INDOT contract B-44074-A bid tabulation
SMALL STRUCTURES AND DRAINS CONSTRUCTION. Let by Indiana DOT on April 9, 2025, Henry, Greenfield. 5 bids received; low bid $283,864 by His Constructors Inc.
- Owner
- Indiana DOT
- Letting
- 09 APR 2025
- Pay items
- 52
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | His Constructors Inc | $283,864 | Low |
| 2 | Olco Inc | $289,942 | +2.0% |
| 3 | 3D Company Inc | $385,448 | +36% |
| 4 | Morphey Construction Inc. | $396,980 | +40% |
| 5 | Yarberry Companies Inc | $490,898 | +73% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. His Constructors Inc | 2. Olco Inc | 3. 3D Company Inc | 4. Morphey Construction Inc. | 5. Yarberry Companies Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $8,000.00 | $16,200 | $11,870 | $6,360.00 | $15,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $1,056.69 | $484.72 | $1,185.00 | $700.00 | $1,000.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $30,000 | $18,501 | $35,580 | $25,000 | $25,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $5,500.00 | $17,770 | $17,982 | $15,000 | $40,000 |
| 0012 | Headwall, remove (202-02271) | EACH | 2 | $754.50 | $1,734.48 | $4,435.00 | $3,000.00 | $1,000.00 |
| 0013 | Fence, farm field, remove (202-99187) | LFT | 22 | $115.71 | $20.55 | $24.49 | $56.00 | $15.00 |
| 0014 | Excavation, common (203-02000) | CYS | 280 | $64.13 | $82.10 | $121.79 | $90.00 | $150.00 |
| 0015 | Borrow (203-02070) | CYS | 38 | $74.58 | $88.23 | $1.00 | $65.00 | $100.00 |
| 0016 | Pump around (205-11626) | EACH | 1 | $15,000 | $6,780.32 | $6,095.00 | $21,000 | $35,000 |
| 0017 | Stormwater management budget (205-12108) | DOL | 12,232 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $5,000.00 | $13,362 | $7,385.00 | $800.00 | $8,000.00 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 37 | $70.15 | $66.25 | $67.39 | $95.00 | $100.00 |
| 0020 | Structure backfill, type 2 (211-09265) | CYS | 175 | $85.81 | $83.19 | $80.96 | $120.00 | $70.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 47 | $29.07 | $8.68 | $33.56 | $9.00 | $30.00 |
| 0022 | Compacted aggregate, no. 5 (301-12232) | CYS | 16 | $140.71 | $112.86 | $143.49 | $190.00 | $165.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 5 | $228.07 | $124.53 | $131.70 | $410.00 | $150.00 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 347 | $14.75 | $14.26 | $16.44 | $16.00 | $30.00 |
| 0025 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 32 | $529.40 | $225.78 | $551.10 | $501.00 | $300.00 |
| 0026 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 5 | $845.35 | $837.91 | $880.00 | $800.00 | $250.00 |
| 0027 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 11 | $845.35 | $377.20 | $880.00 | $800.00 | $200.00 |
| 0028 | Joint adhesive, surface (401-10258) | LFT | 130 | $0.01 | $2.49 | $1.10 | $0.01 | $5.00 |
| 0029 | Joint adhesive, intermediate (401-10259) | LFT | 10 | $0.01 | $26.04 | $11.00 | $0.01 | $5.00 |
| 0030 | Asphalt for tack coat (406-05520) | TON | 1 | $0.01 | $1,950.63 | $10.00 | $0.01 | $1,500.00 |
| 0031 | Fence, farm field, barbed wire , 48 inch (603-06042) | LFT | 63 | $60.23 | $77.83 | $65.89 | $57.00 | $65.00 |
| 0032 | Temporary fence (603-97461) | LFT | 64 | $48.61 | $40.70 | $53.75 | $46.00 | $10.00 |
| 0033 | Right-of-way marker (615-06490) | EACH | 13 | $369.84 | $296.53 | $405.00 | $350.00 | $385.00 |
| 0034 | Riprap, class 2 (616-05689) | TON | 43 | $132.08 | $129.59 | $170.55 | $200.00 | $150.00 |
| 0035 | Riprap, revetment (616-06405) | TON | 14 | $164.30 | $79.11 | $121.35 | $190.00 | $150.00 |
| 0036 | Riprap, uniform (616-06451) | TON | 307 | $87.99 | $66.51 | $88.25 | $190.00 | $110.00 |
| 0037 | Geotextile for riprap, type 1B (616-12247) | SYS | 676 | $3.33 | $5.85 | $5.25 | $5.00 | $15.00 |
| 0038 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $739.68 | $345.01 | $770.00 | $1,000.00 | $750.00 |
| 0039 | Mulched seeding, type R (621-06559) | SYS | 1,431 | $3.86 | $3.77 | $3.50 | $10.00 | $3.00 |
| 0040 | Field office, type C (628-09403) | MOS | 12 | $1,600.00 | $1,001.00 | $3,165.00 | $2,000.00 | $4,500.00 |
| 0041 | Computer system equipment (628-11976) | EACH | 1 | $660.96 | $520.00 | $1,980.00 | $800.00 | $2,000.00 |
| 0042 | Safety metal end section, 4:1, diameter 48 in. (715-02407) | EACH | 2 | $7,969.60 | $10,608 | $10,930 | $15,000 | $10,300 |
| 0043 | Pipe, type 1, circular, diameter 48 in. (715-05128) | LFT | 43 | $271.83 | $463.79 | $819.59 | $800.00 | $1,400.00 |
| 0044 | Geotextile for pipe, type 2B (715-12872) | SYS | 112 | $11.47 | $5.38 | $8.28 | $8.00 | $25.00 |
| 0045 | Road closure sign assembly (801-04308) | EACH | 4 | $175.41 | $125.00 | $183.00 | $166.00 | $150.00 |
| 0046 | Detour route marker assembly (801-06625) | EACH | 31 | $145.82 | $75.00 | $152.00 | $138.00 | $100.00 |
| 0047 | Construction sign, type A (801-06640) | EACH | 16 | $181.75 | $150.00 | $190.00 | $175.00 | $175.00 |
| 0048 | Maintaining traffic (801-06775) | LS | 1 | $8,435.33 | $18,652 | $21,957 | $16,151 | $40,000 |
| 0049 | Barricade, type III-A (801-07118) | LFT | 48 | $9.51 | $10.00 | $9.90 | $9.00 | $12.00 |
| 0050 | Grooving for pavement markings (808-12032) | LFT | 520 | $2.11 | $4.00 | $2.20 | $2.00 | $5.00 |
| 0051 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 260 | $2.11 | $4.00 | $2.20 | $2.00 | $5.00 |
| 0052 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 260 | $2.11 | $4.00 | $2.20 | $2.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 9, 2025. Compiled by Mirage Metrics.