INDOT contract B-45571-A bid tabulation
BRIDGE DECK OVERLAY AND PREVENTIVE MAINTENANCE. Let by Indiana DOT on March 11, 2026, Crawford, Lawrence, Vincennes. 5 bids received; low bid $983,500 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 89
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $983,500 | Low |
| 2 | Ragle, Inc. | $1,036,562 | +5.0% |
| 3 | American Contracting & Services Inc | $1,055,510 | +7.0% |
| 4 | Milestone Contractors LP | $1,076,221 | +9.0% |
| 5 | Force Construction Co Inc | $1,216,550 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Ragle, Inc. | 3. American Contracting & Services Inc | 4. Milestone Contractors LP | 5. Force Construction Co Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $35,000 | $16,000 | $19,000 | $22,000 | $15,600 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $49,175 | $51,500 | $52,775 | $53,750 | $60,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $16,155 | $20,000 | $21,110 | $21,500 | $17,780 |
| 0012 | Pavement removal (202-02240) | SYS | 451 | $55.00 | $43.25 | $45.00 | $75.00 | $30.00 |
| 0013 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $74,749 | $73,500 | $60,000 | $65,000 | $73,730 |
| 0014 | Bridge railing, remove (202-62420) | LFT | 104 | $30.00 | $5.00 | $70.00 | $90.00 | $72.00 |
| 0015 | Guardrail end treatment, remove (202-93741) | EACH | 4 | $225.00 | $225.00 | $225.00 | $225.00 | $234.00 |
| 0016 | Excavation, common (203-02000) | CYS | 138 | $86.00 | $50.00 | $120.00 | $75.00 | $73.00 |
| 0017 | Linear grading (203-08607) | LFT | 856 | $10.00 | $6.00 | $20.00 | $4.00 | $9.40 |
| 0018 | Stormwater management budget (205-12108) | DOL | 15,382 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $12,500 | $5,000.00 | $11,000 | $5,800.00 | $6,759.00 |
| 0020 | Excavation, foundation, unclassified (206-51230) | CYS | 30 | $130.00 | $52.50 | $200.00 | $105.00 | $139.00 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 52 | $88.00 | $135.00 | $90.00 | $110.00 | $102.00 |
| 0022 | Aggregate for end bent backfill (211-06467) | CYS | 30 | $240.00 | $155.00 | $175.00 | $350.00 | $166.00 |
| 0023 | Structure backfill, type 1 (211-09264) | CYS | 36 | $165.00 | $50.00 | $175.00 | $130.00 | $107.00 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 493 | $2.72 | $4.00 | $8.00 | $3.90 | $5.80 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 68 | $120.00 | $135.00 | $160.00 | $190.00 | $118.00 |
| 0026 | Milling, transition (306-08043) | SYS | 700 | $9.00 | $3.25 | $10.00 | $5.25 | $8.20 |
| 0027 | Lean concrete base, 9 in. (309-12695) | SYS | 172 | $74.21 | $120.00 | $170.00 | $102.00 | $97.00 |
| 0028 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 62 | $420.00 | $428.00 | $225.00 | $390.00 | $234.00 |
| 0029 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 7 | $453.00 | $460.00 | $225.00 | $1,100.00 | $234.00 |
| 0030 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 16 | $420.00 | $428.00 | $225.00 | $525.00 | $234.00 |
| 0031 | Joint adhesive (401-11526) | LFT | 510 | $1.75 | $2.00 | $0.50 | $1.20 | $0.50 |
| 0032 | Asphalt for tack coat (406-05521) | SYS | 752 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 0033 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 | $3,068.00 |
| 0034 | Guardrail terminal system, W-beam, curved, type 4 (601-01740) | EACH | 1 | $2,650.00 | $2,650.00 | $2,650.00 | $2,650.00 | $2,756.00 |
| 0035 | Guardrail, remove (601-02241) | LFT | 1,166 | $6.00 | $6.00 | $6.00 | $6.00 | $6.20 |
| 0036 | Hand dig guardrail post holes (601-09238) | EACH | 8 | $100.00 | $100.00 | $100.00 | $100.00 | $104.00 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 375 | $23.00 | $23.00 | $23.00 | $23.00 | $24.00 |
| 0038 | Guardrail, MGS, long span, type 1 (601-12287) | EACH | 2 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,300.00 |
| 0039 | Guardrail transition, MGS without curb (601-12292) | EACH | 7 | $3,385.00 | $3,385.00 | $3,385.00 | $3,385.00 | $3,520.00 |
| 0040 | Guardrail end treatment, type OS (601-94689) | EACH | 7 | $2,385.00 | $2,385.00 | $2,385.00 | $2,385.00 | $2,480.00 |
| 0041 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 44 | $23.00 | $23.00 | $23.00 | $23.00 | $24.00 |
| 0042 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 440.20 | $225.00 | $250.00 | $270.00 | $210.00 | $225.00 |
| 0043 | Riprap, revetment (616-06405) | TON | 64 | $90.00 | $91.25 | $125.00 | $115.00 | $95.00 |
| 0044 | Geotextile for riprap, type 1A (616-12246) | SYS | 89 | $65.00 | $8.00 | $12.00 | $9.75 | $9.70 |
| 0045 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $800.00 | $800.00 | $800.00 | $800.00 | $936.00 |
| 0046 | Mulched seeding, type R (621-06559) | SYS | 1,272 | $3.50 | $5.50 | $3.50 | $5.50 | $1.00 |
| 0047 | Sodding (621-06574) | SYS | 65 | $55.00 | $65.00 | $55.00 | $62.00 | $104.00 |
| 0048 | Computer system equipment (628-11976) | EACH | 1 | $500.00 | $750.00 | $1,000.00 | $1,250.00 | $832.00 |
| 0049 | Field office, type D (628-12683) | MOS | 12 | $2,800.00 | $3,200.00 | $4,600.00 | $4,250.00 | $4,160.00 |
| 0050 | Field drilled hole in concrete (702-51863) | EACH | 106 | $32.00 | $30.00 | $30.00 | $43.00 | $24.00 |
| 0051 | Concrete, C, substructure (702-92857) | CYS | 2.40 | $3,200.00 | $3,850.00 | $2,900.00 | $4,020.00 | $4,704.00 |
| 0052 | Reinforcing bars, epoxy coated (703-06029) | LBS | 32,993 | $2.50 | $2.25 | $1.90 | $2.10 | $1.70 |
| 0053 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 38 | $55.00 | $55.00 | $50.00 | $44.00 | $55.00 |
| 0054 | Concrete, C, superstructure (704-51002) | CYS | 23.70 | $2,200.00 | $2,175.00 | $3,000.00 | $3,550.00 | $3,423.00 |
| 0055 | Railing, concrete type FC (706-11600) | CYS | 2 | $4,500.00 | $3,100.00 | $2,000.00 | $7,950.00 | $6,295.00 |
| 0056 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 8 | $5,500.00 | $4,000.00 | $4,000.00 | $7,200.00 | $4,160.00 |
| 0057 | Fiber wrap concrete casing system (709-04647) | LS | 1 | $7,475.00 | $2,700.00 | $2,700.00 | $7,475.00 | $7,773.00 |
| 0058 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $3,584.20 | $6,467.00 | $10,000 | $3,584.20 | $3,727.00 |
| 0059 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $5,771.06 | $7,840.00 | $12,000 | $5,771.06 | $6,001.00 |
| 0060 | Patching concrete structures (710-09158) | SFT | 5 | $50.00 | $210.00 | $210.00 | $50.00 | $216.00 |
