 | $5,000.00 |
| 0105 | Catch basin, type C15 (720-99417) | EACH | 1 | $3,327.00 | $5,100.00 | $7,000.00 | $6,000.00 |
| 0106 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 35,942 | $2.75 | $1.75 | $1.75 | $1.75 |
| 0107 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 15 | $238.00 | $135.00 | $135.00 | $135.00 |
| 0108 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 104 | $14.50 | $13.01 | $13.01 | $13.01 |
| 0109 | Temporary traffic signal installation, maintain (801-06539) | LS | 1 | $7,085.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 0110 | Construction sign, type A (801-06640) | EACH | 30 | $343.00 | $210.00 | $210.00 | $210.00 |
| 0111 | Construction sign, type B (801-06645) | EACH | 22 | $92.00 | $115.00 | $115.00 | $115.00 |
| 0112 | Maintaining traffic (801-06775) | LS | 1 | $263,472 | $164,000 | $450,000 | $325,000 |
| 0113 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 8 | $6,213.00 | $8,000.00 | $5,700.00 | $5,700.00 |
| 0114 | Barricade, type III-A (801-07118) | LFT | 302 | $18.53 | $17.00 | $17.00 | $17.00 |
| 0115 | Temporary traffic barrier, type 2 (801-08401) | LFT | 418 | $65.00 | $69.00 | $58.00 | $125.00 |
| 0116 | Temporary accessible pedestrian path (801-12641) | SYS | 27 | $87.00 | $165.00 | $76.55 | $350.00 |
| 0117 | Temporary pedestrian channelizer (801-12862) | LFT | 36 | $54.00 | $35.00 | $76.55 | $27.58 |
| 0118 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 504 | $32.00 | $30.00 | $42.16 | $30.00 |
| 0119 | Sign, sheet, relocate (802-07060) | EACH | 40 | $272.00 | $250.00 | $329.72 | $250.00 |
| 0120 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 107 | $32.00 | $30.00 | $40.72 | $30.00 |
| 0121 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 31 | $37.00 | $34.00 | $41.03 | $34.00 |
| 0122 | Traffic signal equipment, remove (805-01300) | EACH | 3 | $1,363.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 0123 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 1 | $5,450.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0124 | Handhole, signal, type 1 (805-01842) | EACH | 1 | $2,725.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0125 | Handhole, signal, adjust to grade (805-01843) | EACH | 3 | $545.00 | $500.00 | $500.00 | $500.00 |
| 0126 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 1,793 | $41.00 | $38.00 | $38.00 | $38.00 |
| 0127 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $1,417.00 | $1,300.00 | $1,300.00 | $1,300.00 |
| 0128 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 5 | $981.00 | $900.00 | $900.00 | $900.00 |
| 0129 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 5 | $1,635.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0130 | Signal pole, pedestal, 4 FT (805-05405) | EACH | 1 | $1,090.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0131 | Conduit, PVC, 2 in. (805-06595) | LFT | 5,419 | $27.00 | $25.00 | $25.00 | $25.00 |
| 0132 | Loop detector delay amplifier, counting, no. 2 channel (805-09539) | EACH | 5 | $654.00 | $600.00 | $600.00 | $600.00 |
| 0133 | Conduit, PVC, 2 in. schedule 80 (805-11813) | LFT | 30 | $27.00 | $25.00 | $25.00 | $25.00 |
| 0134 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 200 | $22.00 | $20.00 | $20.00 | $20.00 |
| 0135 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 250 | $23.00 | $21.00 | $21.00 | $21.00 |
| 0136 | Pedestrian push button, APS (805-11817) | EACH | 8 | $1,362.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 0137 | Traffic signal head, no. 3 (805-78205) | EACH | 8 | $1,254.00 | $1,150.00 | $1,150.00 | $1,150.00 |
| 0138 | Traffic signal head, no. 4 (805-78225) | EACH | 4 | $1,580.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 0139 | Span, catenary, and tether (805-78415) | EACH | 2 | $4,360.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0140 | Disconnect hanger (805-78420) | EACH | 4 | $654.00 | $600.00 | $600.00 | $600.00 |
| 0141 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0142 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 3,500 | $4.63 | $4.25 | $4.25 | $4.25 |
| 0143 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 250 | $4.90 | $4.50 | $4.50 | $4.50 |
| 0144 | Signal cable, control, copper, 9C/14 gauge (805-78495) | LFT | 700 | $5.00 | $4.75 | $4.75 | $4.75 |
| 0145 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 1,150 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0146 | Signal detector housing (805-78785) | EACH | 5 | $2,180.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0147 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 900 | $11.00 | $10.00 | $10.00 | $10.00 |
| 0148 | Signal pole, steel strain, 36 FT (805-81060) | EACH | 1 | $12,500 | $11,500 | $11,500 | $11,500 |
| 0149 | Signal pole, pedestal, 10 FT (805-90005) | EACH | 4 | $1,417.00 | $1,300.00 | $1,300.00 | $1,300.00 |
| 0150 | Handhole, lighting (807-02191) | EACH | 26 | $1,635.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0151 | Light structure, remove and reset , type A (807-02370) | EACH | 3 | $1,635.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0152 | Light structure, remove and reset , type B (807-02370) | EACH | 3 | $4,905.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0153 | Luminaire, ornamental (807-03950) | EACH | 3 | $1,689.00 | $1,550.00 | $1,550.00 | $1,550.00 |
| 0154 | Light pole, ornamental (807-03951) | EACH | 1 | $10,355 | $9,500.00 | $9,500.00 | $9,500.00 |
| 0155 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 866 | $24.00 | $22.00 | $22.00 | $22.00 |
| 0156 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 6 | $2,725.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0157 | Service point, type I (807-86805) | EACH | 1 | $9,800.00 | $9,000.00 | $9,000.00 | $9,000.00 |
| 0158 | Cable-duct marker (807-86955) | EACH | 2 | $435.00 | $400.00 | $400.00 | $400.00 |
| 0159 | Luminaire, remove and relocate (807-91082) | EACH | 1 | $1,362.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 0160 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 1,120 | $10.00 | $12.15 | $12.15 | $12.15 |
| 0161 | Line, remove (808-06716) | LFT | 8,445 | $0.53 | $0.55 | $0.55 | $0.65 |
| 0162 | Retro-reflectivity testing (808-09381) | LS | 1 | $8,644.00 | $4,055.00 | $4,055.00 | $4,055.00 |
| 0163 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 6,742 | $1.75 | $1.15 | $1.15 | $1.15 |
| 0164 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 7,244 | $1.75 | $1.15 | $1.15 | $1.15 |
| 0165 | Grooving for pavement markings (808-12032) | LFT | 15,402 | $1.00 | $0.60 | $0.60 | $1.67 |
| 0166 | Line, multi-component, dotted, white, 6 in. (808-12353) | LFT | 50 | $1.75 | $5.00 | $5.00 | $5.00 |
| 0167 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 1,366 | $1.75 | $1.50 | $1.50 | $1.50 |
| 0168 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 279 | $5.00 | $7.04 | $7.04 | $7.04 |
| 0169 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 35 | $5.00 | $7.04 | $7.04 | $7.04 |
| 0170 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 220 | $10.00 | $11.31 | $11.31 | $11.31 |
| 0171 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 38 | $225.00 | $196.88 | $196.88 | $196.88 |
| 0172 | Snowplowable raised pavement marker (808-75998) | EACH | 60 | $135.00 | $125.00 | $49.00 | $49.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.