INDOT contract R-45561-A bid tabulation
SMALL STRUCTURE PIPE LINING. Let by Indiana DOT on September 2, 2026, Clinton, White, Crawfordsville. 5 bids received; low bid $3,057,296 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 48
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $3,057,296 | Low |
| 2 | Infrastructure Systems Inc | $3,444,435 | +13% |
| 3 | Temple & Temple Excavating & Paving Inc | $3,687,163 | +21% |
| 4 | Louisville Paving Co | $3,798,454 | +24% |
| 5 | Yarberry Companies Inc | $4,054,644 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. Infrastructure Systems Inc | 3. Temple & Temple Excavating & Paving Inc | 4. Louisville Paving Co | 5. Yarberry Companies Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,000 | $6,000.00 | $6,000.00 | $10,000 | $15,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $100,000 | $75,000 | $158,400 | $230,000 | $200,000 |
| 0009 | Clearing right-of-way (201-52370) | LS | 1 | $20,000 | $7,500.00 | $6,800.00 | $28,500 | $25,000 |
| 0010 | Fence, farm field, remove (202-99187) | LFT | 90 | $2.00 | $25.00 | $47.00 | $10.00 | $30.00 |
| 0011 | Excavation, common (203-02000) | CYS | 265 | $50.00 | $95.00 | $42.00 | $75.00 | $100.00 |
| 0012 | Borrow (203-02070) | CYS | 285 | $25.00 | $105.00 | $76.00 | $75.00 | $100.00 |
| 0013 | Pump around (205-11626) | EACH | 2 | $35,000 | $15,000 | $50,000 | $50,000 | $30,000 |
| 0014 | Stormwater management budget (205-12108) | DOL | 37,391 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $2,000.00 | $14,500 | $38,000 | $68,955 | $20,000 |
| 0016 | Excavation, wet (206-51220) | CYS | 175 | $110.00 | $65.00 | $75.00 | $100.00 | $150.00 |
| 0017 | Structure backfill, type 2 (211-09265) | CYS | 310 | $45.00 | $165.00 | $150.00 | $125.00 | $100.00 |
| 0018 | Compacted aggregate, no. 8 (301-12233) | CYS | 19 | $80.00 | $175.00 | $150.00 | $220.00 | $100.00 |
| 0019 | Fence, farm field, reset (603-06060) | LFT | 86 | $5.00 | $30.00 | $87.00 | $100.00 | $36.00 |
| 0020 | Riprap, class 1 (616-05688) | TON | 502 | $145.00 | $175.00 | $200.00 | $200.00 | $175.00 |
| 0021 | Riprap, revetment (616-06405) | TON | 298 | $100.00 | $130.00 | $150.00 | $75.00 | $150.00 |
| 0022 | Geotextile for riprap, type 1A (616-12246) | SYS | 950 | $3.00 | $5.00 | $6.00 | $5.00 | $15.00 |
| 0023 | Geotextile for riprap, type 2A (616-12248) | SYS | 48 | $7.00 | $5.00 | $11.00 | $5.00 | $15.00 |
| 0024 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $500.00 | $400.00 | $450.00 | $500.00 | $750.00 |
| 0025 | Erosion control blanket (621-02770) | SYS | 1,436 | $3.50 | $2.00 | $2.00 | $2.00 | $7.00 |
| 0026 | Mulched seeding, type R (621-06559) | SYS | 2,373 | $5.00 | $3.00 | $4.00 | $4.00 | $2.00 |
| 0027 | Field office, type C (628-09403) | MOS | 12 | $1,500.00 | $3,250.00 | $3,360.00 | $3,500.00 | $5,500.00 |
| 0028 | Mobile internet service , 1 each (628-09409) | MOS | 12 | $100.00 | $200.00 | $168.00 | $200.00 | $200.00 |
| 0029 | Computer system equipment (628-11976) | EACH | 2 | $600.00 | $700.00 | $2,800.00 | $800.00 | $1,500.00 |
| 0030 | Computer system (628-11977) | EACH | 1 | $1,600.00 | $3,300.00 | $2,800.00 | $3,500.00 | $2,000.00 |
| 0031 | Concrete, A, substructure (702-51005) | CYS | 27.30 | $2,000.00 | $2,300.00 | $3,000.00 | $2,225.00 | $5,000.00 |
| 0032 | Concrete, B, footings (702-51015) | CYS | 24.90 | $1,350.00 | $2,800.00 | $2,000.00 | $2,075.00 | $1,100.00 |
| 0033 | Reinforcing bars, epoxy coated (703-06029) | LBS | 5,752 | $8.00 | $3.50 | $5.00 | $4.00 | $7.00 |
| 0034 | Pipe installation, trenchless, 30 in. (716-07634) | LFT | 295 | $810.00 | $1,365.00 | $1,460.00 | $1,200.00 | $1,200.00 |
| 0035 | Liner pipe, thermoplastic, circular, 62.3-63.7 SFT (725-11985) | LFT | 295 | $2,165.00 | $2,400.00 | $2,457.63 | $2,400.00 | $2,372.00 |
| 0036 | Liner pipe, infrasteel , 12.20 FT X 7.81 FT, I.D. (725-12011) | LFT | 312 | $4,545.00 | $4,810.00 | $4,754.25 | $5,000.00 | $5,782.00 |
| 0037 | Detour route marker assembly (801-06625) | EACH | 15 | $125.00 | $135.00 | $112.00 | $150.00 | $120.00 |
| 0038 | Construction sign, type A (801-06640) | EACH | 57 | $140.00 | $155.00 | $224.00 | $250.00 | $195.00 |
| 0039 | Construction sign, type B (801-06645) | EACH | 14 | $125.00 | $135.00 | $84.00 | $100.00 | $120.00 |
| 0040 | Flashing arrow sign (801-06710) | DAY | 60 | $15.00 | $17.00 | $28.00 | $50.00 | $40.00 |
| 0041 | Maintaining traffic (801-06775) | LS | 1 | $7,946.20 | $3,500.00 | $20,160 | $47,000 | $65,000 |
| 0042 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $6,000.00 | $7,500.00 | $7,650.00 | $4,000.00 | $8,000.00 |
| 0043 | Barricade, type III-A (801-07118) | LFT | 60 | $18.00 | $20.00 | $18.00 | $20.00 | $16.00 |
| 0044 | Temporary traffic barrier, type 2 (801-08401) | LFT | 2,060 | $40.00 | $38.00 | $35.00 | $50.00 | $45.00 |
| 0045 | Portable changeable message sign (801-11642) | EACH | 4 | $2,600.00 | $2,800.00 | $5,600.00 | $5,000.00 | $4,500.00 |
| 0046 | Truck mounted attenuator (801-12042) | DAY | 8 | $600.00 | $1,700.00 | $280.00 | $600.00 | $650.00 |
| 0047 | Law enforcement officer (801-12324) | HRS | 520 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0048 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 8 | $500.00 | $600.00 | $1,680.00 | $1,500.00 | $950.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.