INDOT contract B-44972-A bid tabulation
SCOUR PROTECTION. Let by Indiana DOT on October 7, 2026, Harrison, Seymour. 7 bids received; low bid $198,900 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 27
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $198,900 | Low |
| 2 | Libs Paving Company Inc | $208,793 | +5.0% |
| 3 | 5 Star Company Inc | $210,847 | +6.0% |
| 4 | Ragle, Inc. | $231,575 | +16% |
| 5 | Lutgring Bros Inc | $234,500 | +18% |
| 6 | Morphey Construction Inc. | $320,000 | +61% |
| 7 | Yarberry Companies Inc | $339,165 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Libs Paving Company Inc | 3. 5 Star Company Inc | 4. Ragle, Inc. | 5. Lutgring Bros Inc | 6. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $5,500.00 | $5,000.00 | $7,800.00 | $5,000.00 | $3,500.00 | $7,500.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $9,800.00 | $10,000 | $21,500 | $9,000.00 | $11,481 | $16,000 |
| 0008 | Clearing right-of-way (201-52370) | LS | 1 | $4,000.00 | $8,000.00 | $2,200.00 | $8,000.00 | $5,000.00 | $15,000 |
| 0009 | Paved side ditch, remove (202-02272) | LFT | 488 | $25.00 | $21.00 | $17.00 | $40.00 | $27.00 | $135.00 |
| 0010 | Post, remove (202-94747) | EACH | 3 | $200.00 | $25.00 | $50.00 | $400.00 | $175.00 | $300.00 |
| 0011 | Excavation, common (203-02000) | CYS | 82 | $100.00 | $180.00 | $40.00 | $100.00 | $140.00 | $88.00 |
| 0012 | Stormwater management budget (205-12108) | DOL | 3,072 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Stormwater management implementation (205-12616) | LS | 1 | $7,500.00 | $4,000.00 | $1,500.00 | $1,500.00 | $6,000.00 | $950.00 |
| 0015 | Guardrail, reset (601-06035) | LFT | 435 | $23.00 | $36.00 | $20.00 | $30.00 | $23.00 | $23.00 |
| 0016 | Riprap, revetment (616-06405) | TON | 326 | $110.00 | $120.00 | $100.00 | $150.00 | $175.00 | $150.00 |
| 0017 | Geotextile for riprap, type 1A (616-12246) | SYS | 760 | $1.50 | $2.00 | $4.00 | $5.00 | $9.00 | $8.00 |
| 0018 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,500.00 | $1,100.00 | $1,100.00 | $795.00 | $975.00 | $500.00 |
| 0019 | Mulched seeding, type R (621-06559) | SYS | 922 | $2.25 | $1.50 | $2.00 | $1.88 | $4.80 | $12.00 |
| 0020 | Field office, type C (628-09403) | MOS | 12 | $2,200.00 | $3,400.00 | $2,100.00 | $2,000.00 | $1,600.00 | $2,200.00 |
| 0021 | Computer system equipment (628-11976) | EACH | 2 | $750.00 | $900.00 | $500.00 | $750.00 | $1,300.00 | $800.00 |
| 0022 | Construction sign, type A (801-06640) | EACH | 8 | $369.00 | $200.00 | $250.00 | $250.00 | $369.00 | $250.00 |
| 0023 | Construction sign, type B (801-06645) | EACH | 2 | $204.00 | $150.00 | $105.00 | $100.00 | $204.00 | $100.00 |
| 0024 | Maintaining traffic (801-06775) | LS | 1 | $20,646 | $10,000 | $34,850 | $40,000 | $14,368 | $30,828 |
| 0025 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $11,300 | $9,800.00 | $13,500 | $12,000 | $11,300 | $11,300 |
| 0026 | Temporary traffic barrier, type 2 (801-08401) | LFT | 300 | $70.00 | $65.00 | $78.00 | $50.00 | $123.00 | $140.00 |
| 0027 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $569.00 | $500.00 | $500.00 | $400.00 | $569.00 | $400.00 |
| 0028 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $400.00 | $125.00 | $550.00 | $150.00 | $400.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.