INDOT contract B-45038-A bid tabulation

BRIDGE DECK OVERLAY. Let by Indiana DOT on November 13, 2025, Franklin, Seymour. 3 bids received; low bid $2,291,025 by Paul H Rohe Company Inc.

Owner
Indiana DOT
Letting
13 NOV 2025
Pay items
89
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Paul H Rohe Company Inc$2,291,025Low
2Beaty Construction Inc$2,301,8700.0%
3Dave Omara Contractor Inc$2,535,337+11%
INDOT contract B-45038-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Paul H Rohe Company Inc2. Beaty Construction Inc3. Dave Omara Contractor Inc
0001Construction engineering (105-06845)LS1$5,900.00$15,000$5,900.00
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$68,882$150,000$127,000
0011Pavement removal (202-02240)SYS142$120.00$50.00$160.00
0012Present structure, remove portions, structure no. 1 (202-51328)LS1$261,755$95,000$225,000
0013Sidewalk concrete, remove (202-52710)SYS84$44.00$45.40$40.00
0014Excavation, common (203-02000)CYS635$37.00$55.00$140.00
0015Stormwater management budget (205-12108)DOL4,193$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$2,500.00$15,000$5,000.00
0017Subgrade treatment, type IC (207-09935)SYS1,800$52.00$41.00$50.00
0018Aggregate for end bent backfill (211-06467)CYS11$200.00$230.00$300.00
0019Geotextile for pavement, type 2B (214-12239)SYS689$7.00$4.00$2.50
0020Compacted aggregate, no. 53 (301-12234)CYS49$160.00$130.00$110.00
0021Subbase for PCCP (302-06464)CYS100$140.00$185.00$150.00
0022Milling, transition (306-08043)SYS734$10.00$10.00$9.75
0023QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON177$185.00$120.00$120.00
0024QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON194$175.00$120.00$120.00
0025QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON667$125.00$120.00$120.00
0026Joint adhesive (401-11526)LFT3,260$0.80$1.00$1.00
0027Asphalt for tack coat (406-05521)SYS4,947$0.70$0.50$0.50
0028Terminal joint, type HMA (503-12477)LFT90$500.00$540.00$550.00
0029Guardrail, remove (601-02241)LFT230$0.01$2.18$2.00
0030Guardrail, reset , modified (601-06035)LFT465$68.00$68.00$68.00
0031Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT50$23.00$23.00$23.00
0032Guardrail transition, MGS without curb , modified (601-12292)EACH2$3,350.00$3,350.00$3,350.00
0033Guardrail end treatment, type OS (601-94689)EACH2$2,750.00$2,750.00$2,750.00
0034Barrier delineator (602-06729)EACH11$40.00$35.00$35.00
0035Sidewalk, concrete (604-06070)SYS68$140.00$175.00$80.00
0036Curb ramp, concrete (604-08086)SYS13$230.00$280.00$300.00
0037Detectable warning surfaces (604-12083)SYS3$300.00$600.00$200.00
0038Reinforced concrete bridge approach, 14 in. , modified (609-06262)SYS395$170.00$185.00$200.00
0039Clean steel bridge, QP-2, bridge no. bridge no. 1 (619-11052)LS1$208,000$208,000$190,000
0040Disposal of cleaning waste, hazardous, bridge no. bridge no. 1 (619-12459)LS1$5,000.00$5,000.00$8,500.00
0041Coat steel bridge, bridge no. bridge no. 1 (619-51859)LS1$50,000$50,000$70,000
0042Computer system equipment (628-11976)EACH2$950.00$1,000.00$900.00
0043Field office, type D (628-12683)MOS10$3,700.00$3,500.00$2,700.00
0044Temporary shoring (702-04325)LS1$74,500$50,000$44,000
0045Field drilled hole in concrete , modified (702-51863)EACH64$44.00$75.00$15.00
0046Reinforcing bars, epoxy coated (703-06029)LBS46,297$1.33$1.75$1.80
