| 0001 | Construction engineering (105-06845) | LS | 1 | $11,000 | $22,500 | $5,000.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $45,295 | $67,000 | $70,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $12,500 | $25,000 |
| 0012 | Curb and gutter, remove (202-02279) | LFT | 90 | $80.00 | $75.00 | $55.00 |
| 0013 | Excavation, common (203-02000) | CYS | 268 | $17.00 | $100.00 | $85.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 2,314 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $2,680.77 | $2,500.00 | $4,500.00 |
| 0016 | Subgrade treatment, type II (207-08264) | SYS | 420 | $20.00 | $25.00 | $13.00 |
| 0017 | Geogrid, type IB (214-11796) | SYS | 102 | $5.00 | $12.00 | $10.00 |
| 0018 | Compacted aggregate, no. 53 (301-12234) | CYS | 5 | $500.00 | $120.00 | $650.00 |
| 0019 | Compacted aggregate, no. 53 (303-01180) | TON | 535 | $75.00 | $50.00 | $75.00 |
| 0020 | Widening with HMA, type C (304-07494) | TON | 115 | $260.00 | $300.00 | $300.00 |
| 0021 | HMA patching, full depth, type C (304-12625) | TON | 56 | $375.00 | $300.00 | $450.00 |
| 0022 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 42,651 | $2.60 | $2.25 | $2.50 |
| 0023 | Milling, approach (306-08432) | SYS | 540 | $12.00 | $15.00 | $35.00 |
| 0024 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 3,519 | $85.00 | $130.00 | $150.00 |
| 0025 | Inertial profiler, HMA (401-12169) | LS | 1 | $1,000.00 | $4,500.00 | $7,000.00 |
| 0026 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 13,709 | $3.85 | $3.85 | $3.00 |
| 0027 | HMA spray paver emulsion (401-12664) | TON | 15 | $2,000.00 | $1,500.00 | $750.00 |
| 0028 | Guardrail, MGS, long span, type 1 (601-12287) | EACH | 1 | $3,300.00 | $3,475.00 | $3,300.00 |
| 0029 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,345.00 | $3,525.00 | $3,345.00 |
| 0030 | Curb and gutter, concrete , modified (605-06140) | LFT | 90 | $142.62 | $100.00 | $130.00 |
| 0031 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 30,657 | $0.65 | $1.70 | $1.15 |
| 0032 | HMA for approaches, type B (610-07487) | TON | 540 | $135.00 | $150.00 | $210.00 |
| 0033 | Casting adjust to grade, monument (615-06525) | EACH | 16 | $1,000.00 | $1,050.00 | $1,000.00 |
| 0034 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $200.00 | $210.00 | $200.00 |
| 0035 | Mulched seeding, type R (621-06559) | SYS | 97 | $30.00 | $31.50 | $64.00 |
| 0036 | Field office, type C (628-09403) | MOS | 14 | $2,750.00 | $2,500.00 | $2,400.00 |
| 0037 | Computer system equipment (628-11976) | EACH | 3 | $700.00 | $1,500.00 | $1,200.00 |
| 0038 | Casting, inlet, adjust to grade (720-12797) | EACH | 9 | $758.46 | $2,040.00 | $1,100.00 |
| 0039 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 43,350 | $1.00 | $0.50 | $0.75 |
| 0040 | Construction sign, type A (801-06640) | EACH | 32 | $300.00 | $236.00 | $300.00 |
| 0041 | Construction sign, type B (801-06645) | EACH | 12 | $100.00 | $97.00 | $100.00 |
| 0042 | Flashing arrow sign (801-06710) | DAY | 180 | $0.56 | $18.00 | $10.00 |
| 0043 | Maintaining traffic (801-06775) | LS | 1 | $47,150 | $100,994 | $127,000 |
| 0044 | Portable changeable message sign (801-11642) | EACH | 2 | $4,000.00 | $4,150.00 | $4,000.00 |
| 0045 | Truck mounted attenuator (801-12042) | DAY | 180 | $50.00 | $195.00 | $10.00 |
| 0046 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $400.00 | $330.00 | $400.00 |
| 0047 | Construction signs mobile (801-92448) | DAY | 180 | $5.00 | $49.00 | $5.00 |
| 0048 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $3,870.00 | $2,500.00 |
| 0049 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 26,197 | $0.97 | $1.05 | $1.00 |
| 0050 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 15,258 | $0.97 | $1.05 | $1.00 |
| 0051 | Grooving for pavement markings (808-12032) | LFT | 43,350 | $0.10 | $0.38 | $0.10 |
| 0052 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 1,895 | $0.97 | $1.25 | $1.00 |
| 0053 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 124 | $30.00 | $22.50 | $30.00 |
| 0054 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 343 | $3.00 | $13.80 | $20.00 |
| 0055 | Snowplowable raised pavement marker (808-75998) | EACH | 343 | $47.00 | $58.00 | $47.00 |