INDOT contract B-46217-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on July 8, 2026, Bartholomew, Seymour. 8 bids received; low bid $1,153,939 by Dave O'Mara Contractor Inc.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 93
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dave O'Mara Contractor Inc | $1,153,939 | Low |
| 2 | Pontem Contractors Inc | $1,342,508 | +16% |
| 3 | E & B Paving LLC | $1,469,995 | +27% |
| 4 | Force Construction Co Inc | $1,487,677 | +29% |
| 5 | American Contracting & Services Inc | $1,496,990 | +30% |
| 6 | Milestone Contractors LP | $1,519,799 | +32% |
| 7 | Duncan Robertson Inc | $1,671,453 | +45% |
| 8 | Rieth-Riley Construction Co., Inc. | $1,692,408 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dave O'Mara Contractor Inc | 2. Pontem Contractors Inc | 3. E & B Paving LLC | 4. Force Construction Co Inc | 5. American Contracting & Services Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $7,500.00 | $15,000 | $12,000 | $9,252.00 | $10,000 | $25,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 3 | $600.00 | $802.04 | $1,200.00 | $1,550.00 | $1,000.00 | $2,850.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $57,697 | $67,100 | $73,499 | $74,000 | $74,849 | $76,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $11,539 | $13,400 | $14,699 | $4,241.00 | $14,970 | $15,000 |
| 0012 | Pavement removal (202-02240) | SYS | 256 | $42.00 | $32.47 | $72.00 | $33.00 | $50.00 | $90.00 |
| 0013 | Regulated asbestos containing materials, remove (202-03135) | SFT | 30 | $100.00 | $368.83 | $50.00 | $277.00 | $100.00 | $230.00 |
| 0014 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $26,000 | $92,498 | $162,500 | $35,320 | $72,000 | $66,000 |
| 0015 | Excavation, common (203-02000) | CYS | 120 | $35.00 | $55.72 | $65.00 | $66.00 | $150.00 | $60.00 |
| 0016 | Linear grading (203-08607) | LFT | 360 | $11.00 | $4.06 | $10.00 | $8.20 | $25.00 | $10.00 |
| 0017 | Pump around (205-11626) | EACH | 1 | $13,500 | $28,938 | $20,000 | $21,940 | $15,000 | $46,000 |
| 0018 | Stormwater management budget (205-12108) | DOL | 16,736 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $11,500 | $2,798.43 | $18,000 | $8,179.00 | $22,000 | $9,600.00 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 98 | $40.00 | $45.55 | $100.00 | $87.00 | $85.00 | $30.50 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 322 | $6.00 | $5.66 | $9.00 | $10.00 | $7.00 | $6.90 |
| 0022 | Compacted aggregate, no. 2 (301-12231) | CYS | 4 | $52.00 | $204.98 | $250.00 | $213.00 | $200.00 | $299.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 110 | $40.00 | $45.01 | $65.00 | $49.00 | $80.00 | $81.00 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,398 | $3.50 | $8.10 | $9.50 | $7.60 | $8.00 | $7.50 |
| 0025 | Milling, profile (306-11872) | SYS | 348 | $3.50 | $7.68 | $22.00 | $14.00 | $14.00 | $17.00 |
| 0026 | Lean concrete base, 9 in. (309-12695) | SYS | 208 | $105.00 | $132.50 | $60.00 | $92.00 | $130.00 | $122.00 |
| 0027 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 150 | $200.00 | $378.00 | $208.00 | $208.00 | $200.00 | $360.00 |
| 0028 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 16 | $200.00 | $924.00 | $366.00 | $208.00 | $200.00 | $880.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 46 | $200.00 | $372.75 | $356.00 | $208.00 | $200.00 | $355.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 1,680 | $1.00 | $1.89 | $0.10 | $1.00 | $1.00 | $1.80 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 2,102 | $0.32 | $0.32 | $0.10 | $0.35 | $0.32 | $0.30 |
| 0032 | Guardrail, remove (601-02241) | LFT | 504 | $1.00 | $4.20 | $4.00 | $4.20 | $4.00 | $4.00 |
| 0033 | Hand dig guardrail post holes (601-09238) | EACH | 10 | $350.00 | $157.50 | $150.00 | $156.00 | $150.00 | $150.00 |
| 0034 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 100 | $27.00 | $23.10 | $22.00 | $23.00 | $22.00 | $22.00 |
| 0035 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,750.00 | $3,465.00 | $3,300.00 | $3,431.00 | $3,300.00 | $3,300.00 |
| 0036 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,700.00 | $3,176.25 | $3,025.00 | $3,145.00 | $3,025.00 | $3,025.00 |
| 0037 | Barrier delineator (602-06729) | EACH | 8 | $150.00 | $137.02 | $65.00 | $23.00 | $50.00 | $125.00 |
| 0038 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 212 | $275.00 | $242.34 | $370.00 | $245.00 | $200.00 | $355.00 |
| 0039 | Mailbox assembly, single (611-06497) | EACH | 2 | $350.00 | $341.25 | $325.00 | $338.00 | $325.00 | $325.00 |
| 0040 | Benchmark post (615-06530) | EACH | 1 | $800.00 | $803.25 | $765.00 | $795.00 | $765.00 | $765.00 |
| 0041 | Grout for riprap (616-02281) | CYS | 58 | $330.00 | $322.33 | $320.00 | $289.00 | $350.00 | $375.00 |
| 0042 | Riprap, class 1 (616-05688) | TON | 369 | $96.00 | $151.97 | $145.00 | $117.00 | $135.00 | $128.00 |
| 0043 | Riprap, revetment (616-06405) | TON | 68 | $56.00 | $47.87 | $155.00 | $63.00 | $125.00 | $133.00 |
| 0044 | Geotextile for riprap, type 1A (616-12246) | SYS | 439 | $6.00 | $3.69 | $11.00 | $5.40 | $8.00 | $3.35 |
| 0045 | Fabric formed concrete revetment (616-12903) | SYS | 246 | $305.00 | $275.48 | $240.00 | $267.00 | $290.00 | $425.00 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,100.00 | $840.00 | $2,400.00 | $832.00 | $800.00 | $800.00 |
| 0047 | Erosion control blanket (621-02770) | SYS | 956 | $2.75 | $1.84 | $1.75 | $1.10 | $1.75 | $1.75 |
| 0048 | Mulching material (621-06565) | TON | 1 | $1,050.00 | $420.00 | $400.00 | $416.00 | $400.00 | $400.00 |
| 0049 | Water (621-06567) | KGAL | 1 | $1.00 | $0.11 | $0.10 | $0.10 | $0.10 | $0.10 |
| 0050 | Sodding (621-06574) | SYS | 16 | $220.00 | $357.61 | $255.00 | $265.00 | $255.00 | $255.00 |
| 0051 | Seed mixture, floodplain (621-12612) | LBS | 16 | $220.00 | $210.00 | $200.00 | $208.00 | $200.00 | $200.00 |
| 0052 | Sign, 'DO not spray' (621-52448) | EACH | 2 | $120.00 | $99.75 | $95.00 | $99.00 | $95.00 | $95.00 |
| 0053 | Computer system equipment (628-11976) | EACH | 1 | $350.00 | $1,093.78 | $250.00 | $832.00 | $500.00 | $1,500.00 |
| 0054 | Field office, type D (628-12683) | MOS | 6 | $1,800.00 | $4,012.83 | $5,000.00 | $4,158.00 | $9,000.00 | $4,165.00 |
| 0055 | Field drilled hole in concrete (702-51863) | EACH | 472 | $20.00 | $18.37 | $24.00 | $31.00 | $30.00 | $21.00 |
| 0056 | Reinforcing bars, epoxy coated (703-06029) | LBS | 29,576 | $1.60 | $1.66 | $1.70 | $1.80 | $2.00 | $2.10 |
| 0057 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 96 | $50.00 | $52.98 | $42.00 | $54.00 | $50.00 | $55.00 |
| 0058 | Inertial profiler, bridge encounter (704-000080) | LS | 1 | $1,100.00 | $5,208.00 | $4,850.00 | $5,156.00 | $10,000 | $5,050.00 |
| 0059 | Corrective grinding, bridge encounter (704-000082) | LS | 1 | $7,000.00 | $30,765 | $6,650.00 | $30,150 | $15,000 | $6,000.00 |
| 0060 | Concrete, C, superstructure (704-51002) | CYS | 29.40 | $1,375.00 | $2,568.40 | $2,500.00 | $2,637.00 | $5,000.00 | $2,600.00 |
| 0061 | Concrete bridge railing transition, type TPF-1 , modified (706-06351) | EACH | 4 | $8,000.00 | $4,861.56 | $6,500.00 | $6,394.00 | $6,350.00 | $7,550.00 |
| 0062 | Railing, concrete type PF-1 (706-09962) | LFT | 199 | $175.00 | $136.13 | $150.00 | $160.00 | $150.00 | $200.00 |
| 0063 | Railing, steel type PF-1 (706-11404) | LFT | 217 | $95.00 | $90.30 | $86.00 | $89.00 | $86.00 | $86.00 |
| 0064 | Surface seal (709-51821) | LS | 1 | $3,150.00 | $3,150.00 | $3,151.41 | $3,276.00 | $5,000.00 | $3,151.41 |
| 0065 | Patching concrete structures (710-09158) | SFT | 50 | $100.00 | $220.41 | $100.00 | $149.00 | $10.00 | $100.00 |
| 0066 | Bridge deck, remove concrete overlay and surface (722-000183) | SYS | 448 | $26.00 | $14.58 | $36.00 | $26.00 | $30.00 | $26.00 |
| 0067 | Hydrodemolition (722-01066) | SYS | 448 | $140.00 | $183.01 | $180.00 | $176.00 | $200.00 | $225.00 |
| 0068 | Bridge deck overlay budget (722-12380) | DOL | 53,651 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0069 | Longitudinal grooving (722-12732) | SYS | 696 | $3.50 | $18.19 | $12.00 | $12.00 | $20.00 | $11.25 |
| 0070 | Bridge deck patching, full depth (722-51401) | SFT | 150 | $22.00 | $69.75 | $50.00 | $86.00 | $130.00 | $150.00 |
| 0071 | Bridge deck overlay, latex modified (722-51842) | SYS | 492 | $195.00 | $157.74 | $210.00 | $219.00 | $235.00 | $230.00 |
| 0072 | Overlay dam (722-51874) | SFT | 90 | $20.00 | $61.88 | $100.00 | $75.00 | $85.00 | $84.00 |
| 0073 | Construction sign, type D (801-03291) | EACH | 6 | $150.00 | $284.55 | $200.00 | $282.00 | $271.00 | $200.00 |
| 0074 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 8,473 | $2.50 | $2.02 | $1.80 | $2.20 | $1.92 | $1.80 |
| 0075 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 24 | $12.00 | $12.20 | $10.55 | $12.00 | $11.62 | $10.55 |
| 0076 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 480 | $2.50 | $3.02 | $1.90 | $4.70 | $2.88 | $1.90 |
| 0077 | Construction sign, type A (801-06640) | EACH | 22 | $250.00 | $226.80 | $190.00 | $225.00 | $216.00 | $190.00 |
| 0078 | Construction sign, type B (801-06645) | EACH | 10 | $250.00 | $107.10 | $100.00 | $106.00 | $102.00 | $100.00 |
| 0079 | Maintaining traffic (801-06775) | LS | 1 | $42,689 | $15,258 | $48,820 | $228,000 | $50,000 | $18,048 |
| 0080 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $8,000.00 | $6,142.50 | $5,850.00 | $6,081.00 | $9,500.00 | $5,850.00 |
| 0081 | Barricade, type III-B (801-07119) | LFT | 120 | $18.00 | $16.74 | $16.00 | $17.00 | $15.94 | $16.00 |
| 0082 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 500 | $72.00 | $63.88 | $50.00 | $62.00 | $55.00 | $60.00 |
| 0083 | Portable changeable message sign (801-11642) | EACH | 2 | $4,500.00 | $3,599.40 | $3,500.00 | $3,564.00 | $3,428.00 | $3,500.00 |
| 0084 | Truck mounted attenuator (801-12042) | DAY | 22 | $25.00 | $490.27 | $300.00 | $982.00 | $188.00 | $1,430.00 |
| 0085 | Portable signal (801-12081) | LS | 1 | $19,000 | $27,472 | $30,000 | $25,340 | $25,000 | $21,800 |
| 0086 | Driveway assistance device (801-12482) | EACH | 6 | $7,000.00 | $2,511.60 | $6,000.00 | $2,760.00 | $2,500.00 | $1,250.00 |
| 0087 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $350.00 | $938.70 | $800.00 | $929.00 | $894.00 | $800.00 |
| 0088 | Line, remove (808-06716) | LFT | 480 | $2.00 | $1.28 | $1.00 | $1.30 | $1.22 | $1.00 |
| 0089 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 922 | $5.50 | $1.24 | $1.00 | $1.20 | $1.18 | $1.00 |
| 0090 | Grooving for pavement markings (808-12032) | LFT | 946 | $4.00 | $0.83 | $1.00 | $0.80 | $0.79 | $1.00 |
| 0091 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 340 | $5.50 | $1.24 | $1.50 | $1.20 | $1.18 | $1.50 |
| 0092 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 18 | $16.00 | $25.78 | $50.00 | $20.00 | $19.01 | $200.00 |
| 0093 | Snowplowable raised pavement marker (808-75998) | EACH | 12 | $85.00 | $128.10 | $200.00 | $127.00 | $122.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.