INDOT contract R-43320-A bid tabulation
SMALL STRUCTURE REPLACEMENT WITH BRIDGE. Let by Indiana DOT on October 8, 2025, Jefferson, Jennings, Seymour. 7 bids received; low bid $1,902,670 by 5 Star Company Inc.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 85
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | 5 Star Company Inc | $1,902,670 | Low |
| 2 | Force Construction Co Inc | $1,995,000 | +5.0% |
| 3 | Morphey Construction Inc. | $2,069,000 | +9.0% |
| 4 | Dave Omara Contractor Inc | $2,174,000 | +14% |
| 5 | Paul H Rohe Company Inc | $2,210,893 | +16% |
| 6 | Milestone Contractors LP | $2,311,587 | +21% |
| 7 | E & B Paving LLC | $2,468,500 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. 5 Star Company Inc | 2. Force Construction Co Inc | 3. Morphey Construction Inc. | 4. Dave Omara Contractor Inc | 5. Paul H Rohe Company Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $29,000 | $27,150 | $19,750 | $14,000 | $12,900 | $35,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $65,000 | $95,000 | $103,450 | $103,147 | $92,310 | $114,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $47,440 | $20,690 | $20,000 | $26,800 | $171,981 |
| 0012 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $17,000 | $37,030 | $10,000 | $16,000 | $30,745 | $111,000 |
| 0013 | Present structure, remove, structure no. CV 256-039-17.90 (202-51330) | LS | 1 | $12,500 | $32,270 | $10,000 | $16,000 | $33,120 | $113,000 |
| 0014 | Excavation, common (203-02000) | CYS | 722 | $41.00 | $66.00 | $55.00 | $48.75 | $80.00 | $76.80 |
| 0015 | Borrow (203-02070) | CYS | 335 | $30.00 | $48.00 | $35.00 | $57.00 | $70.00 | $27.50 |
| 0016 | Pump around (205-11626) | EACH | 3 | $7,500.00 | $13,540 | $10,000 | $13,700 | $7,800.00 | $20,134 |
| 0017 | Stormwater management budget (205-12108) | DOL | 16,220 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $4,500.00 | $30,510 | $2,500.00 | $50,000 | $5,500.00 | $13,196 |
| 0019 | Sheet piling steel, S=18.1 (206-04301) | SFT | 336 | $100.00 | $189.00 | $185.00 | $63.00 | $250.00 | $76.00 |
| 0020 | Excavation, wet (206-51220) | CYS | 34 | $41.00 | $131.00 | $100.00 | $56.25 | $200.00 | $176.00 |
| 0022 | Subgrade treatment, type IC (207-09935) | SYS | 1,866 | $35.00 | $31.00 | $40.00 | $31.50 | $42.50 | $50.50 |
| 0023 | B borrow (211-02050) | CYS | 330 | $40.00 | $60.00 | $45.00 | $60.00 | $82.00 | $90.00 |
| 0024 | Structure backfill, type 2 (211-09265) | CYS | 55 | $70.00 | $74.00 | $55.00 | $77.50 | $98.00 | $116.00 |
| 0025 | Structure backfill, type 5 (211-09268) | CYS | 555 | $180.00 | $175.00 | $155.00 | $313.00 | $220.00 | $215.00 |
| 0026 | Geogrid, type IB (214-11796) | SYS | 1,165 | $5.00 | $2.70 | $2.00 | $6.40 | $4.30 | $4.55 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 701 | $3.00 | $4.70 | $4.00 | $7.80 | $5.30 | $9.00 |
| 0028 | Compacted aggregate, no. 5 (301-12232) | CYS | 62 | $61.00 | $66.00 | $140.00 | $109.00 | $130.00 | $125.00 |
| 0029 | Compacted aggregate, no. 8 (301-12233) | CYS | 39 | $61.00 | $91.00 | $140.00 | $150.00 | $138.00 | $189.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 1,210 | $44.00 | $33.00 | $50.00 | $41.00 | $50.00 | $65.00 |
| 0031 | Widening with HMA, type B (304-07493) | TON | 529 | $185.00 | $179.00 | $185.00 | $201.00 | $200.00 | $110.00 |
