INDOT contract B-45347-A bid tabulation
SCOUR PROTECTION. Let by Indiana DOT on July 8, 2026, Madison, Greenfield. 6 bids received; low bid $342,660 by 5 Star Company Inc.
- Owner
- Indiana DOT
- Letting
- 08 JUL 2026
- Pay items
- 37
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | 5 Star Company Inc | $342,660 | Low |
| 2 | E & B Paving LLC | $395,500 | +15% |
| 3 | Morphey Construction Inc. | $427,427 | +25% |
| 4 | 3D Company Inc | $466,192 | +36% |
| 5 | Superior Construction Co Inc | $476,788 | +39% |
| 6 | Midwest Paving LLC | $491,570 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. 5 Star Company Inc | 2. E & B Paving LLC | 3. Morphey Construction Inc. | 4. 3D Company Inc | 5. Superior Construction Co Inc | 6. Midwest Paving LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,000 | $2,800.00 | $7,500.00 | $6,780.00 | $25,000 | $25,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $25,000 | $53,585 | $25,000 | $25,325 | $23,000 | $38,401 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $25,000 | $200.00 | $20,000 | $10,805 | $4,500.00 | $25,000 |
| 0011 | Linear grading (203-08607) | LFT | 100 | $12.00 | $5.00 | $20.00 | $78.44 | $15.00 | $43.00 |
| 0012 | Stormwater management budget (205-12108) | DOL | 25,240 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Stormwater management implementation (205-12616) | LS | 1 | $2,500.00 | $2,000.00 | $3,500.00 | $8,575.00 | $5,500.98 | $22,000 |
| 0014 | Subgrade treatment, type IC (207-09935) | SYS | 200 | $35.00 | $40.00 | $55.00 | $103.65 | $40.00 | $60.00 |
| 0015 | HMA patching, full depth, type B (304-12623) | TON | 110 | $300.00 | $675.00 | $520.00 | $334.34 | $500.00 | $330.00 |
| 0016 | Joint adhesive (401-11526) | LFT | 650 | $1.00 | $0.50 | $1.00 | $2.15 | $0.75 | $0.50 |
| 0017 | Asphalt for tack coat (406-05521) | SYS | 200 | $3.00 | $0.60 | $1.00 | $7.98 | $0.60 | $0.01 |
| 0018 | Guardrail, reset (601-06035) | LFT | 200 | $20.00 | $12.00 | $22.00 | $49.74 | $12.00 | $29.00 |
| 0019 | Grout for riprap (616-02281) | CYS | 25 | $320.00 | $400.00 | $885.00 | $580.94 | $550.00 | $800.00 |
| 0020 | Riprap, class 1 (616-05688) | TON | 520 | $155.00 | $150.00 | $175.00 | $201.16 | $180.00 | $220.00 |
| 0021 | Riprap, revetment (616-06405) | TON | 16 | $165.00 | $200.00 | $175.00 | $275.78 | $1,000.00 | $120.00 |
| 0022 | Geotextile for riprap, type 1A (616-12246) | SYS | 730 | $3.20 | $5.00 | $4.00 | $4.47 | $3.50 | $1.30 |
| 0023 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $500.00 | $800.00 | $800.00 | $700.00 | $800.00 | $800.00 |
| 0024 | Erosion control blanket (621-02770) | SYS | 1,155 | $2.90 | $1.75 | $10.00 | $3.15 | $1.75 | $1.75 |
| 0025 | Mulched seeding, type R (621-06559) | SYS | 460 | $2.00 | $4.00 | $20.00 | $9.74 | $4.00 | $4.00 |
| 0026 | Mulching material (621-06565) | TON | 1 | $500.00 | $510.00 | $510.00 | $1,100.00 | $510.00 | $510.00 |
| 0027 | Seed mixture, floodplain (621-12612) | LBS | 5 | $100.00 | $300.00 | $950.00 | $369.40 | $300.00 | $300.00 |
| 0028 | Sign, 'DO not spray' (621-52448) | EACH | 4 | $210.00 | $100.00 | $100.00 | $279.00 | $100.00 | $100.00 |
| 0029 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 7,608 | $2.20 | $1.00 | $2.00 | $1.98 | $2.00 | $1.80 |
| 0030 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 2,672 | $3.30 | $2.00 | $2.50 | $2.75 | $3.00 | $2.50 |
| 0031 | Construction sign, type A (801-06640) | EACH | 30 | $215.00 | $180.00 | $180.00 | $198.00 | $200.00 | $180.00 |
| 0032 | Construction sign, type B (801-06645) | EACH | 2 | $111.00 | $100.00 | $100.00 | $110.00 | $100.00 | $100.00 |
| 0033 | Maintaining traffic (801-06775) | LS | 1 | $25,950 | $75,000 | $36,679 | $36,085 | $132,224 | $70,000 |
| 0034 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $9,650.00 | $2,000.00 | $6,125.00 | $11,188 | $7,400.00 | $7,300.00 |
| 0035 | Temporary traffic barrier, type 2 (801-08401) | LFT | 380 | $35.00 | $20.00 | $90.00 | $108.50 | $30.00 | $81.00 |
| 0036 | Truck mounted attenuator (801-12042) | DAY | 30 | $350.00 | $500.00 | $275.00 | $1,300.00 | $100.00 | $250.00 |
| 0037 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 4 | $375.00 | $800.00 | $1,250.00 | $880.00 | $350.00 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.