INDOT contract R-44279-A bid tabulation
INTERSECTION IMPROVMENT WITH TRAFFIC SIGNAL MODERNIZATION. Let by Indiana DOT on October 7, 2026, Bartholomew, Seymour. 4 bids received; low bid $1,107,561 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 66
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $1,107,561 | Low |
| 2 | Calumet Civil Contractors Inc | $1,328,000 | +20% |
| 3 | Morphey Construction Inc. | $1,395,000 | +26% |
| 4 | Dave O'Mara Contractor Inc | $1,650,388 | +49% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Calumet Civil Contractors Inc | 3. Morphey Construction Inc. | 4. Dave O'Mara Contractor Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,400 | $25,000 | $25,000 | $25,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $67,323 | $65,000 | $69,750 | $79,219 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $81,600 | $26,000 | $27,900 | $29,707 |
| 0011 | Conduit, remove (202-01845) | LFT | 175 | $20.00 | $15.00 | $15.00 | $18.43 |
| 0012 | Pavement removal (202-02240) | SYS | 928 | $0.05 | $30.00 | $0.01 | $10.00 |
| 0013 | Headwall, remove (202-02271) | EACH | 2 | $1,555.73 | $968.00 | $500.00 | $1,750.00 |
| 0014 | Excavation, common (203-02000) | CYS | 913 | $0.05 | $30.00 | $75.00 | $94.59 |
| 0015 | Embankment (203-02055) | CYS | 1,298 | $0.05 | $30.00 | $40.00 | $74.04 |
| 0016 | Stormwater management budget (205-12108) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $5,000.00 | $1,500.00 | $1,600.00 | $4,298.82 |
| 0018 | Subgrade treatment, type II (207-08264) | SYS | 299 | $35.92 | $36.00 | $30.00 | $34.01 |
| 0019 | Subgrade treatment, type ibc (207-12635) | SYS | 3,023 | $34.50 | $38.00 | $55.00 | $48.90 |
| 0020 | Compacted aggregate, no. 53 (303-01180) | TON | 626 | $66.95 | $47.00 | $60.00 | $52.37 |
| 0021 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 15,020 | $2.50 | $2.85 | $3.00 | $1.55 |
| 0022 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 1,251 | $135.00 | $169.00 | $140.00 | $120.42 |
| 0023 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 227 | $145.00 | $148.00 | $140.00 | $207.67 |
| 0024 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 599 | $139.00 | $130.00 | $140.00 | $172.74 |
| 0025 | Joint adhesive (401-11526) | LFT | 6,434 | $0.70 | $0.50 | $0.50 | $1.54 |
| 0026 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 5,000 | $8.00 | $6.50 | $6.50 | $8.18 |
| 0027 | Asphalt for tack coat (406-05521) | SYS | 25,631 | $0.35 | $0.81 | $0.50 | $0.31 |
| 0028 | HMA for approaches, type C (610-07488) | TON | 698 | $164.00 | $175.00 | $210.00 | $165.81 |
| 0029 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $850.00 | $1,500.00 | $1,500.00 | $1,843.20 |
| 0030 | Mulched seeding, type R (621-06559) | SYS | 7,069 | $0.77 | $6.00 | $5.00 | $1.17 |
| 0031 | Field office, type D (628-12683) | MOS | 10 | $4,600.00 | $3,200.00 | $3,000.00 | $2,500.00 |
| 0032 | Pipe, type 1, circular, diameter 12 in. (715-05118) | LFT | 35 | $87.14 | $105.00 | $110.00 | $93.47 |
| 0033 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 14 | $136.09 | $105.00 | $114.00 | $409.33 |
| 0034 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 200 | $99.72 | $105.00 | $150.00 | $254.57 |
| 0035 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 13 | $270.88 | $200.00 | $168.00 | $486.67 |
| 0036 | Pipe end section, diameter 12 in. (715-46000) | EACH | 1 | $785.54 | $1,700.00 | $1,800.00 | $2,479.21 |
| 0037 | Pipe end section, diameter 15 in. (715-46005) | EACH | 3 | $812.55 | $1,700.00 | $2,100.00 | $2,727.34 |
| 0038 | Pipe end section, diameter 18 in. (715-46010) | EACH | 3 | $865.41 | $1,700.00 | $2,200.00 | $2,834.20 |
| 0039 | Inlet, type A3 (720-45010) | EACH | 1 | $5,237.24 | $3,400.00 | $4,100.00 | $3,664.07 |
| 0040 | Manhole, type C4 (720-45410) | EACH | 1 | $6,037.58 | $6,400.00 | $5,800.00 | $3,486.59 |
| 0041 | Maintaining traffic (801-06775) | LS | 1 | $62,450 | $156,075 | $111,283 | $323,076 |
| 0042 | Portable changeable message sign (801-11642) | EACH | 2 | $5,555.00 | $5,595.00 | $5,555.00 | $8,671.97 |
| 0043 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 4 | $1,955.00 | $2,398.00 | $1,955.00 | $2,935.16 |
| 0044 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 77 | $30.07 | $16.00 | $37.55 | $34.41 |
| 0045 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 48 | $32.37 | $17.00 | $36.55 | $36.86 |
| 0046 | Handhole, signal, type 1 (805-01842) | EACH | 1 | $1,974.21 | $2,100.00 | $4,000.00 | $2,703.37 |
| 0047 | Loop detector delay amplifier, counting, 2 channel (805-09539) | EACH | 1 | $505.91 | $400.00 | $500.00 | $675.84 |
| 0048 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 115 | $84.73 | $30.00 | $30.00 | $43.01 |
| 0049 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 2,940 | $1.23 | $1.00 | $12.00 | $1.23 |
| 0050 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 2,450 | $2.90 | $3.50 | $8.00 | $2.46 |
| 0051 | Signal detector housing (805-78785) | EACH | 7 | $2,200.82 | $1,900.00 | $4,500.00 | $2,457.61 |
| 0052 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 2,450 | $1.79 | $13.00 | $2.00 | $17.20 |
| 0053 | Loop detector delay amplifier, non-counting, 2 channel (805-92504) | EACH | 1 | $394.09 | $400.00 | $450.00 | $491.52 |
| 0054 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 981 | $1.10 | $1.48 | $1.10 | $1.82 |
| 0055 | Transverse marking, paint, stop line, white, 24 in. (808-06726) | LFT | 59 | $16.00 | $11.07 | $16.00 | $13.60 |
| 0056 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 135 | $16.00 | $10.00 | $16.00 | $24.58 |
| 0057 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,350 | $1.00 | $1.28 | $1.10 | $1.57 |
| 0058 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 4,113 | $1.00 | $1.06 | $1.10 | $1.30 |
| 0059 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 2,794 | $1.00 | $1.04 | $1.10 | $1.28 |
| 0060 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 8 | $255.00 | $229.00 | $255.00 | $281.40 |
| 0061 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 55 | $45.34 | $30.00 | $14.00 | $43.01 |
| 0062 | Snowplowable raised pavement marker (808-75998) | EACH | 55 | $65.00 | $85.00 | $65.00 | $153.60 |
| 0063 | Line, thermoplastic, broken, white, 6 in. (808-96075) | LFT | 2,765 | $1.10 | $2.17 | $1.10 | $2.67 |
| 0064 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 3 | $2,269.75 | $1,500.00 | $500.00 | $786.70 |
| 0065 | Flowable backfill, non- removable (213-09269) | CYS | 5.70 | $1,960.18 | $210.00 | $800.00 | $807.63 |
| 0066 | Structure backfill, type 2 (211-09265) | CYS | 80 | $127.50 | $85.00 | $70.00 | $155.85 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.