INDOT contract R-42790-A bid tabulation
ROAD REHABILITATION. Let by Indiana DOT on February 12, 2025, Washington, Seymour. 5 bids received; low bid $2,724,331 by Temple & Temple Excavating & Paving Inc.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 150
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Temple & Temple Excavating & Paving Inc | $2,724,331 | Low |
| 2 | Mac Construction & Excavating Inc | $2,886,000 | +6.0% |
| 3 | Libs Paving Company Inc | $2,957,921 | +9.0% |
| 4 | Milestone Contractors LP | $3,045,813 | +12% |
| 5 | E & B Paving LLC | $3,321,600 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Temple & Temple Excavating & Paving Inc | 2. Mac Construction & Excavating Inc | 3. Libs Paving Company Inc | 4. Milestone Contractors LP | 5. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $50,000 | $40,000 | $25,000 | $28,000 | $75,000 |
| 0002 | Construction engineering and inspection utility relocation (105-09645) | LS | 1 | $70,000 | $220,000 | $20,000 | $12,000 | $125,000 |
| 0003 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 1 | $900.00 | $1,500.00 | $2,400.00 | $2,750.00 | $3,500.00 |
| 0004 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 1 | $600.00 | $1,500.00 | $1,400.00 | $3,000.00 | $3,500.00 |
| 0005 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $159,000 | $140,000 | $145,000 | $151,500 | $160,000 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $25,000 | $130,000 | $10,000 | $59,600 | $32,000 |
| 0014 | Pavement removal (202-02240) | SYS | 785 | $18.00 | $20.00 | $22.00 | $25.00 | $35.00 |
| 0015 | Curb, concrete, remove (202-02278) | LFT | 1,730 | $16.00 | $12.50 | $45.00 | $15.00 | $17.50 |
| 0016 | Curb and gutter, remove (202-02279) | LFT | 207 | $20.00 | $17.50 | $45.00 | $21.00 | $33.50 |
| 0017 | Contaminated soil, remove (202-06580) | CYS | 118 | $250.00 | $235.00 | $300.00 | $390.00 | $365.00 |
| 0018 | Sidewalk concrete, remove (202-52710) | SYS | 2,012 | $30.00 | $10.50 | $77.00 | $27.00 | $23.00 |
| 0019 | Inlet, remove (202-91385) | EACH | 14 | $600.00 | $425.00 | $1,000.00 | $650.00 | $1,000.00 |
| 0020 | Manhole, remove (202-93047) | EACH | 1 | $850.00 | $850.00 | $2,000.00 | $1,600.00 | $1,000.00 |
| 0021 | Pipe, remove (202-96133) | LFT | 872 | $30.00 | $25.00 | $28.00 | $12.00 | $30.00 |
| 0022 | Foundation, street light, remove (202-96328) | EACH | 4 | $380.00 | $450.00 | $850.00 | $400.00 | $1,670.00 |
| 0023 | Excavation, common (203-02000) | CYS | 766 | $30.00 | $45.00 | $110.00 | $80.00 | $80.00 |
| 0024 | Excavation, rock (203-02010) | CYS | 56 | $300.00 | $250.00 | $300.00 | $140.00 | $140.00 |
| 0025 | Stormwater management budget (205-12108) | DOL | 5,231 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0026 | Stormwater management implementation (205-12616) | LS | 1 | $5,000.00 | $35,000 | $7,000.00 | $6,612.89 | $65,000 |
| 0027 | Excavation, X (206-51215) | CYS | 3 | $875.00 | $750.00 | $750.00 | $1,200.00 | $750.00 |
| 0028 | Subgrade treatment, type II (207-08264) | SYS | 748 | $34.00 | $35.00 | $78.00 | $32.00 | $50.00 |
| 0029 | Subgrade treatment, type IC (207-09935) | SYS | 1,041 | $40.00 | $33.00 | $32.00 | $48.00 | $48.00 |
| 0030 | B borrow (211-02050) | CYS | 158 | $60.00 | $100.00 | $95.00 | $80.00 | $120.00 |
| 0031 | Structure backfill, type 2 (211-09265) | CYS | 994 | $75.00 | $65.00 | $60.00 | $70.00 | $55.00 |