0047Threaded tie bar assembly, epoxy coated (703-97936)EACH274$58.00$50.00$35.00
0048Concrete, C, superstructure (704-51002)CYS94.50$2,495.00$1,000.00$4,000.00
0049Concrete bridge railing transition, type TPF-1 (706-06351)EACH2$16,050$6,750.00$9,000.00
0050Railing, steel type PF-1 (706-11404)LFT305$73.00$73.00$73.00
0051Railing, concrete type PF-1 , modified (706-11602)CYS20$1,660.00$3,000.00$1,877.00
0052Surface seal , bridge no. 1 (709-51821)LS1$5,720.00$8,500.00$5,719.97
0053Drilled hole (711-51864)EACH64$80.00$79.69$79.69
0054Jacking and supporting structural steel , bridge no. 1 (711-93035)LS1$43,670$85,000$18,700
0055Pipe, end bent drain, diameter 6 in. (715-05407)LFT142$72.00$20.00$40.00
0056Geotextile for underdrains, type 2A (718-12307)SYS60$8.00$8.40$3.00
0057Bridge deck overlay, rigid (722-000134)SYS1,456$170.00$98.00$135.00
0058Hydrodemolition (722-01066)SYS1,340$70.00$70.00$55.55
0059Bridge deck overlay budget (722-12380)DOL29,700$1.00$1.00$1.00
0060Bridge deck, remove concrete surface (722-12464)SYS1,340$8.60$12.00$13.50
0061Longitudinal grooving (722-12732)SYS1,788$3.50$12.50$3.50
0062Bridge deck patching, full depth (722-51401)SFT363$38.00$50.00$115.00
0063Bridge expansion joint, type PCF (724-12773)LFT16$110.00$1,500.00$600.00
0064Bearing assembly, elastomeric (726-92406)EACH16$875.00$4,500.00$4,150.00
0065Temporary pavement marking, removable, 6 in. (801-06209)LFT4,032$3.25$1.94$1.98
0066Temporary transverse pavement marking, removable, 24 in. (801-06218)LFT24$14.95$12.34$11.81
0067Construction sign, type A (801-06640)EACH12$165.00$232.00$199.00
0068Construction sign, type B (801-06645)EACH8$120.00$108.00$81.00
0069Maintaining traffic (801-06775)LS1$33,925$175,000$45,000
0070Energy absorbing terminal, CZ, TL-2 (801-07023)EACH2$6,000.00$6,000.00$6,000.00
0071Barricade, type III-B (801-07119)LFT304$16.00$18.34$16.00
0072Temporary traffic barrier, type 2 (801-08401)LFT330$54.00$95.00$51.28
0073Temporary traffic barrier, anchored, type 2 (801-08508)LFT580$49.00$65.00$69.49
0074Portable signal (801-12081)LS1$15,850$50,000$47,500
0075Temporary pedestrian channelizer (801-12862)LFT745$6.30$20.50$31.13
0076Temporary worksite speed limit sign assembly, continuous (801-12883)EACH4$1,800.00$1,233.00$280.00
0077Sign, ground mounted, reset (802-91122)EACH2$300.00$300.00$700.00
0078Conduit, steel, galvanized, 2 in. (805-01844)LFT330$35.00$35.00$35.00
0079Wire, no. 4 copper, in conduit, bridge 1/C (807-01653)LFT1,100$4.50$6.00$4.50
0080Handhole, lighting (807-02191)EACH1$1,800.00$2,000.00$1,800.00
0081Light structure, remove and reset (807-02370)EACH2$3,200.00$2,200.00$3,200.00
0082Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580)LFT25$18.00$30.00$18.00
0083Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889)LFT210$3.00$2.00$3.00
0084Line, remove (808-06716)LFT1,622$0.98$0.81$1.31
0085Line, multi-component, solid, white, 6 in. (808-10049)LFT1,565$1.15$1.27$2.50
0086Line, multi-component, solid, yellow, 6 in. (808-10057)LFT1,295$1.15$1.27$2.50
0087Grooving for pavement markings (808-12032)LFT3,030$0.45$1.44$1.78
0088Line, multi-component, broken, yellow, 6 in. (808-12841)LFT170$1.45$3.81$2.50
0089Linear grading (203-08607)LFT500$18.00$20.00$5.00
INDOT contract B-45038-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy