INDOT contract B-43637-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on October 7, 2026, Monroe, Seymour. 8 bids received; low bid $1,712,490 by Duncan Robertson Inc.

Owner
Indiana DOT
Letting
07 OCT 2026
Pay items
73
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duncan Robertson Inc$1,712,490Low
2American Contracting & Services Inc$1,723,168+1.0%
3Milestone Contractors LP$1,798,280+5.0%
4CLR Inc$1,828,471+7.0%
5E & B Paving LLC$1,947,500+14%
6Pontem Contractors Inc$1,949,520+14%
7Force Construction Co Inc$1,981,784+16%
8Ragle, Inc.$2,039,528+19%
INDOT contract B-43637-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duncan Robertson Inc2. American Contracting & Services Inc3. Milestone Contractors LP4. CLR Inc5. E & B Paving LLC6. Pontem Contractors Inc
0001Construction engineering (105-06845)LS1$12,500$20,000$12,500$35,000$45,000$30,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$85,000$86,158$78,599$90,000$97,375$97,476
0010Clearing right-of-way (201-52370)LS1$34,000$34,463$36,270$36,000$15,000$20,952
0011Present structure, remove, structure no. 1 (202-51330)LS1$85,000$30,000$37,000$40,000$65,000$110,194
0012Excavation, common (203-02000)CYS560$40.00$55.00$70.00$35.00$118.91$67.00
0013Borrow (203-02070)CYS345$40.00$55.00$70.00$10.00$47.36$42.50
0014Excavation, waterway (203-51223)CYS355$45.00$30.00$70.00$32.00$79.69$64.50
0015Stormwater management budget (205-12108)DOL22,282$1.00$1.00$1.00$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$25,000$20,000$9,600.00$2,500.00$8,500.00$20,918
0017SWQCP preparation (205-12618)LS1$3,500.00$5,000.00$2,500.00$1,600.00$1,600.00$4,960.00
0018Excavation, X (206-51215)CYS275$120.00$150.00$155.00$380.00$195.00$115.00
0019Excavation, wet (206-51220)CYS690$50.00$85.00$70.00$39.00$65.64$70.00
0020Excavation, dry (206-51225)CYS230$40.00$45.00$70.00$97.00$94.41$69.00
0021Cofferdam (206-51235)LS1$75,000$90,000$43,500$40,000$172,500$127,209
0022Subgrade treatment, type II (207-08264)SYS1,923$22.00$25.00$26.00$15.00$23.14$24.50
0023Structure backfill, type 3 (211-09266)CYS1,352$110.00$95.00$103.00$72.00$85.00$97.50
0024Geotextile for pavement, type 2B (214-12239)SYS3,662$3.50$5.00$3.50$3.75$2.67$4.50
0025Compacted aggregate, no. 5 (301-12232)CYS260$90.00$105.00$117.00$94.00$84.65$95.50
0026Compacted aggregate, no. 53 (301-12234)CYS270$75.00$140.00$84.00$93.00$113.64$90.00
0027Subbase for PCCP (302-06464)CYS43$165.00$145.00$310.00$162.00$265.00$202.00
0028Compacted aggregate, no. 53 (303-01180)TON92$75.00$70.00$57.00$89.00$145.14$64.00
0029Compacted aggregate, no. 73 (303-07449)TON42$70.00$70.00$86.00$49.00$140.60$67.00
0030Widening with HMA, type B (304-07493)TON29$350.00$332.00$445.00$380.00$332.00$475.00
0031Milling, asphalt, 2 in. (306-08036)SYS793$8.00$15.00$15.00$7.50$12.00$8.50
0032QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON215$204.00$202.00$185.00$185.00$202.00$212.50
0033QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON158$160.00$140.00$146.00$163.00$140.00$147.00
0034QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON241$155.00$134.00$141.75$141.00$134.00$141.00
0035Joint adhesive (401-11526)LFT4,795$0.83$0.40$0.75$0.75$0.40$0.50
0036Asphalt for tack coat (406-05521)SYS3,879$0.16$0.30$0.15$0.15$0.30$0.50
0037Guardrail terminal system, W-beam, curved, type 6 , modified (601-01839)EACH1$1,815.00$1,650.00$2,800.00$1,850.00$1,650.00$1,732.50
