INDOT contract B-44595-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on September 2, 2026, Carroll, Greenfield. 5 bids received; low bid $392,000 by Morphey Construction Inc..
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 50
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Morphey Construction Inc. | $392,000 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $416,252 | +6.0% |
| 3 | 3D Company Inc | $416,455 | +6.0% |
| 4 | Milestone Contractors LP | $433,692 | +11% |
| 5 | Deichman Excavating Co | $486,882 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Morphey Construction Inc. | 2. Rieth-Riley Construction Co., Inc. | 3. 3D Company Inc | 4. Milestone Contractors LP | 5. Deichman Excavating Co |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,000 | $6,500.00 | $10,235 | $12,143 | $7,000.00 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 3 | $800.00 | $1,900.00 | $1,405.00 | $700.00 | $750.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $19,600 | $48,000 | $37,070 | $26,000 | $38,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $7,840.00 | $10,000 | $21,708 | $25,000 | $10,000 |
| 0012 | Excavation, common (203-02000) | CYS | 60 | $120.00 | $125.00 | $383.15 | $110.00 | $250.00 |
| 0013 | Pump around (205-11626) | EACH | 1 | $1,000.00 | $8,900.00 | $9,559.00 | $3,400.00 | $40,000 |
| 0014 | Stormwater management budget (205-12108) | DOL | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $5,000.00 | $2,100.00 | $6,375.00 | $3,100.00 | $8,500.00 |
| 0016 | Subgrade treatment, type IC (207-09935) | SYS | 237 | $60.00 | $49.00 | $53.26 | $63.00 | $55.00 |
| 0017 | Structure backfill, type 2 (211-09265) | CYS | 410 | $90.00 | $125.00 | $60.06 | $70.00 | $90.00 |
| 0018 | Geotextile for pavement, type 2B (214-12239) | SYS | 237 | $5.00 | $5.50 | $8.46 | $5.00 | $11.00 |
| 0019 | Compacted aggregate, no. 8 (301-12233) | CYS | 58 | $150.00 | $140.00 | $100.25 | $118.00 | $215.00 |
| 0020 | Compacted aggregate, no. 53 (303-01180) | TON | 120 | $50.00 | $87.00 | $64.58 | $72.00 | $65.00 |
| 0021 | Milling, transition (306-08043) | SYS | 330 | $12.00 | $19.00 | $13.70 | $29.00 | $19.50 |
| 0022 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 48 | $240.00 | $197.00 | $264.00 | $305.00 | $234.30 |
| 0023 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 33 | $275.00 | $180.00 | $311.37 | $285.00 | $274.76 |
| 0024 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 78 | $175.00 | $180.00 | $193.20 | $175.00 | $172.12 |
| 0025 | Joint adhesive (401-11526) | LFT | 180 | $3.00 | $1.00 | $2.73 | $4.00 | $2.48 |
| 0026 | Asphalt for tack coat (406-05521) | SYS | 1,094 | $2.00 | $0.01 | $1.90 | $0.20 | $1.72 |
| 0027 | Guardrail, W-beam, cable terminal anchor (601-06855) | EACH | 1 | $950.00 | $950.00 | $1,045.00 | $950.00 | $950.00 |
| 0028 | Hand dig guardrail post holes (601-09238) | EACH | 4 | $106.00 | $106.00 | $116.60 | $106.00 | $106.00 |
| 0029 | Guardrail, MGS W-beam, 3 FT 1.5 in. spacing (601-12282) | LFT | 75 | $34.00 | $34.00 | $37.40 | $34.00 | $34.00 |
| 0030 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $2,900.00 | $2,900.00 | $3,190.00 | $2,900.00 | $2,900.00 |
| 0031 | Monument, type B (615-06505) | EACH | 2 | $750.00 | $750.00 | $825.00 | $750.00 | $750.00 |
| 0032 | Riprap, class 1 (616-05688) | TON | 106 | $140.00 | $105.00 | $114.44 | $98.00 | $135.00 |
| 0033 | Riprap, revetment (616-06405) | TON | 72 | $130.00 | $94.00 | $76.18 | $92.00 | $75.00 |
| 0034 | Geotextile for riprap, type 2A (616-12248) | SYS | 561 | $5.00 | $2.50 | $4.63 | $3.00 | $9.00 |
| 0035 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $400.00 | $400.00 | $605.00 | $400.00 | $400.00 |
| 0036 | Mulched seeding, type R (621-06559) | SYS | 532 | $14.00 | $2.98 | $5.09 | $3.00 | $2.98 |
| 0037 | Field office, type C (628-09403) | MOS | 6 | $2,000.00 | $6,200.00 | $3,648.00 | $5,000.00 | $5,800.00 |
| 0038 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,242 | $5.00 | $3.50 | $4.57 | $3.40 | $3.75 |
| 0039 | Structure, coated reinforced concrete, box sections, 5 FT X 4 FT (714-12807) | LFT | 73 | $1,980.00 | $1,560.00 | $1,597.00 | $2,150.00 | $1,950.00 |
| 0040 | Casting, manhole, adjust to grade (720-12798) | EACH | 1 | $1,200.00 | $1,350.00 | $536.89 | $1,100.00 | $1,500.00 |
| 0041 | Construction sign, type D (801-03291) | EACH | 2 | $250.00 | $200.00 | $258.50 | $235.00 | $200.00 |
| 0042 | Road closure sign assembly (801-04308) | EACH | 7 | $150.00 | $150.00 | $262.90 | $260.00 | $150.00 |
| 0043 | Detour route marker assembly (801-06625) | EACH | 52 | $75.00 | $75.00 | $141.90 | $150.00 | $75.00 |
| 0044 | Construction sign, type A (801-06640) | EACH | 27 | $175.00 | $175.00 | $204.60 | $190.00 | $175.00 |
| 0045 | Construction sign, type B (801-06645) | EACH | 2 | $50.00 | $50.00 | $102.30 | $95.00 | $50.00 |
| 0046 | Maintaining traffic (801-06775) | LS | 1 | $7,253.00 | $6,000.00 | $7,418.00 | $3,800.00 | $15,900 |
| 0047 | Barricade, type III-A (801-07118) | LFT | 48 | $10.00 | $10.00 | $15.28 | $15.00 | $10.00 |
| 0048 | Barricade, type III-B (801-07119) | LFT | 84 | $10.00 | $10.00 | $15.28 | $15.00 | $10.00 |
| 0049 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 340 | $3.00 | $3.00 | $1.63 | $2.00 | $3.00 |
| 0050 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 340 | $3.00 | $3.00 | $1.63 | $2.00 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.