INDOT contract R-44130-A bid tabulation
AUXILIARY LANE CONSTRUCTION. Let by Indiana DOT on March 11, 2026, Shelby, Greenfield. 11 bids received; low bid $761,882 by Olco Inc.
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 102
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Olco Inc | $761,882 | Low |
| 2 | Paul H Rohe Company Inc | $825,705 | +8.0% |
| 3 | Dave Omara Contractor Inc | $867,054 | +14% |
| 4 | Beaty Construction Inc | $872,107 | +14% |
| 5 | Rieth-Riley Construction Co., Inc. | $878,986 | +15% |
| 6 | Calumet Civil Contractors Inc | $879,000 | +15% |
| 7 | E & B Paving LLC | $979,183 | +29% |
| 8 | William Charles Construction Company | $1,019,802 | +34% |
| 9 | Morphey Construction Inc. | $1,085,000 | +42% |
| 10 | Milestone Contractors LP | $1,090,175 | +43% |
| 11 | 5 Star Company Inc | $1,156,311 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Olco Inc | 2. Paul H Rohe Company Inc | 3. Dave Omara Contractor Inc | 4. Beaty Construction Inc | 5. Rieth-Riley Construction Co., Inc. | 6. Calumet Civil Contractors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,590 | $8,590.00 | $15,000 | $22,000 | $9,800.00 | $15,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $21,665 | $38,790 | $42,850 | $43,250 | $84,505 | $39,674 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $16,659 | $7,740.00 | $8,570.00 | $8,650.00 | $6,958.53 | $7,000.00 |
| 0012 | Pavement removal (202-02240) | SYS | 92 | $36.81 | $80.00 | $42.00 | $50.00 | $40.79 | $30.82 |
| 0013 | Curb, concrete, remove (202-02278) | LFT | 371 | $20.37 | $20.00 | $12.00 | $6.00 | $22.58 | $15.51 |
| 0014 | Curb and gutter, remove (202-02279) | LFT | 182 | $24.44 | $30.00 | $12.00 | $12.00 | $28.44 | $21.45 |
| 0015 | Sidewalk concrete, remove (202-52710) | SYS | 464 | $21.47 | $29.00 | $18.00 | $15.00 | $20.69 | $17.82 |
| 0016 | Sign, remove (202-74035) | EACH | 3 | $60.00 | $50.00 | $57.00 | $60.00 | $400.00 | $400.00 |
| 0017 | Excavation, common (203-02000) | CYS | 385 | $65.14 | $60.00 | $49.00 | $35.00 | $88.11 | $42.88 |
| 0018 | Stormwater management budget (205-12108) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $4,564.72 | $4,500.00 | $4,100.00 | $7,000.00 | $1,943.95 | $2,653.33 |
| 0020 | Subgrade treatment, type II (207-08264) | SYS | 551 | $31.84 | $40.00 | $21.00 | $24.25 | $37.33 | $54.42 |
| 0021 | Structure backfill, type 2 (211-09265) | CYS | 133 | $96.47 | $110.00 | $57.00 | $54.50 | $45.19 | $82.26 |
| 0022 | Geogrid, type IB (214-11796) | SYS | 514 | $4.28 | $6.00 | $6.00 | $3.75 | $3.97 | $3.26 |
| 0023 | Subbase for PCCP (302-06464) | CYS | 47 | $112.27 | $130.00 | $112.00 | $120.00 | $110.84 | $157.48 |
| 0024 | Dense graded subbase (302-07455) | CYS | 6 | $176.90 | $140.00 | $148.00 | $280.00 | $243.45 | $671.55 |
| 0025 | Widening with HMA, type C (304-07494) | TON | 124 | $213.58 | $150.00 | $230.00 | $305.00 | $299.39 | $159.84 |
| 0026 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 876 | $8.26 | $6.60 | $5.00 | $11.00 | $11.45 | $9.41 |
| 0027 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 84 | $231.50 | $220.00 | $230.00 | $225.00 | $202.93 | $265.34 |
