INDOT contract R-44460-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on August 5, 2026, Owen, Seymour. 8 bids received; low bid $1,471,572 by Crider & Crider Inc.
- Owner
- Indiana DOT
- Letting
- 05 AUG 2026
- Pay items
- 67
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crider & Crider Inc | $1,471,572 | Low |
| 2 | Force Construction Co Inc | $1,525,690 | +4.0% |
| 3 | Rieth-Riley Construction Co., Inc. | $1,540,189 | +5.0% |
| 4 | E & B Paving LLC | $1,578,110 | +7.0% |
| 5 | Milestone Contractors LP | $1,672,338 | +14% |
| 6 | CLR Inc | $1,673,966 | +14% |
| 7 | Morphey Construction Inc. | $1,748,000 | +19% |
| 8 | Ragle, Inc. | $1,788,437 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crider & Crider Inc | 2. Force Construction Co Inc | 3. Rieth-Riley Construction Co., Inc. | 4. E & B Paving LLC | 5. Milestone Contractors LP | 6. CLR Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $50,000 | $9,112.00 | $5,900.00 | $15,000 | $6,500.00 | $35,000 |
| 0002 | Railroad flagging budget (107-12976) | DOL | 51,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $68,000 | $76,500 | $44,977 | $75,000 | $83,500 | $84,325 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $29,000 | $15,420 | $22,872 | $14,523 | $25,000 | $33,700 |
| 0012 | Pipe, remove (202-96133) | LFT | 165 | $200.00 | $20.00 | $51.00 | $50.00 | $18.00 | $72.00 |
| 0013 | Excavation, common (203-02000) | CYS | 1,005 | $70.00 | $41.00 | $75.82 | $65.00 | $120.00 | $35.00 |
| 0014 | Pump around (205-11626) | EACH | 2 | $8,000.00 | $8,782.00 | $14,338 | $10,000 | $12,100 | $25,000 |
| 0015 | Stormwater management budget (205-12108) | DOL | 10,600 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $6,000.00 | $13,700 | $5,452.48 | $6,500.00 | $6,799.05 | $1,900.00 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 2,832 | $35.00 | $34.00 | $48.00 | $46.00 | $30.00 | $25.00 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 322 | $80.00 | $82.00 | $101.03 | $75.00 | $72.00 | $70.00 |
| 0019 | Structure backfill, type 5 (211-09268) | CYS | 648 | $190.00 | $232.00 | $188.69 | $245.00 | $185.00 | $140.00 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 2,200 | $3.00 | $3.70 | $3.40 | $5.10 | $3.40 | $6.25 |
| 0021 | Compacted aggregate, no. 8 (301-12233) | CYS | 121 | $120.00 | $74.00 | $136.02 | $115.00 | $130.00 | $190.00 |
| 0022 | Compacted aggregate, no. 53 (303-01180) | TON | 147 | $50.00 | $43.00 | $73.68 | $95.00 | $97.00 | $125.00 |
| 0023 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 237 | $17.00 | $23.00 | $21.24 | $15.00 | $37.00 | $13.00 |
| 0024 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 191 | $190.00 | $199.00 | $240.03 | $230.00 | $188.00 | $209.00 |
| 0025 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 306 | $190.00 | $197.00 | $177.89 | $220.00 | $186.00 | $207.00 |
| 0026 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,070 | $125.00 | $129.00 | $139.52 | $130.00 | $122.00 | $122.00 |
| 0027 | Joint adhesive (401-11526) | LFT | 288 | $1.25 | $1.30 | $0.58 | $5.00 | $1.20 | $1.20 |
| 0028 | Asphalt for tack coat (406-05520) | TON | 3 | $750.00 | $795.00 | $0.01 | $750.00 | $750.00 | $750.00 |
| 0029 | Guardrail connector system, W-beam, curved, type 1 (601-01625) | EACH | 1 | $1,825.00 | $2,808.00 | $1,825.00 | $1,825.00 | $1,825.00 | $3,650.00 |
| 0030 | Guardrail, remove (601-02241) | LFT | 460 | $5.00 | $8.50 | $5.00 | $5.00 | $5.00 | $3.50 |
| 0031 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 363 | $22.00 | $26.00 | $22.00 | $22.00 | $22.00 | $25.00 |
| 0032 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $950.00 | $1,483.00 | $950.00 | $950.00 | $950.00 | $1,050.00 |
| 0033 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,000.00 | $3,179.00 | $2,995.00 | $2,995.00 | $2,995.00 | $3,325.00 |
| 0034 | HMA for approaches, type B (610-07487) | TON | 202 | $220.00 | $223.00 | $240.90 | $180.00 | $210.00 | $233.00 |
