INDOT contract R-44820-A bid tabulation
SMALL STRUCTURE REPLACEMENT, MAINTENANCE AND REPAIR. Let by Indiana DOT on April 8, 2026, Greene, Vincennes. 5 bids received; low bid $1,152,689 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 08 APR 2026
- Pay items
- 88
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $1,152,689 | Low |
| 2 | CLR Inc | $1,244,392 | +8.0% |
| 3 | Force Construction Co Inc | $1,284,120 | +11% |
| 4 | Milestone Contractors LP | $1,425,838 | +24% |
| 5 | Morphey Construction Inc. | $1,598,000 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. CLR Inc | 3. Force Construction Co Inc | 4. Milestone Contractors LP | 5. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,894 | $43,000 | $12,890 | $13,000 | $30,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $56,000 | $62,350 | $64,000 | $72,000 | $79,900 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $11,000 | $12,470 | $22,430 | $22,850 | $7,900.00 |
| 0013 | Paved side ditch, remove (202-02272) | LFT | 15 | $46.00 | $55.00 | $71.00 | $105.00 | $130.00 |
| 0014 | Pipe abandon and grout fill (202-02637) | LFT | 30 | $134.00 | $250.00 | $70.00 | $115.00 | $360.00 |
| 0015 | Catch basin, remove (202-02928) | EACH | 1 | $625.00 | $1,750.00 | $829.00 | $925.00 | $800.00 |
| 0016 | Present structure, remove portions, structure no. CV 231-028- 109.22 (202-51328) | LS | 1 | $17,928 | $3,500.00 | $15,700 | $9,800.00 | $14,000 |
| 0017 | Present structure, remove, structure no. CV 054-028-26.40 (202-51330) | LS | 1 | $14,935 | $45,000 | $19,450 | $37,000 | $17,500 |
| 0018 | Inlet, remove (202-91385) | EACH | 2 | $606.00 | $1,125.00 | $1,153.00 | $925.00 | $800.00 |
| 0019 | Pipe, remove (202-96133) | LFT | 179 | $88.00 | $30.00 | $49.00 | $60.00 | $35.00 |
| 0020 | Concrete, remove (202-99080) | CYS | 2 | $354.00 | $1,750.00 | $1,479.00 | $650.00 | $600.00 |
| 0021 | Excavation, common (203-02000) | CYS | 626 | $105.00 | $91.00 | $54.00 | $50.00 | $100.00 |
| 0022 | Borrow (203-02070) | CYS | 61 | $62.00 | $12.75 | $105.00 | $200.00 | $100.00 |
| 0023 | Pump around (205-11626) | EACH | 1 | $13,500 | $39,500 | $20,680 | $5,000.00 | $17,500 |
| 0024 | Stormwater management budget (205-12108) | DOL | 19,510 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $12,400 | $1,000.00 | $8,290.00 | $13,000 | $8,000.00 |
| 0026 | Subgrade treatment, type IC (207-09935) | SYS | 725 | $56.00 | $52.00 | $43.00 | $50.00 | $50.00 |
| 0027 | B borrow (211-02050) | CYS | 55 | $167.00 | $63.00 | $82.00 | $200.00 | $120.00 |
| 0028 | Structure backfill, type 2 (211-09265) | CYS | 174 | $119.00 | $85.00 | $87.00 | $110.00 | $100.00 |
| 0029 | Structure backfill, type 5 (211-09268) | CYS | 89 | $275.00 | $325.00 | $382.00 | $250.00 | $200.00 |
| 0030 | Geotextile for pavement, type 2B (214-12239) | SYS | 725 | $3.00 | $3.75 | $6.40 | $5.00 | $5.00 |
| 0031 | Compacted aggregate, no. 8 (301-12233) | CYS | 133 | $163.00 | $185.00 | $82.00 | $300.00 | $100.00 |
| 0032 | Compacted aggregate, no. 53 (301-12234) | CYS | 3 | $408.00 | $550.00 | $428.00 | $700.00 | $800.00 |
| 0033 | Compacted aggregate, no. 53 (303-01180) | TON | 9 | $144.00 | $175.00 | $99.00 | $200.00 | $300.00 |
| 0034 | HMA patching, full depth, type D (304-12627) | TON | 32 | $851.00 | $1,130.00 | $1,228.00 | $900.00 | $1,365.00 |
| 0035 | Milling, transition (306-08043) | SYS | 426 | $31.00 | $31.00 | $16.00 | $40.00 | $20.00 |
| 0036 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 104 | $221.00 | $253.00 | $233.00 | $300.00 | $226.00 |
| 0037 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 93 | $238.00 | $273.00 | $251.00 | $275.00 | $244.00 |
| 0038 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 303 | $188.00 | $216.00 | $199.00 | $250.00 | $193.00 |
| 0039 | Joint adhesive (401-11526) | LFT | 1,183 | $1.00 | $1.00 | $1.00 | $3.00 | $1.00 |
| 0040 | Asphalt for tack coat (406-05521) | SYS | 1,914 | $3.00 | $3.00 | $3.10 | $1.25 | $3.00 |
| 0041 | Guardrail, reset (601-06035) | LFT | 93 | $26.00 | $29.00 | $27.00 | $26.00 | $26.00 |
| 0042 | Curb and gutter, concrete (605-06140) | LFT | 240 | $87.00 | $44.00 | $56.00 | $70.00 | $77.00 |
| 0043 | Right-of-way marker (615-06490) | EACH | 6 | $200.00 | $160.00 | $206.00 | $200.00 | $200.00 |
| 0044 | Monument, type B (615-06505) | EACH | 2 | $1,175.00 | $940.00 | $1,210.00 | $1,175.00 | $1,175.00 |
| 0045 | Riprap, class 1 (616-05688) | TON | 48 | $160.00 | $120.00 | $82.00 | $200.00 | $162.64 |
| 0046 | Riprap, revetment (616-06405) | TON | 458 | $97.00 | $80.00 | $41.00 | $110.00 | $150.00 |
| 0047 | Geotextile for riprap, type 1A (616-12246) | SYS | 674 | $1.00 | $5.00 | $3.70 | $6.00 | $2.00 |
| 0048 | Geotextile for riprap, type 2A (616-12248) | SYS | 732 | $2.00 | $6.50 | $3.70 | $7.00 | $3.00 |
| 0049 | Geotextile for riprap, type 2B (616-12249) | SYS | 227 | $2.00 | $5.00 | $6.00 | $9.00 | $4.00 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $600.00 | $50.00 | $618.00 | $1,200.00 | $600.00 |
| 0051 | Erosion control blanket (621-02770) | SYS | 149 | $6.00 | $5.00 | $6.20 | $5.15 | $30.00 |
| 0052 | Mulched seeding, type R (621-06559) | SYS | 77 | $30.00 | $4.00 | $31.00 | $27.50 | $20.00 |
| 0053 | Mulched seeding, type U (621-06560) | SYS | 504 | $6.00 | $2.50 | $6.20 | $6.00 | $20.00 |
| 0054 | Computer system equipment (628-11976) | EACH | 2 | $600.00 | $100.00 | $890.00 | $1,500.00 | $1,200.00 |
| 0055 | Field office, type D (628-12683) | MOS | 12 | $2,456.00 | $1,100.00 | $3,951.00 | $2,400.00 | $3,000.00 |
| 0056 | Temporary shoring (702-04325) | LS | 1 | $7,000.00 | $2,500.00 | $56,830 | $25,000 | $130,000 |
| 0057 | Field drilled hole in concrete (702-51863) | EACH | 16 | $26.00 | $64.00 | $42.00 | $275.00 | $200.00 |
| 0058 | Patching concrete structures (710-09158) | SFT | 30 | $20.00 | $145.00 | $94.00 | $300.00 | $1,000.00 |
| 0059 | Waterproofing membrane, type 2 (714-000086) | SFT | 6,668 | $3.00 | $2.50 | $1.70 | $2.25 | $3.00 |
| 0060 | Structure extension, reinforced concrete, box sections, 4 FT X 4 FT (714-11170) | LFT | 20 | $1,221.00 | $2,675.00 | $1,250.00 | $2,400.00 | $10,500 |
| 0061 | Structure, coated reinforced concrete, box sections, 15 FT X 4 FT (714-11634) | LFT | 82 | $2,459.00 | $2,790.00 | $2,018.00 | $3,500.00 | $2,887.00 |
| 0062 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 3 | $534.00 | $404.00 | $350.00 | $800.00 | $1,000.00 |
| 0063 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 14 | $217.00 | $252.00 | $151.00 | $350.00 | $300.00 |
| 0064 | Pipe, type 2, deformed, min. area 10.2 SFT (715-08448) | LFT | 70 | $412.00 | $559.00 | $417.00 | $400.00 | $460.00 |
| 0065 | Manhole, type H2 (720-02609) | EACH | 1 | $8,000.00 | $7,800.00 | $4,191.00 | $6,500.00 | $11,000 |
| 0066 | Manhole, type M2 (720-95555) | EACH | 2 | $11,000 | $12,300 | $14,640 | $13,000 | $19,000 |
| 0067 | Inlet, type C15 (720-98555) | EACH | 1 | $7,500.00 | $4,000.00 | $4,463.00 | $6,500.00 | $5,000.00 |
| 0068 | Road closure sign assembly (801-04308) | EACH | 8 | $275.00 | $142.50 | $283.00 | $275.00 | $150.00 |
| 0069 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 9,249 | $1.91 | $1.45 | $2.10 | $1.90 | $2.00 |
| 0070 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 24 | $12.00 | $11.00 | $12.00 | $12.00 | $10.00 |
| 0071 | Detour route marker assembly (801-06625) | EACH | 30 | $110.00 | $71.25 | $113.00 | $110.00 | $75.00 |
| 0072 | Construction sign, type A (801-06640) | EACH | 28 | $200.00 | $195.00 | $206.00 | $200.00 | $175.00 |
| 0073 | Construction sign, type B (801-06645) | EACH | 10 | $100.00 | $75.00 | $103.00 | $100.00 | $75.00 |
| 0074 | Flashing arrow sign (801-06710) | DAY | 144 | $16.00 | $13.00 | $16.00 | $16.00 | $15.00 |
| 0075 | Maintaining traffic (801-06775) | LS | 1 | $28,180 | $43,897 | $193,473 | $70,900 | $49,218 |
| 0076 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $7,750.00 | $9,900.00 | $7,980.00 | $7,750.00 | $7,750.00 |
| 0077 | Barricade, type III-A (801-07118) | LFT | 108 | $17.00 | $13.30 | $18.00 | $17.00 | $14.00 |
| 0078 | Barricade, type III-B (801-07119) | LFT | 152 | $17.00 | $13.30 | $18.00 | $17.00 | $14.00 |
| 0080 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 715 | $95.00 | $49.00 | $75.00 | $125.00 | $50.00 |
| 0081 | Portable signal (801-12081) | LS | 1 | $11,000 | $22,000 | $15,150 | $16,000 | $7,500.00 |
| 0082 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $800.00 | $400.00 | $824.00 | $800.00 | $400.00 |
| 0083 | Temporary buzz strips (801-97643) | LFT | 288 | $18.55 | $30.00 | $19.00 | $18.55 | $20.00 |
| 0084 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 10.50 | $55.00 | $61.00 | $57.00 | $55.00 | $15.00 |
| 0085 | Sign, sheet, relocate (802-07060) | EACH | 1 | $400.00 | $449.00 | $412.00 | $400.00 | $100.00 |
| 0086 | Transverse marking, paint, stop line, white, 24 in. (808-06726) | LFT | 24 | $12.00 | $16.00 | $12.00 | $12.00 | $15.00 |
| 0087 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 93 | $1.20 | $3.00 | $1.20 | $12.00 | $2.00 |
| 0088 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 40 | $1.50 | $22.00 | $1.50 | $1.50 | $15.00 |
| 0089 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 544 | $1.00 | $3.00 | $1.00 | $1.00 | $2.00 |
| 0090 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $6,000.00 | $7,900.00 | $6,178.00 | $6,000.00 | $6,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way