| 0032 | Geogrid, type IB (214-11796) | SYS | 748 | $5.00 | $2.00 | $1.50 | $3.00 | $4.80 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 216 | $80.00 | $175.00 | $300.00 | $155.00 | $175.00 |
| 0034 | Dense graded subbase (302-07455) | CYS | 132 | $90.00 | $170.00 | $290.00 | $155.00 | $170.00 |
| 0035 | HMA patching, full depth, type C (304-12625) | TON | 130 | $175.00 | $350.00 | $420.00 | $220.00 | $375.00 |
| 0036 | HMA patching, partial depth, type C (304-12626) | TON | 10 | $175.00 | $750.00 | $400.00 | $520.00 | $400.00 |
| 0037 | PCC base, 4 in. (305-08445) | SYS | 42 | $125.00 | $103.00 | $103.00 | $290.00 | $103.00 |
| 0038 | Milling, asphalt, 2 in. (306-08036) | SYS | 6,665 | $3.00 | $3.70 | $4.00 | $6.00 | $4.00 |
| 0039 | Milling, asphalt, 4 in. (306-08038) | SYS | 42 | $5.00 | $90.00 | $73.00 | $45.00 | $55.00 |
| 0040 | Milling, approach (306-08432) | SYS | 620 | $5.00 | $3.70 | $4.00 | $6.00 | $10.00 |
| 0041 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 814 | $125.00 | $120.00 | $140.00 | $170.00 | $105.00 |
| 0042 | QC/QA-HMA, 2, 58H, intermediate, 19.0 MM (401-000040) | TON | 99 | $155.00 | $150.00 | $180.00 | $215.00 | $130.00 |
| 0043 | QC/QA-HMA, 2, 58S, base, 19.0 MM (401-000052) | TON | 138 | $155.00 | $130.00 | $160.00 | $170.00 | $130.00 |
| 0044 | Joint adhesive, surface (401-10258) | LFT | 5,148 | $0.01 | $0.50 | $1.00 | $1.00 | $0.01 |
| 0045 | Joint adhesive, intermediate (401-10259) | LFT | 471 | $0.01 | $0.50 | $2.00 | $1.00 | $0.01 |
| 0046 | Liquid asphalt sealant (401-11785) | LFT | 5,148 | $0.01 | $0.25 | $0.01 | $1.00 | $0.01 |
| 0047 | HMA wedge and level, type C (402-07452) | TON | 40 | $175.00 | $130.00 | $240.00 | $182.00 | $150.00 |
| 0048 | Asphalt for tack coat (406-05520) | TON | 3 | $2.00 | $0.01 | $1,000.00 | $780.00 | $1.00 |
| 0049 | Fence , decorative, 30 inch (603-03829) | LFT | 120 | $500.00 | $566.50 | $566.50 | $575.00 | $566.50 |
| 0050 | Pavers (604-04740) | SFT | 389 | $55.00 | $49.32 | $110.00 | $41.00 | $125.00 |
| 0051 | Sidewalk, concrete (604-06070) | SYS | 1,616 | $64.00 | $54.00 | $54.00 | $95.00 | $54.00 |
| 0052 | Sidewalk, concrete , modified (604-06070) | SYS | 366 | $85.00 | $72.00 | $72.00 | $109.00 | $72.00 |
| 0053 | Curb ramp, concrete (604-08086) | SYS | 236 | $125.00 | $105.00 | $105.00 | $255.00 | $105.00 |
| 0054 | Detectable warning surfaces (604-12083) | SYS | 34 | $265.00 | $221.00 | $221.00 | $300.00 | $221.00 |
| 0055 | Steps, concrete (604-44251) | CYS | 65 | $350.00 | $295.00 | $295.00 | $1,650.00 | $295.00 |
| 0056 | Curb, concrete , modified (605-06120) | LFT | 291 | $45.00 | $39.00 | $39.00 | $85.00 | $39.00 |
| 0057 | Curb and gutter, concrete , modified (605-06140) | LFT | 2,521 | $45.00 | $32.00 | $32.00 | $65.00 | $32.00 |
| 0058 | HMA for approaches, type C (610-07488) | TON | 73 | $155.00 | $190.00 | $260.00 | $368.00 | $130.00 |
| 0059 | PCCP for approaches, 9 in. (610-09108) | SYS | 748 | $112.00 | $94.00 | $94.00 | $132.00 | $94.00 |
| 0060 | Riprap, revetment (616-06405) | TON | 18 | $110.00 | $114.21 | $130.00 | $105.00 | $160.00 |
| 0061 | Geotextile for riprap, type 2B (616-12249) | SYS | 23 | $5.00 | $80.00 | $60.00 | $70.00 | $20.00 |
| 0062 | Bench (618-03812) | EACH | 6 | $2,500.00 | $2,450.00 | $2,450.00 | $3,000.00 | $2,450.00 |
| 0063 | Trash receptacle , reset (618-97672) | EACH | 4 | $1,500.00 | $1,250.00 | $1,500.00 | $280.00 | $1,050.00 |
| 0064 | Water (621-06567) | KGAL | 4 | $1.00 | $2.00 | $2.00 | $1.00 | $2.00 |
| 0065 | Topsoil (621-06570) | CYS | 334 | $60.00 | $121.80 | $121.80 | $128.00 | $121.80 |
| 0066 | Sodding, nursery (621-06575) | SYS | 1,000 | $15.00 | $9.24 | $9.24 | $12.00 | $9.24 |
| 0067 | Compost amended soil (621-07762) | CYS | 16 | $230.00 | $341.00 | $341.00 | $139.00 | $341.00 |
| 0068 | Mulch, hardwood shredded bark (621-98038) | CYS | 2 | $725.00 | $118.00 | $118.00 | $600.00 | $118.00 |
| 0069 | Plant, deciduous shrub, 18 in. to 24 in. (622-05639) | EACH | 28 | $385.00 | $290.00 | $290.00 | $325.00 | $290.00 |
| 0070 | Plant, perennial (622-05654) | EACH | 149 | $48.00 | $102.20 | $102.20 | $40.00 | $102.20 |
| 0071 | Field office, type C (628-09403) | MOS | 10 | $2,400.00 | $2,685.00 | $3,000.00 | $3,600.00 | $3,100.00 |
| 0072 | Computer system equipment (628-11976) | EACH | 3 | $1,200.00 | $1,950.00 | $1,000.00 | $900.00 | $700.00 |
| 0073 | Cored hole in concrete (702-03607) | EACH | 11 | $1,000.00 | $850.00 | $100.00 | $405.00 | $500.00 |
| 0074 | Concrete, A (702-90915) | CYS | 94 | $220.00 | $300.00 | $183.00 | $350.00 | $183.00 |
| 0075 | Concrete, C , concrete cradle for utilities (702-93722) | CYS | 2 | $655.00 | $550.00 | $2,500.00 | $1,790.00 | $2,500.00 |
| 0076 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 1,501 | $80.00 | $100.00 | $94.00 | $112.00 | $157.00 |
| 0077 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 337 | $90.00 | $125.00 | $103.00 | $133.00 | $160.00 |
| 0078 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 209 | $110.00 | $150.00 | $144.00 | $220.00 | $240.00 |
| 0079 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 219 | $140.00 | $200.00 | $170.00 | $269.00 | $310.00 |
| 0080 | HMA for structure installation, type C (715-08306) | TON | 230 | $300.00 | $303.60 | $187.00 | $213.00 | $180.00 |
| 0081 | Video inspection for pipe (715-09064) | LFT | 2,266 | $5.00 | $1.25 | $1.25 | $2.00 | $1.25 |
| 0082 | Pipe PVC, 4 in. (715-92037) | LFT | 106 | $95.00 | $125.00 | $120.00 | $100.00 | $100.00 |
| 0083 | Adjust monitoring well to grade (720-01888) | EACH | 2 | $2,700.00 | $2,000.00 | $2,500.00 | $950.00 | $1,150.00 |
| 0084 | Pipe, plug existing (720-02442) | EACH | 16 | $1,100.00 | $1,200.00 | $1,500.00 | $1,500.00 | $3,725.05 |
| 0085 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $1,400.00 | $1,200.00 | $1,000.00 | $1,300.00 | $2,800.00 |
| 0086 | Inlet, type A2 (720-45005) | EACH | 2 | $4,200.00 | $4,500.00 | $7,400.00 | $3,500.00 | $5,400.00 |
| 0087 | Inlet, type J10 (720-45045) | EACH | 1 | $5,000.00 | $4,800.00 | $9,500.00 | $4,500.00 | $5,450.00 |
| 0088 | Inlet, type M10 (720-45055) | EACH | 3 | $4,500.00 | $4,800.00 | $7,500.00 | $4,300.00 | $5,450.00 |
| 0089 | Inlet, type R13 (720-45075) | EACH | 2 | $4,300.00 | $4,650.00 | $7,400.00 | $4,700.00 | $5,600.00 |
| 0090 | Inlet, type F7, modified (720-45135) | EACH | 1 | $5,000.00 | $4,400.00 | $8,900.00 | $4,300.00 | $5,550.00 |
| 0091 | Inlet, type J10, modified (720-45145) | EACH | 1 | $3,700.00 | $4,925.00 | $9,400.00 | $4,500.00 | $5,600.00 |
| 0092 | Inlet, type M10, modified (720-45155) | EACH | 7 | $3,800.00 | $5,200.00 | $7,500.00 | $4,700.00 | $5,650.00 |
| 0093 | Manhole, type C4 (720-45410) | EACH | 1 | $5,400.00 | $4,500.00 | $8,100.00 | $5,400.00 | $6,350.00 |
| 0094 | Manhole, type C4, modified (720-45510) | EACH | 1 | $6,200.00 | $5,500.00 | $8,300.00 | $5,500.00 | $6,400.00 |
| 0095 | Manhole, type C8 (720-90349) | EACH | 3 | $6,200.00 | $4,925.00 | $7,900.00 | $5,800.00 | $6,900.00 |
| 0096 | Inlet, type B15, modified (720-93409) | EACH | 2 | $5,000.00 | $5,950.00 | $8,100.00 | $5,200.00 | $6,550.00 |
| 0097 | Inlet, type C15, modified (720-93411) | EACH | 2 | $5,400.00 | $6,000.00 | $7,600.00 | $7,700.00 | $6,575.00 |
| 0098 | Casting, water valve, adjust to grade (720-94840) | EACH | 9 | $550.00 | $425.00 | $950.00 | $750.00 | $1,600.00 |
| 0099 | Casting, water meter, adjust to grade (720-94841) | EACH | 15 | $550.00 | $345.00 | $2,000.00 | $1,000.00 | $1,625.00 |
| 0100 | Manhole, type J4 (720-95422) | EACH | 2 | $8,000.00 | $6,350.00 | $9,700.00 | $6,000.00 | $7,100.00 |
| 0101 | Manhole, type J8 (720-98006) | EACH | 2 | $8,000.00 | $6,500.00 | $10,100 | $6,300.00 | $7,600.00 |
| 0102 | Inlet, type B15 (720-98174) | EACH | 1 | $4,500.00 | $5,975.00 | $9,700.00 | $5,200.00 | $5,900.00 |
| 0103 | Inlet, type C15 (720-98555) | EACH | 2 | $4,500.00 | $5,975.00 | $8,300.00 | $5,700.00 | $6,100.00 |
| 0104 | Road closure sign assembly (801-04308) | EACH | 6 | $210.00 | $127.00 | $265.00 | $265.00 | $265.00 |
| 0105 | Temporary pavement marking, 4 in. (801-06203) | LFT | 2,934 | $12.00 | $1.37 | $0.30 | $0.30 | $0.30 |
| 0106 | Temporary pavement marking, 6 in. (801-06206) | LFT | 1,121 | $1.50 | $2.99 | $0.40 | $0.40 | $0.40 |
| 0107 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 3,243 | $1.50 | $1.53 | $1.99 | $1.99 | $1.99 |
| 0108 | Detour route marker assembly (801-06625) | EACH | 12 | $100.00 | $138.00 | $69.00 | $69.00 | $69.00 |
| 0109 | Construction sign, type A (801-06640) | EACH | 40 | $180.00 | $101.00 | $145.00 | $145.00 | $145.00 |
| 0110 | Construction sign, type B (801-06645) | EACH | 52 | $80.00 | $54.00 | $69.00 | $69.00 | $69.00 |
| 0111 | Maintaining traffic (801-06775) | LS | 1 | $100,000 | $127,884 | $95,000 | $92,000 | $303,568 |
| 0112 | Barricade, type III-A (801-07118) | LFT | 120 | $16.00 | $7.00 | $10.00 | $10.00 | $10.00 |
| 0113 | Barricade, type III-B (801-07119) | LFT | 240 | $18.00 | $7.00 | $10.00 | $10.00 | $10.00 |
| 0114 | Portable changeable message sign (801-11642) | EACH | 2 | $6,000.00 | $5,498.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0115 | Temporary curb ramp (801-11990) | EACH | 20 | $3,000.00 | $2,225.00 | $2,200.00 | $1,300.00 | $3,800.00 |
| 0116 | Temporary accessible pedestrian path (801-12641) | SYS | 35 | $60.00 | $60.00 | $105.00 | $110.00 | $370.00 |
| 0117 | Temporary pedestrian channelizer (801-12862) | LFT | 284 | $60.00 | $21.00 | $20.00 | $50.00 | $20.00 |
| 0118 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 279 | $35.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0119 | Sign, sheet, and supports, remove (802-07059) | EACH | 16 | $175.00 | $80.00 | $80.00 | $150.00 | $80.00 |
| 0120 | Sign, sheet, relocate (802-07060) | EACH | 4 | $200.00 | $210.00 | $210.00 | $200.00 | $210.00 |
| 0121 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 128 | $30.00 | $28.00 | $28.00 | $30.00 | $28.00 |
| 0122 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 69 | $38.00 | $33.00 | $33.00 | $32.00 | $33.00 |
