INDOT contract B-43654-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on October 8, 2025, Jefferson, Seymour. 4 bids received; low bid $1,266,295 by Force Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 78
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Force Construction Co Inc | $1,266,295 | Low |
| 2 | E & B Paving LLC | $1,380,900 | +9.0% |
| 3 | Milestone Contractors LP | $1,403,250 | +11% |
| 4 | Dave Omara Contractor Inc | $1,411,645 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Force Construction Co Inc | 2. E & B Paving LLC | 3. Milestone Contractors LP | 4. Dave Omara Contractor Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,680 | $20,000 | $10,800 | $14,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $63,000 | $69,000 | $70,000 | $70,582 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $15,210 | $41,000 | $18,500 | $42,349 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $33,410 | $72,000 | $103,257 | $85,000 |
| 0012 | Fence and posts, remove (202-96430) | LS | 1 | $1,559.00 | $3,000.00 | $2,400.00 | $2,400.00 |
| 0013 | Excavation, common (203-02000) | CYS | 213 | $46.00 | $140.00 | $98.00 | $42.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 20,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $7,783.00 | $12,000 | $2,300.00 | $24,500 |
| 0016 | Excavation, X (206-51215) | CYS | 30 | $173.00 | $280.00 | $235.00 | $300.00 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 90 | $97.00 | $200.00 | $105.00 | $250.00 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $38,610 | $30,000 | $34,000 | $28,000 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 54 | $43.00 | $90.00 | $46.00 | $40.00 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 876 | $32.00 | $60.00 | $48.00 | $48.00 |
| 0021 | Aggregate for end bent backfill (211-06467) | CYS | 50 | $92.00 | $220.00 | $195.00 | $110.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 4 | $186.00 | $120.00 | $130.00 | $110.00 |
| 0023 | Geotextile for pavement, type 2A (214-12238) | SYS | 60 | $8.20 | $2.00 | $11.00 | $6.00 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,054 | $5.30 | $2.00 | $4.00 | $6.00 |
| 0025 | Compacted aggregate, no. 5 (301-12232) | CYS | 10 | $105.00 | $200.00 | $215.00 | $110.00 |
| 0026 | Compacted aggregate, no. 53 (301-12234) | CYS | 11 | $86.00 | $300.00 | $165.00 | $105.00 |
| 0027 | Subbase for PCCP (302-06464) | CYS | 46 | $98.00 | $160.00 | $198.00 | $94.00 |
| 0028 | Compacted aggregate, no. 53 (303-01180) | TON | 19 | $49.00 | $360.00 | $150.00 | $52.00 |
| 0029 | Milling, transition (306-08043) | SYS | 288 | $15.00 | $20.00 | $19.00 | $18.00 |
| 0030 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 83 | $135.00 | $200.00 | $170.00 | $130.00 |
| 0031 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 117 | $135.00 | $170.00 | $141.00 | $130.00 |
| 0032 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 277 | $135.00 | $140.00 | $113.00 | $130.00 |
| 0033 | Joint adhesive (401-11526) | LFT | 540 | $0.50 | $0.01 | $1.30 | $0.50 |
| 0034 | Asphalt for tack coat (406-05521) | SYS | 1,729 | $0.50 | $0.01 | $0.75 | $0.50 |
| 0035 | Guardrail, thrie-beam, 6 FT 3 in. spacing (601-04150) | LFT | 25 | $56.00 | $54.00 | $54.00 | $56.00 |
| 0036 | Guardrail, thrie-beam, 6 FT 3 in. spacing , modified (601-04150) | LFT | 25 | $48.00 | $46.00 | $46.00 | $50.00 |
| 0037 | Guardrail end treatment, type I (601-06037) | EACH | 1 | $2,495.00 | $2,400.00 | $2,400.00 | $2,500.00 |
| 0038 | Guardrail transition, type TGS-1 (601-06374) | EACH | 1 | $1,559.00 | $1,500.00 | $1,500.00 | $1,600.00 |
| 0039 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 6.25 | $31.00 | $30.00 | $30.00 | $32.00 |
| 0040 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 177 | $163.00 | $280.00 | $275.00 | $340.00 |