| 0061 | Jacking and supporting beams , bridge no. 2 (711-51877) | LS | 1 | $10,500 | $25,000 | $15,000 | $8,000.00 | $35,500 |
| 0062 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 20 | $170.00 | $32.50 | $100.00 | $98.00 | $69.00 |
| 0063 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 140 | $20.00 | $18.00 | $35.00 | $34.00 | $20.00 |
| 0064 | Geotextile for underdrains, type 2B (718-12308) | SYS | 72 | $9.50 | $5.50 | $11.00 | $13.00 | $11.00 |
| 0065 | Bridge deck overlay, rigid (722-000134) | SYS | 620 | $95.00 | $135.00 | $145.00 | $120.00 | $92.00 |
| 0066 | Hydrodemolition (722-01066) | SYS | 620 | $80.00 | $100.00 | $120.00 | $102.00 | $81.00 |
| 0067 | Bridge deck overlay budget (722-12380) | DOL | 6,165 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0068 | Bridge deck, remove concrete surface (722-12464) | SYS | 620 | $10.50 | $10.00 | $15.00 | $12.00 | $8.90 |
| 0069 | Longitudinal grooving (722-12732) | SYS | 1,077 | $6.00 | $9.50 | $7.00 | $6.00 | $4.50 |
| 0070 | Bridge deck patching, full depth (722-51401) | SFT | 112 | $65.00 | $85.00 | $80.00 | $50.00 | $85.00 |
| 0071 | Bridge deck patching, partial depth (722-51852) | SFT | 82 | $45.00 | $45.00 | $75.00 | $50.00 | $21.00 |
| 0072 | Bearing assembly, reset (726-11773) | EACH | 1 | $550.00 | $1,500.00 | $1,100.00 | $850.00 | $5,904.00 |
| 0073 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 1 | $20.00 | $55.00 | $55.00 | $20.00 | $21.00 |
| 0074 | Epoxy injection, crack preparation (727-90308) | LFT | 1 | $100.00 | $100.00 | $100.00 | $100.00 | $104.00 |
| 0075 | Epoxy injection, furnishing equipment , bridge no. 2 (727-93560) | LS | 1 | $1,500.00 | $965.00 | $965.00 | $1,500.00 | $1,560.00 |
| 0076 | Road closure sign assembly (801-04308) | EACH | 16 | $245.00 | $200.00 | $200.00 | $274.00 | $338.00 |
| 0077 | Detour route marker assembly (801-06625) | EACH | 72 | $98.00 | $75.00 | $75.00 | $196.00 | $140.00 |
| 0078 | Construction sign, type A (801-06640) | EACH | 26 | $165.00 | $125.00 | $125.00 | $205.00 | $198.00 |
| 0079 | Construction sign, type B (801-06645) | EACH | 1 | $98.00 | $115.00 | $115.00 | $88.00 | $114.00 |
| 0080 | Maintaining traffic (801-06775) | LS | 1 | $23,500 | $70,000 | $5,000.00 | $18,926 | $248,002 |
| 0081 | Barricade, type III-A (801-07118) | LFT | 144 | $10.00 | $16.00 | $16.00 | $13.00 | $18.00 |
| 0082 | Barricade, type III-B (801-07119) | LFT | 192 | $10.00 | $16.00 | $17.00 | $15.00 | $18.00 |
| 0083 | Reference post (802-04893) | EACH | 1 | $225.00 | $225.00 | $225.00 | $225.00 | $234.00 |
| 0084 | Sign, ground mounted, reset (802-91122) | EACH | 1 | $350.00 | $350.00 | $350.00 | $350.00 | $364.00 |
| 0085 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 90 | $9.95 | $1.10 | $1.10 | $6.00 | $2.10 |
| 0086 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,041 | $0.70 | $1.10 | $1.10 | $2.42 | $1.00 |
| 0087 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 684 | $0.70 | $1.10 | $1.10 | $3.62 | $1.00 |
| 0088 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 12 | $65.00 | $16.50 | $50.00 | $80.00 | $72.00 |
| 0089 | Snowplowable raised pavement marker (808-75998) | EACH | 10 | $195.00 | $125.00 | $75.00 | $200.00 | $104.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.