INDOT contract R-39073-A bid tabulation

BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on November 5, 2026, Hancock, Greenfield. 7 bids received; low bid $2,047,000 by Morphey Construction Inc..

Owner
Indiana DOT
Letting
05 NOV 2026
Pay items
70
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Morphey Construction Inc.$2,047,000Low
2Rieth-Riley Construction Co., Inc.$2,066,420+1.0%
3Milestone Contractors LP$2,098,534+3.0%
4Dave O'Mara Contractor Inc$2,302,268+12%
5Calumet Civil Contractors Inc$2,428,000+19%
6Olco Inc$2,574,837+26%
7Yarberry Companies Inc$2,606,281+27%
INDOT contract R-39073-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Morphey Construction Inc.2. Rieth-Riley Construction Co., Inc.3. Milestone Contractors LP4. Dave O'Mara Contractor Inc5. Calumet Civil Contractors Inc6. Olco Inc
0001Construction engineering (105-06845)LS1$23,900$16,745$16,241$62,500$33,000$51,865
0002Inspection hole, deeper than 3 FT (107-09358)EACH22$300.00$676.05$2,200.00$241.92$244.58$204.02
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$102,350$108,610$105,420$115,225$120,000$95,875
0010Clearing right-of-way (201-52370)LS1$40,940$7,279.01$61,976$33,000$45,290$48,457
0011Pipe abandon and grout fill (202-02637)LFT40$100.00$32.06$55.00$110.00$135.00$25.85
0012Pipe, remove (202-96133)LFT105$35.00$30.23$12.00$88.76$34.00$27.89
0013Pipe end section, remove (202-98488)EACH5$500.00$270.05$450.00$888.50$121.00$171.75
0014Excavation, common (203-02000)CYS477$45.50$83.70$57.00$79.96$162.00$74.47
0015Borrow (203-02070)CYS1,538$15.00$88.73$14.00$51.73$42.00$47.26
0016Stormwater management budget (205-12108)DOL12,403$1.00$1.00$1.00$1.00$1.00$1.00
0017Stormwater management implementation (205-12616)LS1$500.00$6,842.71$15,000$28,865$50,000$16,690
0018SWQCP preparation (205-12618)LS1$2,500.00$2,150.00$2,250.00$2,565.00$2,700.00$12,250
0019Subgrade treatment, type II (207-08264)SYS5,243$17.00$24.25$21.00$19.35$32.00$32.53
0020Subgrade treatment, type IC (207-09935)SYS71$45.00$62.48$70.00$49.25$59.49$75.76
0021Structure backfill, type 1 (211-09264)CYS6$75.00$306.89$57.00$158.57$67.86$190.82
0022Structure backfill, type 2 (211-09265)CYS276$75.00$99.72$56.00$110.87$108.00$121.07
0023Compacted aggregate, no. 53 (301-12234)CYS8$300.00$285.15$185.00$216.04$176.00$131.67
0024Compacted aggregate, no. 53 (303-01180)TON4$150.00$348.72$350.00$391.96$350.00$211.48
0025HMA patching, full depth, type B (304-12623)TON39$640.00$253.89$310.00$187.89$250.00$190.04
0026Asphalt for tack coat (406-05520)TON2$0.01$0.01$504.00$692.76$3,500.00$2,025.28
0027HMA for sidewalk (604-05528)TON830$151.00$154.52$145.00$149.51$150.00$192.48
0028Curb ramp, concrete (604-08086)SYS45$265.00$232.29$300.00$174.15$180.00$276.90
0029Detectable warning surfaces (604-12083)SYS8$401.00$305.56$275.00$405.00$423.00$202.19
0030Curb and gutter, concrete (605-06140)LFT53$140.00$72.47$85.00$79.88$54.00$126.53
0031HMA for approaches, type B (610-07487)TON10$475.00$415.55$365.00$353.85$314.00$286.18
0032Mailbox assembly, reset, single (611-08232)EACH1$590.00$590.00$650.00$886.98$590.00$319.52
0033Riprap, revetment (616-06405)TON78$110.00$130.38$82.00$115.77$95.00$71.91
0034Geotextile for riprap, type 1A (616-12246)SYS115$6.00$5.31$10.00$11.46$15.00$4.70
0035Bench (618-03812)EACH2$2,800.00$3,945.00$3,500.00$4,076.11$3,945.00$4,133.28
0036Water (621-06567)KGAL448$5.00$5.00$1.00$5.77$125.00$263.80
0037Sodding, nursery (621-06575)SYS7,465$8.00$4.35$4.71$5.02$13.00$20.17
0038Field office, type A (628-09401)MOS9$3,200.00$3,569.93$2,800.00$2,886.51$3,200.00$1,599.37
0039Topsoil processing and distribution (629-000149)SYS7,465$2.40$4.54$15.00$3.70$9.00$12.01
0040Topsoil amendment budget (629-000150)DOL14,930$1.00$1.00$1.00$1.00$1.00$1.00
0044Pile, helical (701-11931)LFT180$190.00$250.00$165.00$212.97$300.00$130.23
0045Concrete, C, substructure (702-92857)CYS9$2,600.00$4,011.69$4,500.00$1,478.59$2,500.00$1,611.96
0046Reinforcing bars, epoxy coated (703-06029)LBS1,502$3.00$5.08$6.00$3.95$3.00$11.07
0047Bridge, steel truss, pre- engineered (711-04845)LS1$120,000$146,580$155,000$159,584$187,000$236,618
0048Pipe, type 1, circular, diameter 18 in. , watermain grade (715-05121)LFT44$106.00$138.91$180.00$145.59$140.00$207.10
0049Pipe, type 1, circular, diameter 24 in. , watermain grade (715-05123)LFT66$130.00$168.09$155.00$185.23$170.00$242.21
0050Pipe, type 2, circular, diameter 24 in. , watermain grade (715-05154)LFT508$130.00$118.30$110.00$145.20$156.00$201.92
0051Pipe end section, diameter 18 in. (715-46010)EACH1$1,300.00$1,026.35$1,080.00$1,941.96$2,400.00$934.68
0052Inlet, type F7 (720-45035)EACH3$3,300.00$3,235.02$4,500.00$2,745.21$3,700.00$3,559.28
0053Manhole, type C7 (720-94432)EACH2$5,000.00$4,652.37$5,500.00$3,179.98$6,400.00$4,401.75
0054Road closure sign assembly (801-04308)EACH2$169.00$169.00$75.00$255.17$169.00$75.00
0055Detour route marker assembly (801-06625)EACH13$129.00$129.00$60.00$153.56$129.00$60.00
0056Construction sign, type A (801-06640)EACH16$197.00$197.00$150.00$200.90$197.00$150.00
0057Construction sign, type B (801-06645)EACH4$86.00$86.00$50.00$116.62$86.00$50.00
0058Maintaining traffic (801-06775)LS1$21,265$16,982$50,000$44,795$64,419$66,141
0059Barricade, type III-B (801-07119)LFT94$10.00$10.00$6.00$16.82$10.00$6.00
0060Sign post, square, type 1, reinforced anchor base (802-05701)LFT12$50.00$36.00$36.00$25.40$36.00$36.00
0061Sign, sheet, and supports, remove (802-07059)EACH1$100.00$70.50$70.50$57.73$70.50$70.50
0062Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT11$50.00$36.00$36.00$34.64$36.00$36.00
0063Conduit, steel, galvanized, 2 in. (805-01844)LFT209$50.00$40.00$40.00$56.58$40.00$40.00
0064Wire, no. 4 copper, in conduit, bridge 1/C (807-01653)LFT124$9.00$9.10$9.10$5.77$9.10$9.10
0065Wire, THW, no. 4 copper, in plastic duct, 4 1/C (807-02426)LFT209$35.00$15.50$15.50$26.56$15.50$15.50
0066Luminaire, ornamental (807-03950)EACH57$3,000.00$3,115.00$3,115.00$3,694.74$3,115.00$3,115.00
0067Light pole, ornamental (807-03951)EACH57$8,000.00$8,310.00$8,310.00$9,871.87$8,310.00$8,310.00
0068Lighting foundation , 30 inch dia X 8 FT height (807-04653)EACH57$3,000.00$2,085.00$2,085.00$2,309.21$2,085.00$2,085.00
0069Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580)LFT5,803$35.00$15.50$15.50$26.56$15.50$15.50
0070Service point, type I (807-86805)EACH2$14,000$9,640.00$9,640.00$10,969$9,640.00$9,640.00
0071Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889)LFT4,104$2.00$1.40$1.40$1.73$1.40$1.40
0072Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439)LFT68$21.16$21.16$20.00$16.29$21.16$20.00
0073Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297)LFT25$21.16$21.16$20.00$16.29$21.16$20.00
INDOT contract R-39073-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy