INDOT contract R-41527-A bid tabulation
INTERSECTION IMPROVEMENT, ROUNDABOUT. Let by Indiana DOT on February 11, 2026, Scott, Seymour. 4 bids received; low bid $4,292,805 by Dan Cristiani Excavating Co Inc.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 125
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dan Cristiani Excavating Co Inc | $4,292,805 | Low |
| 2 | E & B Paving LLC | $4,525,000 | +5.0% |
| 3 | Milestone Contractors LP | $4,665,900 | +9.0% |
| 4 | Louisville Paving Co | $5,023,363 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dan Cristiani Excavating Co Inc | 2. E & B Paving LLC | 3. Milestone Contractors LP | 4. Louisville Paving Co |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $110,241 | $105,000 | $95,000 | $75,000 |
| 0002 | E-ticket incentive (106-12979) | EACH | 1 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $123,128 | $215,000 | $424,253 | $333,356 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $82,629 | $97,665 | $93,600 | $280,000 |
| 0014 | Testing for asbestos (202-01261) | EACH | 1 | $33.00 | $2,500.00 | $3,000.00 | $2,950.00 |
| 0015 | Regulated asbestos containing materials, remove (202-03729) | LFT | 980 | $55.00 | $70.00 | $87.00 | $72.39 |
| 0016 | Handhole, remove (202-86946) | EACH | 1 | $1,217.00 | $800.00 | $2,000.00 | $800.00 |
| 0017 | Signal pole foundation, remove (202-93995) | EACH | 2 | $2,006.00 | $3,197.89 | $1,600.00 | $800.00 |
| 0018 | Signal pole, remove (202-93999) | EACH | 2 | $1,161.00 | $800.00 | $53.00 | $800.00 |
| 0019 | Pipe, remove (202-96133) | LFT | 147 | $56.00 | $65.00 | $150.00 | $29.37 |
| 0020 | Excavation, common (203-02000) | CYS | 16,550 | $23.00 | $42.00 | $5.00 | $31.00 |
| 0021 | Stormwater management budget (205-12108) | DOL | 66,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0022 | Stormwater management implementation (205-12616) | LS | 1 | $95,745 | $44,000 | $23,100 | $250,000 |
| 0023 | SWQCP preparation (205-12618) | LS | 1 | $2,171.00 | $2,550.00 | $8,000.00 | $3,320.00 |
| 0024 | Subgrade treatment, type II (207-08264) | SYS | 377 | $22.00 | $40.00 | $50.00 | $35.00 |
| 0025 | Subgrade treatment, type ibl (207-12636) | SYS | 13,955 | $12.00 | $12.00 | $15.00 | $12.62 |
| 0026 | Structure backfill, type 1 (211-09264) | CYS | 398 | $51.00 | $82.00 | $89.00 | $94.31 |
| 0027 | Geogrid, type IB (214-11796) | SYS | 377 | $4.00 | $5.00 | $2.50 | $4.86 |
| 0028 | Geotextile for pavement, type 2A (214-12238) | SYS | 12,135 | $4.00 | $3.00 | $3.25 | $3.38 |
| 0029 | Drying soils for embankment (217-11917) | TON | 25 | $989.00 | $900.00 | $1,400.00 | $825.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 5,400 | $68.00 | $49.00 | $52.00 | $38.15 |
| 0031 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 112 | $8.00 | $23.93 | $21.00 | $5.25 |
| 0032 | Milling, asphalt, 2 in. (306-08036) | SYS | 331 | $7.00 | $17.89 | $8.50 | $5.25 |
| 0033 | Milling, transition (306-08043) | SYS | 442 | $24.00 | $14.72 | $5.25 | $5.25 |
| 0034 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 108 | $160.00 | $130.00 | $200.00 | $125.00 |
| 0035 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 958 | $160.00 | $126.00 | $160.00 | $125.00 |
| 0036 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 203 | $100.00 | $112.00 | $160.00 | $135.00 |
| 0037 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 1,436 | $100.00 | $110.00 | $130.00 | $126.00 |
| 0038 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 1,914 | $90.00 | $100.00 | $120.00 | $110.00 |
| 0039 | QC/QA-HMA, 3, 58E, intermediate, OG, 19.0 MM (401-000062) | TON | 1,492 | $90.00 | $102.01 | $130.00 | $110.00 |
| 0040 | Joint adhesive (401-11526) | LFT | 4,250 | $1.00 | $0.70 | $0.70 | $0.01 |
| 0041 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 4,250 | $1.16 | $4.29 | $12.00 | $5.75 |
| 0042 | HMA for temporary pavement, type C (402-10086) | TON | 1,100 | $195.00 | $110.00 | $245.00 | $160.00 |
| 0043 | Asphalt for tack coat (406-05520) | TON | 12 | $1,000.00 | $595.00 | $1,100.00 | $0.01 |
| 0044 | PCCP, 8 in. (502-06999) | SYS | 356 | $122.00 | $140.00 | $140.00 | $137.63 |
| 0045 | D-1 contraction joint (503-05240) | LFT | 350 | $19.00 | $32.81 | $29.00 | $39.61 |
| 0046 | Curb, integral concrete (605-06090) | LFT | 320 | $41.00 | $75.16 | $41.00 | $40.59 |
| 0047 | Curb, integral concrete, type B (605-06095) | LFT | 48 | $69.00 | $152.94 | $90.00 | $54.52 |
| 0048 | Curb and gutter, concrete , modified (605-06140) | LFT | 1,805 | $51.00 | $42.00 | $46.00 | $67.21 |
| 0049 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 376 | $53.00 | $69.00 | $56.00 | $53.82 |
| 0051 | HMA for approaches, type B (610-07487) | TON | 213 | $265.00 | $192.00 | $180.00 | $180.00 |
| 0052 | Mailbox assembly, reset, single (611-08232) | EACH | 3 | $435.00 | $400.00 | $470.00 | $353.50 |
| 0053 | Right-of-way marker (615-06490) | EACH | 39 | $155.00 | $225.00 | $270.00 | $202.00 |
| 0054 | Monument, type B (615-06505) | EACH | 6 | $1,277.00 | $1,200.00 | $1,800.00 | $1,388.76 |
| 0055 | Monument, type C (615-06510) | EACH | 5 | $813.00 | $800.00 | $1,500.00 | $1,111.01 |
| 0056 | Riprap, class 1 (616-05688) | TON | 108 | $69.00 | $115.08 | $165.00 | $100.00 |
| 0057 | Riprap, revetment (616-06405) | TON | 135 | $56.00 | $112.04 | $100.00 | $135.11 |
| 0058 | Geotextile for riprap, type 1A (616-12246) | SYS | 420 | $8.00 | $4.20 | $2.52 | $25.44 |
| 0059 | Water (621-06567) | KGAL | 17 | $42.00 | $0.01 | $0.01 | $2.00 |
| 0060 | Sodding, nursery (621-06575) | SYS | 4,050 | $6.00 | $8.00 | $13.00 | $5.84 |
| 0061 | Plant, coniferous evergreen, cone, broad upright, 36 in. or under (622-05623) | EACH | 38 | $116.00 | $200.00 | $270.00 | $225.00 |
| 0062 | Plant, deciduous shrub, 18 in. to 24 in. (622-05639) | EACH | 4 | $70.00 | $175.00 | $230.00 | $198.00 |
| 0063 | Computer system equipment (628-11976) | EACH | 4 | $3,344.00 | $1,500.00 | $750.00 | $2,160.00 |
| 0064 | Field office, type D (628-12683) | MOS | 48 | $3,367.00 | $3,238.81 | $4,500.00 | $4,118.33 |
| 0065 | Topsoil processing and distribution (629-000149) | SYS | 4,050 | $7.00 | $12.95 | $29.00 | $16.37 |
| 0066 | Topsoil amendment budget (629-000150) | DOL | 8,100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0067 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 4,060 | $10.00 | $28.00 | $14.00 | $10.50 |
| 0068 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 633 | $26.00 | $60.00 | $33.00 | $25.00 |
| 0069 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 116 | $133.00 | $170.00 | $110.00 | $170.00 |
| 0070 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 98 | $165.00 | $220.00 | $190.00 | $143.00 |
| 0071 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 96 | $99.00 | $115.00 | $84.00 | $110.00 |
| 0072 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 553 | $139.00 | $177.00 | $150.00 | $155.00 |
| 0073 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 70 | $109.00 | $150.00 | $94.00 | $100.00 |
| 0074 | Video inspection for pipe (715-09064) | LFT | 1,000 | $2.00 | $3.25 | $4.25 | $3.25 |
| 0075 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $1,287.00 | $850.00 | $1,500.00 | $2,000.00 |
| 0076 | Pipe end section, diameter 24 in. (715-46020) | EACH | 3 | $1,756.00 | $1,500.00 | $2,600.00 | $2,500.00 |
| 0077 | Outlet protector, type 2 (718-06529) | EACH | 10 | $1,302.00 | $3,500.00 | $2,000.00 | $1,500.00 |
| 0078 | Video inspection for underdrain (718-06532) | LFT | 4,060 | $2.00 | $1.25 | $1.75 | $1.25 |
| 0079 | Geotextile for underdrains, type 1A (718-12305) | SYS | 4,060 | $3.00 | $2.08 | $1.75 | $1.35 |
| 0080 | Aggregate for underdrains (718-52610) | CYS | 391 | $51.00 | $103.84 | $87.00 | $75.00 |
| 0081 | Pipe catch basin, 12 in. (720-45260) | EACH | 1 | $3,297.00 | $2,590.33 | $2,800.00 | $2,767.62 |
| 0082 | Manhole, type C4 (720-45410) | EACH | 1 | $5,432.00 | $6,200.00 | $7,300.00 | $3,260.60 |
| 0083 | Manhole, type H4 (720-91973) | EACH | 1 | $8,609.00 | $6,000.00 | $7,100.00 | $4,377.15 |
| 0084 | Inlet, type C15 (720-98555) | EACH | 4 | $4,665.00 | $4,500.00 | $7,300.00 | $3,974.85 |
| 0085 | Road closure sign assembly (801-04308) | EACH | 14 | $427.00 | $368.00 | $490.00 | $200.00 |
| 0086 | Temporary pavement marking, 6 in. (801-06206) | LFT | 8,000 | $0.59 | $0.51 | $0.70 | $0.51 |
| 0087 | Detour route marker assembly (801-06625) | EACH | 40 | $236.00 | $203.00 | $270.00 | $144.50 |
| 0088 | Construction sign, type A (801-06640) | EACH | 73 | $505.00 | $435.00 | $480.00 | $44.38 |
| 0089 | Construction sign, type B (801-06645) | EACH | 10 | $106.00 | $91.00 | $120.00 | $100.00 |
| 0090 | Maintaining traffic (801-06775) | LS | 1 | $239,175 | $264,701 | $253,000 | $494,801 |
| 0091 | Barricade, type III-A (801-07118) | LFT | 85 | $20.00 | $17.00 | $23.00 | $15.00 |
| 0092 | Barricade, type III-B (801-07119) | LFT | 85 | $26.00 | $22.00 | $29.00 | $16.00 |
| 0093 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 425 | $41.00 | $35.00 | $53.00 | $17.17 |
| 0094 | Sign, sheet, and supports, remove (802-07059) | EACH | 17 | $145.00 | $200.00 | $110.00 | $90.90 |
| 0095 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 110 | $29.00 | $35.00 | $53.00 | $37.37 |
| 0096 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 95 | $33.00 | $37.00 | $60.00 | $24.24 |
| 0097 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $522.00 | $2,000.00 | $7,400.00 | $2,000.00 |
| 0098 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $2,322.00 | $2,200.00 | $3,700.00 | $2,200.00 |
| 0099 | Handhole, lighting (807-02191) | EACH | 5 | $3,758.00 | $1,600.00 | $2,400.00 | $1,600.00 |
| 0100 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 150 | $102.00 | $50.00 | $63.00 | $50.00 |
| 0101 | Luminaire, low lumen roadway (807-12202) | EACH | 15 | $1,707.00 | $750.00 | $1,300.00 | $750.00 |
| 0102 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 15 | $3,756.00 | $4,300.00 | $3,400.00 | $4,300.00 |
| 0103 | Light pole, 40 FT E.M.H., 10 FT mast arm, breakaway base (807-85752) | EACH | 15 | $13,182 | $5,500.00 | $6,200.00 | $5,500.00 |
| 0104 | Service point, type II (807-86810) | EACH | 1 | $21,579 | $11,000 | $13,400 | $11,000 |
| 0105 | Connector kit, unfused (807-86910) | EACH | 15 | $307.00 | $70.00 | $99.00 | $70.00 |
| 0106 | Connector kit, fused (807-86915) | EACH | 15 | $423.00 | $70.00 | $92.00 | $70.00 |
| 0107 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 5 | $1,400.00 | $35.00 | $62.00 | $35.00 |
| 0108 | Multiple compression fitting, waterproofed (807-86925) | EACH | 15 | $294.00 | $70.00 | $62.00 | $70.00 |
| 0109 | Insulation link, non- waterproofed (807-86930) | EACH | 5 | $644.00 | $35.00 | $38.00 | $35.00 |
| 0110 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 2,800 | $29.00 | $28.00 | $28.00 | $28.00 |
| 0111 | Line, remove (808-06716) | LFT | 500 | $0.95 | $0.82 | $1.00 | $0.82 |
| 0112 | Line, multi-component, solid, white, 8 in. (808-10037) | LFT | 240 | $3.00 | $2.75 | $4.00 | $2.75 |
| 0113 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 2,546 | $2.00 | $1.40 | $2.75 | $1.40 |
| 0114 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,280 | $2.00 | $1.40 | $2.75 | $1.40 |
| 0115 | Line, multi-component, solid, yellow, 8 in. (808-10058) | LFT | 2,740 | $3.00 | $2.75 | $4.00 | $2.75 |
| 0116 | Grooving for pavement markings (808-12032) | LFT | 4,020 | $2.00 | $1.74 | $2.25 | $1.74 |
| 0117 | Transverse marking, thermoplastic, yield line, white, 36 in. (808-12148) | LFT | 80 | $38.00 | $32.45 | $43.00 | $32.45 |
| 0118 | Line, multi-component, dotted, white, 12 in. (808-12700) | LFT | 100 | $3.00 | $2.50 | $6.75 | $2.50 |
| 0119 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 300 | $8.00 | $6.60 | $8.75 | $6.60 |
| 0120 | Snowplowable raised pavement marker (808-75998) | EACH | 83 | $109.00 | $93.95 | $120.00 | $93.95 |
| 0121 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 5 | $725.00 | $1,677.82 | $7,200.00 | $1.00 |
| 0122 | Temporary pavement marking, 8 in. (801-06586) | LFT | 4,000 | $0.67 | $0.58 | $0.80 | $0.58 |
| 0123 | Luminaire , solar high lumen (807-04866) | EACH | 1 | $29,490 | $14,500 | $31,700 | $14,500 |
| 0124 | Luminaire , solar low lumen (807-04866) | EACH | 1 | $29,490 | $14,500 | $31,700 | $14,500 |
| 0125 | Center curb, concrete, type A (605-06240) | SYS | 755 | $203.00 | $211.39 | $200.00 | $270.75 |
| 0126 | Milled PCCP corrugations, conventional (606-11064) | LFT | 360 | $22.00 | $17.93 | $4.00 | $19.16 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.