| 0032 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,558 | $4.00 | $9.70 | $10.00 | $8.20 | $7.60 | $18.50 |
| 0033 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 301 | $190.00 | $151.00 | $145.00 | $165.00 | $185.00 | $129.00 |
| 0034 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 135 | $175.00 | $151.00 | $145.00 | $165.00 | $180.00 | $204.00 |
| 0035 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 252 | $170.00 | $151.00 | $145.00 | $165.00 | $165.00 | $164.00 |
| 0036 | Joint adhesive (401-11526) | LFT | 2,365 | $1.00 | $0.50 | $0.50 | $0.57 | $0.55 | $1.85 |
| 0037 | Asphalt for tack coat (406-05521) | SYS | 6,541 | $0.50 | $0.50 | $0.50 | $0.57 | $0.50 | $0.20 |
| 0038 | Guardrail, remove (601-02241) | LFT | 541 | $7.00 | $6.80 | $6.50 | $7.40 | $6.50 | $5.00 |
| 0039 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 694 | $23.00 | $22.00 | $21.00 | $29.00 | $21.00 | $21.00 |
| 0040 | Guardrail, MGS, long span, type 2 (601-12288) | EACH | 2 | $1,680.00 | $1,715.00 | $1,650.00 | $2,283.00 | $1,650.00 | $1,650.00 |
| 0041 | Guardrail, MGS, structure top-mounted posts (601-12293) | EACH | 8 | $610.00 | $629.00 | $605.00 | $690.00 | $605.00 | $300.00 |
| 0042 | Modified MGS W-beam post (601-12404) | EACH | 4 | $230.00 | $234.00 | $225.00 | $256.00 | $225.00 | $115.00 |
| 0043 | Guardrail end treatment, type OS (601-94689) | EACH | 8 | $2,320.00 | $2,390.00 | $2,300.00 | $2,625.00 | $2,300.00 | $3,200.00 |
| 0044 | Right-of-way marker (615-06490) | EACH | 9 | $185.00 | $192.00 | $185.00 | $211.00 | $185.00 | $155.00 |
| 0045 | Monument, type B (615-06505) | EACH | 4 | $1,280.00 | $1,325.00 | $1,275.00 | $1,455.00 | $1,275.00 | $940.00 |
| 0046 | Monument, section corner (615-06527) | EACH | 2 | $1,520.00 | $1,559.00 | $1,500.00 | $1,712.00 | $1,500.00 | $950.00 |
| 0047 | Riprap, class 1 (616-05688) | TON | 368 | $80.00 | $85.00 | $125.00 | $96.00 | $87.00 | $109.00 |
| 0048 | Riprap, class 2 (616-05689) | TON | 173 | $80.00 | $82.00 | $130.00 | $99.00 | $96.00 | $96.00 |
| 0049 | Riprap, revetment (616-06405) | TON | 58 | $64.00 | $60.00 | $110.00 | $77.00 | $90.00 | $108.00 |
| 0050 | Riprap, uniform (616-06451) | TON | 24 | $66.00 | $106.00 | $105.00 | $105.00 | $140.00 | $156.00 |
| 0051 | Geotextile for riprap, type 2B (616-12249) | SYS | 3,724 | $3.00 | $4.80 | $3.00 | $3.90 | $3.50 | $8.10 |
| 0052 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $200.00 | $208.00 | $200.00 | $228.00 | $200.00 | $200.00 |
| 0053 | Seeding wetland (621-02356) | LBS | 2 | $550.00 | $1,039.00 | $1,000.00 | $1,140.00 | $1,000.00 | $1,000.00 |
| 0054 | Erosion control blanket (621-02770) | SYS | 1,014 | $2.50 | $2.90 | $6.00 | $3.14 | $2.75 | $2.75 |
| 0055 | Seed mixture, type R (621-06553) | LBS | 43 | $35.00 | $36.00 | $35.00 | $40.00 | $35.00 | $35.00 |
| 0056 | Mulched seeding, type R (621-06559) | SYS | 989 | $2.00 | $4.40 | $15.00 | $4.85 | $4.25 | $4.25 |
| 0057 | Water (621-06567) | KGAL | 1 | $1.00 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 |
| 0058 | Sodding (621-06574) | SYS | 61 | $31.00 | $83.00 | $85.00 | $91.00 | $80.00 | $80.00 |
| 0059 | Computer system equipment (628-11976) | EACH | 4 | $550.00 | $1,112.00 | $500.00 | $1,700.00 | $1,000.00 | $620.00 |