| 0041 | HMA for approaches, type B (610-07487) | TON | 12 | $135.00 | $310.00 | $289.00 | $130.00 |
| 0042 | Right-of-way marker (615-06490) | EACH | 6 | $192.00 | $185.00 | $185.00 | $200.00 |
| 0043 | Monument, type B (615-06505) | EACH | 7 | $1,144.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 325 | $83.00 | $160.00 | $115.00 | $60.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 499 | $4.10 | $2.00 | $1.65 | $4.00 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $208.00 | $200.00 | $200.00 | $225.00 |
| 0047 | Mulched seeding, type R (621-06559) | SYS | 1,412 | $3.10 | $3.00 | $3.00 | $3.25 |
| 0048 | Sodding (621-06574) | SYS | 96 | $47.00 | $45.00 | $45.00 | $48.00 |
| 0049 | Computer system equipment (628-11976) | EACH | 2 | $832.00 | $1,000.00 | $700.00 | $1,000.00 |
| 0050 | Field office, type D (628-12683) | MOS | 8 | $4,171.00 | $2,800.00 | $5,250.00 | $2,200.00 |
| 0051 | Cored hole in rock, diameter 24 in. (701-02938) | LFT | 100 | $394.00 | $500.00 | $312.00 | $325.00 |
| 0052 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 144 | $128.00 | $220.00 | $248.00 | $200.00 |
| 0053 | Concrete, A, substructure (702-51005) | CYS | 23.30 | $3,330.00 | $2,000.00 | $2,460.00 | $3,520.00 |
| 0054 | Concrete, B, footings (702-51015) | CYS | 10.70 | $603.00 | $1,500.00 | $2,710.00 | $4,100.00 |
| 0055 | Concrete, C, substructure (702-92857) | CYS | 40.30 | $1,335.00 | $2,000.00 | $2,610.00 | $1,925.00 |
| 0056 | Reinforcing bars (703-06028) | LBS | 3,803 | $2.00 | $2.00 | $1.80 | $1.80 |
| 0057 | Reinforcing bars, epoxy coated (703-06029) | LBS | 42,159 | $1.50 | $2.00 | $2.00 | $1.80 |
| 0058 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 29 | $46.00 | $70.00 | $50.00 | $150.00 |
| 0059 | Concrete, C, superstructure (704-51002) | CYS | 83.60 | $1,931.00 | $2,000.00 | $2,300.00 | $1,850.00 |
| 0060 | Railing, steel type TS-1 (706-06344) | LFT | 200 | $91.00 | $87.50 | $87.50 | $90.00 |
| 0061 | Structural member, concrete, box beam, 21 in. X 36 in. (707-07776) | LFT | 422 | $334.00 | $380.00 | $395.00 | $412.00 |
| 0062 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $3,420.00 | $0.01 | $3,800.00 |
| 0063 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 46 | $84.00 | $70.00 | $58.00 | $80.00 |
| 0064 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 93 | $17.00 | $30.00 | $13.00 | $12.50 |
| 0065 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $860.00 | $1,000.00 | $910.00 | $2,000.00 |
| 0066 | Geotextile for underdrains, type 2A (718-12307) | SYS | 109 | $7.60 | $2.00 | $3.50 | $5.00 |
| 0067 | Longitudinal grooving (722-12732) | SYS | 470 | $6.80 | $10.00 | $9.00 | $13.00 |
| 0068 | Bearing assembly, elastomeric (726-92406) | EACH | 16 | $1,210.00 | $2,000.00 | $3,050.00 | $1,650.00 |
| 0069 | Road closure sign assembly (801-04308) | EACH | 6 | $343.00 | $329.61 | $175.00 | $350.00 |
| 0070 | Detour route marker assembly (801-06625) | EACH | 17 | $132.00 | $126.57 | $85.00 | $150.00 |
| 0071 | Construction sign, type A (801-06640) | EACH | 9 | $270.00 | $259.62 | $150.00 | $275.00 |
| 0072 | Maintaining traffic (801-06775) | LS | 1 | $177,704 | $7,395.44 | $7,500.00 | $66,344 |
| 0073 | Barricade, type III-A (801-07118) | LFT | 72 | $18.00 | $17.26 | $14.00 | $19.00 |
| 0074 | Barricade, type III-B (801-07119) | LFT | 72 | $18.00 | $17.26 | $15.00 | $19.00 |
| 0075 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 24 | $32.00 | $31.00 | $28.00 | $34.00 |
| 0076 | Sign, sheet, relocate (802-07060) | EACH | 2 | $338.00 | $325.00 | $125.00 | $350.00 |
| 0077 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 6 | $51.00 | $49.00 | $30.00 | $52.00 |
| 0078 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $330.00 | $317.00 | $200.00 | $350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.