| 0028 | Joint adhesive (401-11526) | LFT | 444 | $2.31 | $1.00 | $0.50 | $4.50 | $1.31 | $0.79 |
| 0029 | Asphalt for tack coat (406-05520) | TON | 0.30 | $2,983.20 | $1,000.00 | $600.00 | $3.33 | $0.01 | $5,998.97 |
| 0030 | QC/QA-PCCP, 12 in. (501-06323) | SYS | 183 | $235.75 | $160.00 | $270.00 | $195.00 | $151.34 | $166.56 |
| 0031 | Retrofitted tie bars (503-03489) | EACH | 99 | $27.51 | $11.00 | $73.00 | $54.00 | $24.36 | $28.64 |
| 0032 | D-1 contraction joint (503-05240) | LFT | 106 | $34.14 | $37.00 | $43.00 | $39.50 | $22.31 | $27.54 |
| 0033 | Sidewalk, concrete (604-06070) | SYS | 364 | $117.74 | $120.00 | $94.00 | $70.25 | $72.41 | $98.34 |
| 0034 | Curb ramp, concrete (604-08086) | SYS | 70 | $272.81 | $205.00 | $94.00 | $194.00 | $202.23 | $178.87 |
| 0035 | Detectable warning surfaces (604-12083) | SYS | 8 | $169.08 | $300.00 | $425.00 | $600.00 | $112.68 | $151.15 |
| 0036 | Curb, integral concrete (605-06090) | LFT | 311 | $61.19 | $70.00 | $26.00 | $32.00 | $75.85 | $40.35 |
| 0037 | Curb, integral concrete, type C (605-06100) | LFT | 54 | $65.30 | $85.00 | $28.00 | $44.50 | $73.31 | $77.32 |
| 0038 | Curb and gutter, concrete (605-06140) | LFT | 203 | $96.33 | $72.00 | $39.00 | $67.25 | $93.89 | $53.67 |
| 0039 | PCCP for approaches, 6 in. (610-08446) | SYS | 35 | $205.90 | $160.00 | $138.00 | $142.75 | $118.53 | $153.64 |
| 0040 | Right-of-way marker (615-06490) | EACH | 3 | $200.00 | $225.00 | $240.00 | $200.00 | $225.00 | $1,500.00 |
| 0041 | Sodding, nursery (621-06575) | SYS | 231 | $16.95 | $20.00 | $43.00 | $20.00 | $20.00 | $45.54 |
| 0042 | Field office, type C (628-09403) | MOS | 12 | $1,300.61 | $3,550.00 | $2,400.00 | $3,800.00 | $4,043.29 | $4,150.34 |
| 0043 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 480 | $39.72 | $50.00 | $15.00 | $34.50 | $21.68 | $27.75 |
| 0044 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 87 | $155.20 | $190.00 | $164.00 | $157.75 | $128.25 | $84.14 |
| 0045 | Pipe, type 2, circular, diameter 12 in. , WQM (715-05149) | LFT | 168 | $141.81 | $145.00 | $164.00 | $136.50 | $153.58 | $110.73 |
| 0046 | Geotextile for underdrains, type 1A (718-12305) | SYS | 188 | $5.56 | $6.00 | $12.00 | $1.55 | $0.80 | $21.00 |
| 0047 | Aggregate for underdrains (718-52610) | CYS | 11 | $130.18 | $180.00 | $195.00 | $50.00 | $45.19 | $82.26 |
| 0048 | Manhole, type C (720-94157) | EACH | 3 | $4,434.49 | $8,840.00 | $3,000.00 | $6,450.00 | $5,228.51 | $4,827.65 |
| 0049 | Casting, water valve, adjust to grade (720-94840) | EACH | 1 | $200.75 | $1,100.00 | $400.00 | $1,425.00 | $517.36 | $1,903.30 |
| 0050 | Casting, water meter, adjust to grade (720-94841) | EACH | 1 | $337.95 | $1,100.00 | $400.00 | $2,275.00 | $517.36 | $1,903.30 |
| 0051 | Inlet, type B15 (720-98174) | EACH | 5 | $4,830.45 | $6,650.00 | $3,200.00 | $3,915.00 | $4,251.43 | $4,353.00 |
| 0052 | Inlet, type C15 (720-98555) | EACH | 8 | $4,830.44 | $6,850.00 | $3,200.00 | $4,065.00 | $4,095.65 | $4,166.24 |
| 0053 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 5,018 | $2.00 | $2.00 | $2.50 | $1.93 | $2.31 | $1.93 |
| 0054 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 9 | $100.00 | $100.00 | $212.00 | $181.00 | $193.00 | $181.00 |
| 0055 | Construction sign, type A (801-06640) | EACH | 16 | $200.00 | $200.00 | $200.00 | $219.00 | $200.00 | $219.00 |
| 0056 | Construction sign, type B (801-06645) | EACH | 23 | $75.00 | $75.00 | $87.00 | $110.00 | $79.00 | $110.00 |
| 0057 | Maintaining traffic (801-06775) | LS | 1 | $32,635 | $27,965 | $163,672 | $137,290 | $47,088 | $62,000 |
| 0058 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 4 | $7,500.00 | $6,500.00 | $7,150.00 | $7,500.00 | $6,500.00 | $10,000 |
| 0059 | Barricade, type III-A (801-07118) | LFT | 40 | $18.00 | $18.00 | $16.50 | $15.93 | $15.00 | $15.93 |
| 0060 | Temporary pavement marking, 24 in. (801-07612) | LFT | 87 | $10.00 | $10.00 | $16.50 | $10.97 | $14.58 | $10.97 |
| 0061 | Temporary traffic barrier, type 2 (801-08401) | LFT | 863 | $31.61 | $26.19 | $40.00 | $36.50 | $36.21 | $55.00 |
| 0062 | Temporary curb ramp (801-11990) | EACH | 2 | $450.83 | $4,750.00 | $5,700.00 | $3,550.00 | $1,476.44 | $2,000.00 |
| 0063 | Temporary accessible pedestrian path (801-12641) | SYS | 50 | $48.21 | $125.00 | $65.00 | $145.00 | $47.70 | $44.37 |
| 0064 | Temporary pedestrian channelizer (801-12862) | LFT | 40 | $20.00 | $20.00 | $43.00 | $64.50 | $19.41 | $21.02 |
| 0065 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 88 | $24.00 | $30.00 | $27.00 | $24.00 | $44.00 | $44.00 |
| 0066 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 43 | $27.00 | $30.00 | $30.00 | $27.00 | $51.00 | $51.00 |
| 0067 | Traffic signal equipment, remove (805-01300) | EACH | 2 | $100.00 | $1,300.00 | $100.00 | $100.00 | $2,500.00 | $2,500.00 |
| 0068 | Miscellaneous equipment for traffic signals (805-01579) | LS | 1 | $700.00 | $2,500.00 | $780.00 | $700.00 | $9,750.00 | $9,750.00 |
| 0069 | Span, catenary, and tether, tighten (805-01824) | EACH | 3 | $1,700.00 | $1,000.00 | $1,870.00 | $1,700.00 | $4,000.00 | $4,000.00 |
| 0070 | Traffic signal head, realign (805-01828) | EACH | 2 | $200.00 | $600.00 | $200.00 | $200.00 | $900.00 | $900.00 |
| 0071 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $1,000.00 | $900.00 | $1,000.00 | $1,000.00 | $5,300.00 | $5,300.00 |
| 0072 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 2 | $575.00 | $1,000.00 | $650.00 | $575.00 | $1,400.00 | $1,400.00 |
| 0073 | Signal cable, loop detector lead-in, copper, 2C/14 gauge (805-02389) | LFT | 382 | $4.50 | $2.00 | $4.95 | $4.50 | $3.50 | $3.50 |
| 0074 | Controller, relocate and rewire (805-02437) | EACH | 1 | $1,500.00 | $750.00 | $1,700.00 | $1,500.00 | $3,125.00 | $3,125.00 |
| 0075 | Controller and cabinet, type P1 (805-02445) | EACH | 1 | $18,732 | $18,500 | $20,500 | $18,732 | $21,500 | $21,500 |
| 0076 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 2 | $1,800.00 | $2,500.00 | $1,980.00 | $1,800.00 | $1,950.00 | $1,950.00 |
| 0077 | Signal pole, pedestal, 12 FT (805-04133) | EACH | 2 | $1,200.00 | $1,300.00 | $1,320.00 | $1,200.00 | $2,150.00 | $2,150.00 |
