Louisville Paving Co: INDOT bid record
Louisville Paving Co submitted 24 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 02 SEP 2026, and was the low bidder on 2 of them (8%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $1,966,200
- Latest bid
- 02 SEP 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 0 | 0% |
| 2023 | 8 | 1 | 13% |
| 2025 | 5 | 1 | 20% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 22 | 2 | 9% |
| Vincennes | 1 | 0 | 0% |
| Crawfordsville | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 23 | 23 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 22 | 22 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Payment adjustment PG asphalt binder | 109-09489 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 17 | 9 (53%) | $790.00 | $525.00 |
| Project estimate adjustment | 109-08463 | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
| Road closure sign assembly | 801-04308 | EACH | 18 | 8 (44%) | $217.00 | $280.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & B Paving LLC | 22 | 17 of 22 |
| Mac Construction & Excavating Inc | 11 | 6 of 11 |
| Force Construction Co Inc | 7 | 4 of 7 |
| Ragle, Inc. | 4 | 2 of 4 |
| 5 Star Company Inc | 4 | 3 of 4 |
| Milestone Contractors LP | 4 | 2 of 4 |
| Dave Omara Contractor Inc | 4 | 2 of 4 |
| Libs Paving Company Inc | 4 | 2 of 4 |
| Beaty Construction Inc | 3 | 1 of 3 |
| Morphey Construction Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 SEP 2026 | R-45304-A | Seymour | SMALL STRUCTURE REPLACEMENT | 5 of 9 | $194,459 | +37% |
| 02 SEP 2026 | R-45561-A | Crawfordsville | SMALL STRUCTURE PIPE LINING | 4 of 5 | $3,798,454 | +24% |
| 11 FEB 2026 | R-41527-A | Seymour | INTERSECTION IMPROVEMENT, ROUNDABOUT | 4 of 4 | $5,023,363 | +17% |
| 10 SEP 2025 | R-45525-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 4 of 4 | $1,609,000 | +23% |
| 06 AUG 2025 | R-46402-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 3 of 4 | $2,478,660 | +42% |
| 09 JUL 2025 | R-45678-A | Seymour | PAVEMENT PATCHING | 1 of 3 | $1,267,200 | Low, 18% under the second |
| 07 MAY 2025 | R-40461-A | Seymour | ROAD RECONSTRUCTION | 3 of 3 | $4,406,463 | +35% |
| 15 JAN 2025 | R-42881-A | Seymour | ASPHALT RESURFACE, AUXILIARY LANES AND TRAFFIC SIGNALS | 4 of 5 | $3,088,000 | +16% |
| 13 DEC 2023 | R-40417-A | Seymour | SMALL STRUCTURE REPLACEMENT | 5 of 5 | $2,226,000 | +24% |
| 13 DEC 2023 | R-42233-A | Seymour | INTERSECTION IMPROVEMENT WITH ADDED TURN LANES | 2 of 3 | $3,466,500 | +6.0% |
| 09 AUG 2023 | R-40415-B | Seymour | INTERSECTION IMPROVEMENT WITH ADDED TURN LANES | 3 of 3 | $2,733,000 | +8.0% |
| 10 FEB 2023 | R-40288-A | Seymour | ACCESS CONTROL | 2 of 3 | $3,292,000 | +22% |
| 10 FEB 2023 | B-40421-A | Seymour | BRIDGE, SUPERSTRUCTURE AND SMALL STRUCTURE REPLACEMENT | 3 of 3 | $6,622,000 | +5.0% |
| 19 JAN 2023 | R-41442-A | Seymour | SMALL STRUCTURE REPLACEMENT | 1 of 4 | $699,000 | Low, 20% under the second |
| 19 JAN 2023 | R-41533-A | Seymour | SLIDE CORRECTION | 3 of 4 | $1,220,000 | +13% |
| 19 JAN 2023 | B-41421-A | Seymour | BRIDGE AND SMALL STRUCTURE REPLACEMENT, MAINT AND REPAIR | 2 of 3 | $2,987,000 | +21% |
| 07 DEC 2022 | R-41444-A | Seymour | SMALL STRUCTURE REPLACEMENT | 3 of 8 | $865,000 | +9.0% |
| 07 DEC 2022 | B-42900-A | Seymour | BRIDGE DECK OVERLAY | 2 of 2 | $763,000 | +14% |
| 16 NOV 2022 | B-40988-A | Seymour | BRIDGE DECK OVERLAY | 3 of 3 | $2,319,000 | +27% |
| 10 AUG 2022 | R-44288-A | Seymour | PAVEMENT PATCHING | 2 of 3 | $1,759,772 | +22% |
| 13 JUL 2022 | R-42642-A | Seymour | SMALL STRUCTURE REPLACEMENT | 2 of 2 | $397,000 | +9.0% |
| 09 FEB 2022 | R-40418-A | Seymour | SMALL STRUCTURE REPLACEMENT AND REHABILITATION | 3 of 6 | $432,000 | +47% |
| 12 JAN 2022 | B-40438-A | Seymour | BRIDGE REPLACEMENT | 2 of 5 | $1,617,000 | +13% |
| 12 JAN 2022 | B-41044-A | Vincennes | BRIDGE REPLACEMENT | 5 of 5 | $4,239,000 | +20% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.