| 0123 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 2 | $2,250.00 | $1,900.00 | $1,900.00 | $2,200.00 | $1,900.00 |
| 0124 | Rectangular rapid flashing beacon , relocate (805-11799) | EACH | 2 | $3,200.00 | $2,680.00 | $2,680.00 | $2,900.00 | $2,680.00 |
| 0125 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 548 | $55.00 | $44.00 | $44.00 | $32.00 | $44.00 |
| 0126 | Handhole, lighting (807-02191) | EACH | 14 | $2,750.00 | $2,300.00 | $2,300.00 | $1,300.00 | $2,300.00 |
| 0127 | Light structure, remove (807-03934) | EACH | 4 | $725.00 | $600.00 | $600.00 | $1,000.00 | $600.00 |
| 0128 | Luminaire, ornamental (807-03950) | EACH | 20 | $2,200.00 | $1,800.00 | $1,800.00 | $1,500.00 | $1,800.00 |
| 0129 | Light pole, ornamental (807-03951) | EACH | 20 | $3,325.00 | $2,800.00 | $2,800.00 | $2,500.00 | $2,800.00 |
| 0130 | Lighting foundation , concrete, with grounding (807-04653) | EACH | 20 | $2,500.00 | $2,100.00 | $2,100.00 | $3,000.00 | $2,100.00 |
| 0131 | Wire, no. 6 copper, in plastic duct, 4 1/C (807-09637) | LFT | 548 | $30.00 | $22.50 | $22.50 | $21.00 | $22.50 |
| 0132 | Wire, no. 6 copper, in plastic duct, in trench, 4 1/C (807-09638) | LFT | 2,529 | $30.00 | $22.50 | $22.50 | $21.00 | $22.50 |
| 0133 | Service point, type I (807-86805) | EACH | 1 | $14,000 | $11,500 | $11,500 | $9,500.00 | $11,500 |
| 0134 | Connector kit, unfused (807-86910) | EACH | 20 | $85.00 | $72.00 | $72.00 | $50.00 | $72.00 |
| 0135 | Connector kit, fused (807-86915) | EACH | 20 | $85.00 | $72.00 | $72.00 | $50.00 | $72.00 |
| 0136 | Multiple compression fitting, waterproofed (807-86925) | EACH | 56 | $85.00 | $70.00 | $70.00 | $60.00 | $70.00 |
| 0137 | Insulation link, waterproofed (807-86935) | EACH | 100 | $50.00 | $40.00 | $40.00 | $60.00 | $40.00 |
| 0138 | Wire, TW/THW, no. 10 copper, stranded (807-87556) | LFT | 1,134 | $2.00 | $1.10 | $1.10 | $1.50 | $1.10 |
| 0139 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 100 | $15.00 | $7.89 | $5.95 | $5.95 | $5.95 |
| 0140 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 1,486 | $2.50 | $1.04 | $0.98 | $0.98 | $0.98 |
| 0141 | Line, remove (808-06716) | LFT | 2,532 | $1.00 | $1.07 | $0.95 | $0.95 | $0.95 |
| 0142 | Transverse marking, thermoplastic, yield line, white, 36 in. (808-12148) | LFT | 60 | $36.00 | $16.56 | $20.00 | $20.00 | $20.00 |
| 0143 | Curb painting , paint yellow for non-parking area (808-12448) | LFT | 717 | $4.00 | $6.08 | $1.95 | $1.95 | $1.95 |
| 0144 | Line, thermoplastic, broken, yellow, 4 in. (808-75240) | LFT | 408 | $3.00 | $2.72 | $0.95 | $0.95 | $0.95 |
| 0145 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 2,627 | $3.00 | $1.04 | $0.98 | $0.98 | $0.98 |
| 0146 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 190 | $10.00 | $3.95 | $2.95 | $2.95 | $2.95 |
| 0147 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 96 | $15.00 | $7.89 | $5.95 | $5.95 | $5.95 |
| 0148 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 557 | $6.00 | $1.98 | $1.45 | $1.45 | $1.45 |
| 0149 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 13 | $225.00 | $149.00 | $89.00 | $89.00 | $89.00 |
| 0150 | Pavement message marking, thermoplastic, "only" (808-75325) | EACH | 1 | $475.00 | $201.00 | $195.00 | $195.00 | $195.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.