| 0078 | Handhole, signal, type 2 (805-11744) | EACH | 2 | $1,900.00 | $1,500.00 | $2,100.00 | $1,900.00 | $2,250.00 | $2,250.00 |
| 0079 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 300 | $15.00 | $25.00 | $17.00 | $15.00 | $47.50 | $47.50 |
| 0080 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 383 | $40.00 | $26.00 | $45.00 | $40.00 | $50.00 | $50.00 |
| 0081 | Pedestrian push button, APS (805-11817) | EACH | 4 | $950.00 | $1,200.00 | $1,050.00 | $950.00 | $1,650.00 | $1,650.00 |
| 0082 | Traffic signal head, no. 3 (805-78205) | EACH | 2 | $950.00 | $1,100.00 | $1,050.00 | $950.00 | $1,500.00 | $1,500.00 |
| 0083 | Traffic signal head, no. 4 (805-78225) | EACH | 1 | $1,200.00 | $1,400.00 | $1,325.00 | $1,200.00 | $1,900.00 | $1,900.00 |
| 0084 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 2,088 | $1.00 | $1.00 | $1.00 | $1.00 | $1.25 | $1.25 |
| 0085 | Signal cable, control, copper, 3C/14 gauge (805-78480) | LFT | 762 | $4.00 | $4.00 | $4.00 | $4.00 | $3.50 | $3.50 |
| 0086 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 812 | $5.00 | $4.50 | $5.00 | $5.00 | $4.00 | $4.00 |
| 0087 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 30 | $6.00 | $5.00 | $7.00 | $6.00 | $4.50 | $4.50 |
| 0088 | Signal detector housing (805-78785) | EACH | 5 | $1,500.00 | $2,900.00 | $1,500.00 | $1,500.00 | $2,700.00 | $2,700.00 |
| 0089 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 635 | $17.00 | $10.00 | $19.00 | $17.00 | $14.25 | $14.25 |
| 0090 | Line, remove (808-06716) | LFT | 7,689 | $0.50 | $0.50 | $0.75 | $0.51 | $0.70 | $0.51 |
| 0091 | Transverse marking, multi-component, crosshatch line, yellow, 12 in. (808-10042) | LFT | 157 | $10.00 | $10.00 | $13.00 | $10.00 | $10.00 | $10.00 |
| 0092 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 717 | $2.50 | $2.50 | $1.85 | $1.50 | $1.50 | $5.00 |
| 0093 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 59 | $20.00 | $20.00 | $15.00 | $20.00 | $20.00 | $20.00 |
| 0094 | Transverse marking, multi-component, crosswalk line, white, 6 in. (808-10056) | LFT | 367 | $5.00 | $5.00 | $6.50 | $5.00 | $5.00 | $5.00 |
| 0095 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 2,069 | $2.50 | $2.50 | $1.85 | $1.50 | $1.50 | $5.00 |
| 0096 | Line, multi-component, dotted, yellow, 6 in. (808-10063) | LFT | 47 | $5.00 | $5.00 | $2.75 | $5.00 | $5.00 | $10.00 |
| 0097 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 3 | $200.00 | $200.00 | $225.00 | $250.00 | $250.00 | $250.00 |
| 0098 | Grooving for pavement markings (808-12032) | LFT | 2,833 | $2.00 | $2.00 | $1.70 | $1.70 | $1.54 | $1.50 |
| 0099 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 15 | $20.08 | $43.71 | $14.00 | $25.00 | $14.48 | $20.95 |
| 0100 | Snowplowable raised pavement marker (808-75998) | EACH | 26 | $75.00 | $75.00 | $210.00 | $43.47 | $85.00 | $43.47 |
| 0101 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 4 | $301.12 | $521.40 | $687.00 | $1,325.00 | $713.52 | $261.66 |
| 0102 | Video inspection for pipe (715-09064) | LFT | 255 | $12.75 | $13.00 | $6.50 | $12.75 | $6.00 | $12.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.