| 0035 | Monument, type B (615-06505) | EACH | 2 | $1,150.00 | $1,987.00 | $1,125.00 | $1,125.00 | $1,125.00 | $425.00 |
| 0036 | Riprap, class 2 (616-05689) | TON | 173 | $95.00 | $95.00 | $146.11 | $125.00 | $85.00 | $130.00 |
| 0037 | Riprap, revetment (616-06405) | TON | 67 | $150.00 | $73.00 | $126.89 | $140.00 | $85.00 | $115.00 |
| 0038 | Geotextile for riprap, type 1A (616-12246) | SYS | 312 | $3.50 | $4.30 | $3.22 | $5.00 | $3.10 | $8.00 |
| 0039 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $400.00 | $848.00 | $800.00 | $400.00 | $200.00 | $1,100.00 |
| 0040 | Mulched seeding, type R (621-06559) | SYS | 1,780 | $3.30 | $2.40 | $2.25 | $3.25 | $4.00 | $1.85 |
| 0041 | Topsoil (621-06570) | CYS | 24 | $180.00 | $158.00 | $107.41 | $210.00 | $160.00 | $75.00 |
| 0042 | Computer system equipment (628-11976) | EACH | 2 | $500.00 | $907.00 | $1,114.35 | $1,000.00 | $1,150.00 | $100.00 |
| 0043 | Field office, type D (628-12683) | MOS | 6 | $1,950.00 | $4,535.00 | $3,788.77 | $4,000.00 | $3,400.00 | $1,400.00 |
| 0044 | Temporary shoring (702-04325) | LS | 1 | $30,000 | $39,750 | $70,006 | $22,000 | $128,000 | $21,000 |
| 0045 | Waterproofing membrane, type 2 (714-000086) | SFT | 5,421 | $2.10 | $3.90 | $4.51 | $3.25 | $2.65 | $2.50 |
| 0046 | Structure, coated reinforced concrete, box sections, 15 FT X 7 FT (714-12697) | LFT | 112 | $2,750.00 | $2,669.00 | $2,689.41 | $2,919.50 | $3,303.00 | $4,625.00 |
| 0047 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 50 | $250.00 | $150.00 | $388.81 | $400.00 | $225.00 | $161.00 |
| 0048 | Pipe end section, diameter 36 in. (715-46040) | EACH | 1 | $2,250.00 | $2,191.00 | $2,776.18 | $2,000.00 | $2,650.00 | $1,500.00 |
| 0049 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 9,096 | $2.00 | $2.10 | $2.22 | $1.99 | $2.00 | $1.58 |
| 0050 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 240 | $11.75 | $12.00 | $13.15 | $12.00 | $12.00 | $9.23 |
| 0051 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 143 | $3.75 | $4.00 | $4.40 | $2.50 | $2.50 | $4.15 |
| 0052 | Construction sign, type A (801-06640) | EACH | 24 | $190.00 | $200.00 | $236.00 | $200.00 | $200.00 | $300.00 |
| 0053 | Construction sign, type B (801-06645) | EACH | 16 | $105.00 | $109.00 | $107.00 | $120.00 | $120.00 | $103.00 |
| 0054 | Maintaining traffic (801-06775) | LS | 1 | $12,000 | $87,003 | $28,928 | $25,000 | $31,700 | $51,386 |
| 0055 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $6,000.00 | $10,070 | $5,800.00 | $5,800.00 | $5,800.00 | $6,425.00 |
| 0056 | Barricade, type III-A (801-07118) | LFT | 50 | $16.00 | $17.00 | $13.00 | $17.25 | $17.25 | $15.00 |
| 0057 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 925 | $55.00 | $71.00 | $39.89 | $60.00 | $97.00 | $50.00 |
| 0058 | Portable signal (801-12081) | LS | 1 | $20,000 | $12,400 | $10,000 | $30,000 | $7,000.00 | $45,000 |
| 0059 | Driveway assistance device (801-12482) | EACH | 2 | $2,650.00 | $4,572.00 | $3,000.00 | $9,000.00 | $5,000.00 | $1,000.00 |
| 0060 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $950.00 | $999.00 | $342.00 | $825.00 | $825.00 | $1,050.00 |
| 0061 | Line, remove (808-06716) | LFT | 4,845 | $0.71 | $0.75 | $0.58 | $0.70 | $0.70 | $0.71 |
| 0062 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,938 | $1.00 | $1.00 | $3.42 | $1.20 | $1.20 | $0.98 |
| 0063 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,838 | $1.00 | $1.00 | $3.42 | $1.20 | $1.20 | $0.98 |
| 0064 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 25 | $2.00 | $2.10 | $3.42 | $1.80 | $1.80 | $2.00 |
| 0065 | Grooving for pavement markings (808-12032) | LFT | 3,826 | $0.80 | $0.85 | $1.35 | $0.80 | $0.80 | $0.78 |
| 0066 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 25 | $2.00 | $2.10 | $3.42 | $1.80 | $1.80 | $2.00 |
| 0067 | Guardrail, MGS, structure top-mounted posts (601-12293) | EACH | 4 | $420.00 | $689.00 | $420.00 | $420.00 | $420.00 | $475.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 5, 2026. Compiled by Mirage Metrics.