| 0060 | Field office, type D (628-12683) | MOS | 30 | $3,500.00 | $5,004.00 | $2,400.00 | $1,997.00 | $3,300.00 | $3,228.00 |
| 0061 | Surface seal (709-51821) | LS | 1 | $5,000.00 | $3,676.00 | $3,600.00 | $4,000.00 | $3,100.00 | $1,500.00 |
| 0062 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,756 | $3.50 | $4.10 | $2.50 | $5.70 | $3.50 | $4.05 |
| 0063 | Waterproofing membrane, type 3 (714-000087) | SFT | 2,038 | $7.80 | $6.40 | $2.50 | $8.20 | $3.40 | $3.25 |
| 0064 | Structure, reinforced concrete, box sections, 18 FT X 7 FT (714-11111) | LFT | 52 | $7,500.00 | $3,502.00 | $5,700.00 | $8,600.00 | $4,890.00 | $6,599.00 |
| 0065 | Structure, reinforced concrete, box sections, 18 FT X 10 FT (714-11128) | LFT | 39 | $6,250.00 | $5,924.00 | $10,200 | $7,600.00 | $8,735.00 | $5,416.00 |
| 0066 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 124 | $85.00 | $72.00 | $70.00 | $87.00 | $110.00 | $109.00 |
| 0067 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $245.00 | $1,030.00 | $1,500.00 | $1,520.00 | $1,530.00 | $1,321.00 |
| 0068 | Inlet, type F7 (720-45035) | EACH | 1 | $1,450.00 | $2,747.00 | $3,800.00 | $2,100.00 | $5,450.00 | $5,360.00 |
| 0069 | Road closure sign assembly (801-04308) | EACH | 4 | $180.00 | $312.00 | $300.00 | $245.00 | $300.00 | $300.00 |
| 0070 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 7,203 | $2.10 | $1.80 | $1.68 | $2.80 | $1.70 | $1.10 |
| 0071 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 72 | $11.00 | $10.00 | $10.00 | $15.00 | $10.00 | $3.35 |
| 0072 | Detour route marker assembly (801-06625) | EACH | 20 | $79.00 | $120.00 | $115.00 | $200.00 | $115.00 | $115.00 |
| 0073 | Construction sign, type A (801-06640) | EACH | 66 | $205.00 | $140.00 | $135.00 | $324.00 | $135.00 | $135.00 |
| 0074 | Maintaining traffic (801-06775) | LS | 1 | $85,000 | $152,777 | $34,921 | $61,176 | $32,325 | $11,005 |
| 0075 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 4 | $6,000.00 | $6,027.00 | $5,800.00 | $6,800.00 | $5,800.00 | $6,800.00 |
| 0076 | Barricade, type III-A (801-07118) | LFT | 48 | $16.00 | $17.00 | $16.00 | $11.00 | $16.00 | $16.00 |
| 0077 | Barricade, type III-B (801-07119) | LFT | 68 | $16.00 | $17.00 | $16.00 | $13.00 | $16.00 | $16.00 |
| 0078 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,500 | $15.00 | $42.00 | $45.00 | $29.00 | $33.00 | $30.00 |
| 0080 | Portable signal (801-12081) | LS | 1 | $9,500.00 | $18,810 | $10,000 | $11,000 | $10,000 | $12,000 |
| 0081 | Line, remove (808-06716) | LFT | 720 | $1.00 | $0.80 | $0.75 | $1.14 | $0.75 | $0.75 |
| 0082 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 121 | $1.55 | $0.80 | $0.75 | $2.00 | $0.75 | $0.75 |
| 0083 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,742 | $1.30 | $0.80 | $0.75 | $1.00 | $0.75 | $0.75 |
| 0084 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 776 | $1.30 | $0.80 | $0.75 | $1.00 | $0.75 | $0.75 |
| 0085 | Temporary shoring (702-04325) | LS | 1 | $55,000 | $35,070 | $110,000 | $26,000 | $199,840 | $20,000 |
| 0086 | Excavation, X (206-51215) | CYS | 57 | $250.00 | $157.00 | $250.00 | $142.00 | $211.92 | $395.00 |
| 0087 | Temporary buzz strips (801-97643) | LFT | 120 | $23.00 | $23.00 | $22.55 | $35.00 | $22.55 | $22.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.