INDOT contract B-43650-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on January 14, 2026, Morgan, Seymour. 5 bids received; low bid $1,013,487 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 73
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,013,487 | Low |
| 2 | CLR Inc | $1,044,692 | +3.0% |
| 3 | Force Construction Co Inc | $1,136,849 | +12% |
| 4 | Pontem Contractors Inc | $1,194,357 | +18% |
| 5 | Ragle, Inc. | $1,384,878 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. CLR Inc | 3. Force Construction Co Inc | 4. Pontem Contractors Inc | 5. Ragle, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $12,000 | $30,000 | $16,990 | $15,000 | $10,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $50,000 | $51,700 | $55,000 | $59,500 | $69,200 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $30,000 | $9,000.00 | $25,980 | $35,800 | $41,500 |
| 0011 | Present structure, remove, structure no. 55-00029 (202-51330) | LS | 1 | $35,000 | $55,000 | $26,440 | $179,708 | $86,050 |
| 0012 | Excavation, common (203-02000) | CYS | 285 | $65.00 | $67.00 | $50.00 | $79.09 | $67.50 |
| 0013 | Borrow (203-02070) | CYS | 10 | $50.00 | $75.00 | $94.00 | $130.58 | $10.00 |
| 0014 | Excavation, waterway (203-51223) | CYS | 172 | $65.00 | $50.00 | $72.00 | $69.91 | $55.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $12,500 | $2,500.00 | $6,076.00 | $3,141.43 | $10,000 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 217 | $35.00 | $45.00 | $72.00 | $65.72 | $66.50 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $7,500.00 | $6,500.00 | $29,460 | $58,114 | $100,000 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 86 | $9.00 | $20.00 | $9.30 | $22.65 | $38.50 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 775 | $55.00 | $51.00 | $39.00 | $38.75 | $55.00 |
| 0021 | B borrow (211-02050) | CYS | 104 | $45.00 | $45.00 | $104.00 | $49.54 | $65.00 |
| 0022 | Structure backfill, type 1 (211-09264) | CYS | 24 | $140.00 | $40.00 | $175.00 | $124.27 | $80.00 |
| 0023 | Structure backfill, type 4 (211-09267) | CYS | 16 | $350.00 | $250.00 | $467.00 | $223.07 | $520.00 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 959 | $5.00 | $3.00 | $3.80 | $3.91 | $4.30 |
| 0025 | Compacted aggregate, no. 53 (301-12234) | CYS | 15 | $125.00 | $75.00 | $113.00 | $94.19 | $130.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 94 | $65.00 | $85.00 | $52.00 | $59.34 | $60.00 |
| 0027 | Milling, transition (306-08043) | SYS | 223 | $10.00 | $20.00 | $19.00 | $20.86 | $18.00 |
| 0028 | Lean concrete base, 9 in. (309-12695) | SYS | 184 | $150.00 | $140.00 | $75.00 | $132.24 | $180.00 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 73 | $198.00 | $230.00 | $211.00 | $233.10 | $205.00 |
| 0030 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 90 | $191.00 | $152.00 | $139.00 | $193.20 | $135.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 216 | $169.00 | $152.00 | $139.00 | $127.05 | $135.00 |
| 0032 | Joint adhesive (401-11526) | LFT | 1,330 | $0.27 | $1.25 | $1.30 | $0.84 | $1.25 |
| 0033 | Asphalt for tack coat (406-05520) | TON | 1 | $896.00 | $650.00 | $669.00 | $4,200.00 | $650.00 |
| 0034 | Guardrail transition, type TGB , modified (601-01522) | EACH | 1 | $3,575.00 | $3,700.00 | $3,347.00 | $3,412.50 | $3,250.00 |
| 0035 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $3,740.00 | $3,900.00 | $3,501.00 | $3,570.00 | $3,400.00 |
| 0036 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $2,540.00 | $2,600.00 | $2,379.00 | $2,425.50 | $2,310.00 |
| 0037 | Barrier delineator (602-06729) | EACH | 6 | $25.00 | $40.00 | $39.00 | $132.48 | $20.00 |
| 0038 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 184 | $240.00 | $250.00 | $184.00 | $197.99 | $200.00 |
| 0039 | HMA for approaches, type B (610-07487) | TON | 20 | $198.00 | $207.00 | $237.00 | $182.70 | $230.00 |
| 0040 | Mailbox assembly, single (611-06497) | EACH | 1 | $313.00 | $200.00 | $294.00 | $299.25 | $285.00 |
| 0041 | Right-of-way marker (615-06490) | EACH | 4 | $195.00 | $125.00 | $183.00 | $186.90 | $178.00 |
| 0042 | Monument, type B (615-06505) | EACH | 2 | $1,800.00 | $1,000.00 | $1,684.00 | $1,716.75 | $1,635.00 |
| 0043 | Riprap, class 1 (616-05688) | TON | 96 | $95.00 | $137.00 | $145.00 | $145.79 | $130.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 323 | $60.00 | $82.00 | $71.00 | $54.00 | $95.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 720 | $3.00 | $7.00 | $4.10 | $4.47 | $3.25 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $780.00 | $200.00 | $747.00 | $761.25 | $750.00 |
| 0047 | Mulched seeding, type R (621-06559) | SYS | 1,431 | $3.30 | $2.50 | $3.10 | $3.13 | $2.37 |
| 0048 | Sodding (621-06574) | SYS | 232 | $17.50 | $7.00 | $16.00 | $33.86 | $30.00 |
| 0049 | Field office, type C (628-09403) | MOS | 8 | $2,500.00 | $1,000.00 | $3,119.00 | $3,456.30 | $2,800.00 |
| 0050 | Computer system equipment (628-11976) | EACH | 1 | $1,000.00 | $100.00 | $832.00 | $1,134.40 | $750.00 |
| 0051 | Test pile, indicator, production (701-09558) | LFT | 277 | $120.00 | $82.00 | $106.00 | $95.99 | $100.00 |
| 0052 | Test pile, indicator, restrike (701-09560) | EACH | 4 | $500.00 | $1,000.00 | $2,966.00 | $937.69 | $8,500.00 |
| 0053 | Pile shoe, HP 12 X 74 (701-09683) | EACH | 20 | $350.00 | $250.00 | $152.00 | $147.39 | $175.00 |
| 0054 | Pile, steel H, HP 12 X 74 (701-95780) | LFT | 935 | $120.00 | $82.00 | $87.00 | $104.16 | $100.00 |
| 0055 | Concrete, A, substructure (702-51005) | CYS | 98 | $950.00 | $1,750.00 | $1,072.00 | $896.07 | $1,200.00 |
| 0056 | Reinforcing bars (703-06028) | LBS | 6,614 | $1.75 | $2.00 | $1.40 | $1.56 | $2.25 |
| 0057 | Reinforcing bars, epoxy coated (703-06029) | LBS | 37,986 | $1.75 | $2.10 | $1.40 | $1.44 | $2.00 |
| 0058 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 36 | $65.00 | $25.00 | $56.00 | $50.61 | $60.00 |
| 0059 | Concrete, C, superstructure (704-51002) | CYS | 102 | $1,250.00 | $925.00 | $1,385.00 | $1,378.79 | $2,300.00 |
| 0060 | Railing, concrete type FC (706-09960) | LFT | 104 | $110.00 | $175.00 | $147.00 | $150.15 | $143.00 |
| 0061 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $1,850.00 | $1,500.00 | $1,390.00 | $1,417.50 | $1,350.00 |
| 0062 | Surface seal (709-51821) | LS | 1 | $1,000.00 | $2,500.00 | $1.00 | $5,250.00 | $500.00 |
| 0063 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 78 | $70.00 | $55.00 | $64.00 | $61.88 | $80.00 |
| 0064 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $600.00 | $500.00 | $947.00 | $884.23 | $800.00 |
| 0065 | Longitudinal grooving (722-12732) | SYS | 291 | $18.00 | $20.00 | $9.80 | $19.21 | $15.00 |
| 0066 | Road closure sign assembly (801-04308) | EACH | 6 | $242.00 | $220.00 | $257.00 | $262.50 | $300.00 |
| 0067 | Detour route marker assembly (801-06625) | EACH | 16 | $105.00 | $110.00 | $108.00 | $110.25 | $115.00 |
| 0068 | Construction sign, type A (801-06640) | EACH | 18 | $192.00 | $175.00 | $118.00 | $120.75 | $180.00 |
| 0069 | Maintaining traffic (801-06775) | LS | 1 | $15,000 | $32,985 | $165,000 | $13,274 | $51,000 |
| 0070 | Barricade, type III-A (801-07118) | LFT | 48 | $16.50 | $17.00 | $15.00 | $15.75 | $16.00 |
| 0071 | Barricade, type III-B (801-07119) | LFT | 60 | $17.50 | $18.00 | $15.00 | $15.75 | $16.00 |
| 0072 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 750 | $1.10 | $0.90 | $2.10 | $2.10 | $0.90 |
| 0073 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 750 | $1.10 | $0.90 | $2.10 | $2.10 | $0.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.