0038Guardrail terminal system, W-beam, curved, type 3 , modified (601-01846)EACH1$1,815.00$1,650.00$2,600.00$1,850.00$1,650.00$1,732.50
0039Guardrail, remove (601-02241)LFT111$14.00$13.00$20.00$11.00$13.00$14.00
0040Guardrail, thrie-beam, 6 FT 3 in. spacing (601-04150)LFT32$50.00$45.00$63.00$51.00$45.00$47.50
0041Guardrail transition, type TGS-1 (601-06374)EACH4$1,210.00$1,100.00$1,525.00$1,230.00$1,100.00$1,155.00
0042Guardrail end treatment, type OS , SKT 350, TL-2 (601-94689)EACH4$2,860.00$2,600.00$3,100.00$2,900.00$2,600.00$2,730.00
0043Reinforced concrete bridge approach, 10 in. (609-06257)SYS175$275.00$230.00$232.00$275.00$278.00$218.50
0044HMA for approaches, type B (610-07487)TON21$285.00$444.00$258.00$288.00$444.00$466.50
0045Mailbox assembly, single (611-06497)EACH1$330.00$300.00$600.00$300.00$300.00$315.00
0046Riprap, class 2 (616-05689)TON741$65.00$85.00$109.00$75.00$86.32$112.00
0047Riprap, revetment (616-06405)TON80$65.00$75.00$115.00$82.00$117.55$69.50
0048Geotextile for riprap, type 1A (616-12246)SYS723$4.00$5.00$2.50$7.50$2.87$4.00
0049Mobilization and demobilization for seeding (621-01004)EACH2$750.00$1,000.00$1,000.00$1,000.00$1,000.00$1,050.00
0050Erosion control blanket (621-02770)SYS175$7.00$5.00$5.00$5.50$5.00$5.00
0051Seed mixture, type R (621-06553)LBS75$7.00$4.35$4.35$5.00$4.35$40.00
0052Mulching material (621-06565)TON1$800.00$600.00$600.00$675.00$600.00$1,540.50
0053Field office, type C (628-09403)MOS10$2,750.00$4,000.00$3,500.00$1,000.00$2,850.00$3,985.00
0054Computer system equipment (628-11976)EACH1$500.00$1,000.00$1,200.00$100.00$500.00$612.00
0055Topsoil processing and distribution (629-000149)SYS1,777$2.00$7.00$17.00$7.00$5.32$15.00
0056Topsoil amendment budget (629-000150)DOL3,554$1.00$1.00$1.00$1.00$1.00$1.00
0057Concrete, A, substructure (702-51005)CYS206.70$900.00$745.00$1,010.00$865.00$925.00$909.00
0058Concrete, B, footings (702-51015)CYS251.40$600.00$385.00$615.00$765.00$425.00$550.00
0059Reinforcing bars (703-06028)LBS68,855$1.25$1.50$1.55$1.46$1.50$1.45
0060Reinforcing bars, epoxy coated (703-06029)LBS42,844$1.25$1.60$1.65$1.66$2.00$1.55
0061Threaded tie bar assembly, epoxy coated (703-97936)EACH29$60.00$50.00$39.00$35.00$45.00$58.00
0062Concrete, C, superstructure (704-51002)CYS121.60$1,250.00$1,380.00$1,200.00$2,000.00$1,450.00$1,387.00
0063Railing, steel type TS-1 (706-06344)LFT125$88.00$80.00$121.21$102.00$80.00$84.00
0064Surface seal , structure no. 1 (709-51821)LS1$1,500.00$4,000.00$1,000.00$975.00$2,571.00$2,700.00
0065Longitudinal grooving (722-12732)SYS390$12.00$12.00$7.06$13.00$15.00$16.50
0066Road closure sign assembly (801-04308)EACH5$55.00$145.00$145.00$50.00$145.00$152.50
0067Construction sign, type A (801-06640)EACH21$137.00$116.00$116.00$125.00$116.00$122.00
0068Maintaining traffic (801-06775)LS1$22,500$25,000$4,250.00$58,393$25,418$25,377
0069Barricade, type III-A (801-07118)LFT48$4.40$8.00$8.00$4.00$8.00$8.50
0070Barricade, type III-B (801-07119)LFT72$4.40$9.00$9.00$4.00$9.00$9.50
0071Sign post, square, type 1, reinforced anchor base (802-05701)LFT48$33.00$30.00$21.00$34.00$30.00$31.50
0072Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT33$33.00$30.00$24.00$34.00$30.00$31.50
0073Transverse marking, paint, stop line, white, 24 in. (808-06726)LFT14$8.80$12.00$12.00$9.00$12.00$13.00
INDOT contract B-43637-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy