INDOT contract B-44483-A bid tabulation

BRIDGE REPLACEMENT AND THIN DECK OVERLAY. Let by Indiana DOT on October 7, 2026, Rush, Shelby, Greenfield. 6 bids received; low bid $1,179,781 by Duncan Robertson Inc.

Owner
Indiana DOT
Letting
07 OCT 2026
Pay items
85
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duncan Robertson Inc$1,179,781Low
2Milestone Contractors LP$1,281,800+9.0%
3Force Construction Co Inc$1,427,446+21%
4Dave O'Mara Contractor Inc$1,471,000+25%
5American Contracting & Services Inc$1,526,315+29%
6Paul H Rohe Company Inc$1,550,073+31%
INDOT contract B-44483-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duncan Robertson Inc2. Milestone Contractors LP3. Force Construction Co Inc4. Dave O'Mara Contractor Inc5. American Contracting & Services Inc6. Paul H Rohe Company Inc
0001Construction engineering (105-06845)LS1$10,000$14,000$9,833.00$13,500$15,000$12,200
0002Inspection hole, deeper than 3 FT (107-09358)EACH4$1,500.00$855.00$898.00$800.00$950.00$1,130.00
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$55,000$64,000$71,000$73,550$76,316$104,140
0012Clearing right-of-way (201-52370)LS1$20,000$35,700$22,660$29,420$30,526$38,940
0013Regulated asbestos containing materials, remove (202-03135)SFT6$10.00$250.00$1,030.00$9,000.00$250.00$1,720.00
0014Regulated materials, dispose, type C (202-05547)DRUM1$250.00$1,500.00$515.00$100.00$2,500.00$900.00
0015Regulated materials, transport, type C (202-05557)DRUM1$250.00$1,500.00$1,030.00$100.00$2,500.00$900.00
0016Present structure, remove, structure no. 1 (202-51330)LS1$100,000$60,391$51,730$100.00$75,000$85,430
0017Pipe, remove (202-96133)LFT31$20.00$40.00$71.00$115.00$65.00$280.00
0018Excavation, common (203-02000)CYS535$40.00$55.00$58.00$44.00$175.00$126.00
0019Pump around (205-11626)EACH1$5,000.00$31,500$12,980$19,000$25,000$15,000
0020Stormwater management budget (205-12108)DOL14,214$1.00$1.00$1.00$1.00$1.00$1.00
0021Stormwater management implementation (205-12616)LS1$15,000$7,500.00$8,456.00$32,500$15,000$3,000.00
0022Excavation, foundation, unclassified (206-51230)CYS243$40.00$64.00$43.00$60.00$70.00$80.00
0023Subgrade treatment, type II (207-08264)SYS78$20.00$39.00$41.00$22.50$35.00$92.00
0024Subgrade treatment, type IC (207-09935)SYS1,416$30.00$50.00$44.00$42.00$44.00$50.00
0025Structure backfill, type 2 (211-09265)CYS9$125.00$82.00$138.00$128.00$120.00$220.00
0026Flowable backfill, removable (213-09270)CYS82$300.00$220.00$280.00$400.00$250.00$300.00
0027Geogrid, type IB (214-11796)SYS1,416$3.00$4.00$2.80$5.00$4.00$3.50
0028Geotextile for pavement, type 2B (214-12239)SYS193$4.00$9.50$8.10$5.00$13.00$5.70
0029Subbase for PCCP (302-06464)CYS49$150.00$180.00$157.00$120.00$145.00$210.00
0030Compacted aggregate, no. 53 (303-01180)TON318$55.00$66.00$58.00$42.00$45.00$62.00
0031Milling, asphalt, 1 1/2 in. (306-08034)SYS329$18.00$41.00$19.00$10.91$20.00$19.00
0032QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON134$137.00$195.00$129.00$125.00$125.00$205.00
0033QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON180$137.00$125.00$129.00$125.00$125.00$150.00
0034QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON573$137.00$109.00$129.00$125.00$125.00$132.00
0035Joint adhesive (401-11526)LFT1,989$0.11$2.00$0.10$0.10$0.10$1.25
0036Asphalt for tack coat (406-05521)SYS4,290$0.11$0.30$0.10$0.10$0.10$0.45
0037Terminal joint, retrofit polymer modified asphalt (503-12480)SFT173$95.00$85.95$89.00$86.00$225.00$85.95
0038Guardrail transition, type TGB (601-01522)EACH1$3,540.00$3,220.00$3,315.00$3,500.00$3,220.00$3,220.00
0039Guardrail terminal system, W-beam, curved, type 1 (601-01700)EACH1$3,190.00$2,900.00$2,986.00$3,000.00$2,900.00$2,900.00
0040Guardrail, remove (601-02241)LFT561$2.20$2.00$2.10$2.00$2.00$2.00
0041Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT88$25.00$23.00$24.00$24.00$23.00$23.00
0042Guardrail transition, MGS without curb (601-12292)EACH3$3,410.00$3,100.00$3,192.00$3,400.00$3,100.00$3,100.00
0043Guardrail end treatment, type OS (601-94689)EACH3$3,190.00$2,900.00$2,986.00$3,200.00$2,900.00$2,900.00
0044Barrier delineator (602-06729)EACH4$30.00$29.00$60.00$25.00$100.00$29.00
0045Reinforced concrete bridge approach, 12 in. (609-06259)SYS193$255.00$282.00$214.00$275.00$225.00$258.00
0046HMA for approaches, type B (610-07487)TON22$137.00$110.00$129.00$125.00$125.00$300.00
0047Mailbox assembly, reset, double (611-08233)EACH1$650.00$590.00$607.00$600.00$590.00$590.00
0048Right-of-way marker (615-06490)EACH12$192.00$175.00$180.00$185.00$175.00$175.00
0049Monument, type B (615-06505)EACH2$1,094.00$994.00$1,023.00$1,000.00$994.00$994.00
0050Benchmark post (615-06530)EACH1$394.00$500.00$772.00$650.00$625.00$1,020.00
0051Riprap, class 1 (616-05688)TON306$65.00$112.00$100.00$120.00$120.00$90.00
0052Riprap, revetment (616-06405)TON115$60.00$118.00$85.00$100.00$115.00$135.00
0053Geotextile for riprap, type 1A (616-12246)SYS598$3.50$3.50$4.20$5.00$7.00$4.50
0054Mobilization and demobilization for seeding (621-01004)EACH2$1,017.00$900.00$927.00$1,000.00$900.00$500.00
0055Mulched seeding, type R (621-06559)SYS1,482$3.25$2.11$2.20$3.50$2.11$5.00
0056Sodding (621-06574)SYS11$192.00$297.00$306.00$180.00$297.00$275.00
0057Field office, type C (628-09403)MOS9$2,750.00$4,400.00$3,327.00$2,200.00$4,500.00$3,850.00
0058Dynamic pile load test (701-06011)EACH2$2,750.00$3,400.00$3,258.00$4,200.00$6,000.00$1,250.00
0059Test pile, dynamic, production (701-09557)LFT124$72.00$63.50$103.00$160.00$135.00$245.00
0060Test pile, dynamic, restrike (701-09559)EACH2$2,000.00$3,400.00$3,258.00$3,200.00$6,000.00$3,875.00
0061Pile, steel pipe, 0.250 in., diameter 14 in. (701-09662)LFT728$72.00$116.75$103.00$128.00$125.00$155.00
0062Conical pile tip, 14 in. (701-09679)EACH16$1,000.00$480.00$416.00$525.00$1,000.00$870.00
0063Reinforcing bars, epoxy coated (703-06029)LBS58,477$1.50$1.80$1.50$1.60$1.85$1.65
0064Threaded tie bar assembly, epoxy coated (703-97936)EACH43$60.00$53.00$55.00$60.00$60.00$190.00
0065Concrete, C, superstructure (704-51002)CYS179.20$1,250.00$1,260.00$1,344.00$1,700.00$1,600.00$1,685.00
0066Railing, concrete type FC (706-11600)CYS4.70$1,750.00$1,877.00$1,933.00$4,500.00$2,600.00$1,877.00
0067Concrete bridge railing transition, type TFC (706-11620)EACH4$2,250.00$2,100.00$2,162.00$6,500.00$3,000.00$2,100.00
0068Surface seal , structure no. 1 (709-51821)LS1$2,800.00$0.01$1.00$2,900.00$1,100.00$2,677.76
0069Surface seal , structure no. 2 (709-51821)LS1$2,800.00$2,586.59$2,663.00$2,900.00$2,900.00$2,586.59
0070Safety metal end section, 4:1, diameter 24 in. (715-03476)EACH1$3,750.00$1,800.00$2,305.00$2,600.00$3,500.00$4,725.00
0071Pipe, type 3, circular, diameter 24 in. (715-05173)LFT58$110.00$74.00$119.00$130.00$120.00$172.00
0072Pipe end section, diameter 24 in. (715-46020)EACH1$800.00$1,125.00$3,159.00$1,500.00$1,130.00$5,085.00
0073Longitudinal grooving (722-12732)SYS326$12.00$11.75$10.00$8.00$15.00$8.44
0074Bridge deck patching, partial depth (722-51852)SFT329$2.75$2.50$2.60$2.75$40.00$2.50
0075Warranted polymer overlay, bridge deck (738-12855)SYS731$54.00$42.90$44.00$52.00$75.00$42.90
0076Road closure sign assembly (801-04308)EACH9$165.00$255.00$263.00$500.00$255.00$150.00
0077Detour route marker assembly (801-06625)EACH54$94.00$143.00$147.00$300.00$143.00$85.00
0078Construction sign, type A (801-06640)EACH22$192.00$189.00$195.00$350.00$189.00$175.00
0079Maintaining traffic (801-06775)LS1$30,000$9,000.00$237,000$80,143$20,000$19,540
0080Barricade, type III-A (801-07118)LFT96$16.50$15.21$16.00$26.00$16.00$15.00
0081Barricade, type III-B (801-07119)LFT96$16.50$15.21$16.00$26.00$16.00$15.00
0082Reference post (802-04893)EACH1$500.00$358.00$369.00$375.00$358.00$358.00
0083Line, multi-component, solid, white, 6 in. (808-10049)LFT1,286$2.20$0.88$0.90$5.00$0.88$2.00
0084Line, multi-component, solid, yellow, 6 in. (808-10057)LFT416$2.20$0.88$0.90$5.00$0.88$2.00
0085Line, multi-component, broken, yellow, 6 in. (808-12841)LFT109$2.20$1.03$1.10$5.00$1.03$2.00
INDOT contract B-44483-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy