INDOT contract R-42227-A bid tabulation

INTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE AND PED FACILITY. Let by Indiana DOT on November 5, 2026, Hamilton, Greenfield. 7 bids received; low bid $3,622,453 by Rieth-Riley Construction Co., Inc..

Owner
Indiana DOT
Letting
05 NOV 2026
Pay items
137
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rieth-Riley Construction Co., Inc.$3,622,453Low
2William Charles Construction Company$3,777,000+4.0%
3E & B Paving LLC$3,842,081+6.0%
4Milestone Contractors LP$3,970,000+10%
5Midwest Paving LLC$3,982,820+10%
6Morphey Construction Inc.$4,249,415+17%
7Calumet Civil Contractors Inc$4,600,000+27%
INDOT contract R-42227-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rieth-Riley Construction Co., Inc.2. William Charles Construction Company3. E & B Paving LLC4. Milestone Contractors LP5. Midwest Paving LLC6. Morphey Construction Inc.
0001Construction engineering (105-06845)LS1$29,750$82,000$76,133$40,000$29,750$50,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, PCCP (109-08441)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$126,982$183,078$190,443$186,013$197,667$213,150
0012Clearing right-of-way (201-52370)LS1$28,685$80,000$102,314$140,000$79,085$85,540
0013Conduit, remove (202-01845)LFT2,124$3.00$4.00$13.00$3.00$13.00$2.00
0014Pavement removal (202-02240)SYS2,504$19.45$23.00$26.00$25.00$41.60$39.00
0015Detector housing, remove (202-90277)EACH1$200.00$500.00$200.00$200.00$200.00$50.00
0016Inlet, remove (202-91385)EACH10$807.48$470.00$480.00$1,500.00$825.00$800.00
0017Light standard and foundation, remove (202-93763)EACH9$350.00$1,500.00$350.00$350.00$350.00$600.00
0018Signal pole foundation, remove (202-93995)EACH4$500.00$2,600.00$500.00$1,000.00$500.00$500.00
0019Pedestal base, remove (202-93996)EACH4$200.00$750.00$200.00$200.00$200.00$50.00
0020Signal pole, remove (202-93999)EACH4$900.00$1,500.00$900.00$900.00$900.00$50.00
0021Service point, remove (202-95579)EACH1$250.00$500.00$250.00$250.00$250.00$50.00
0022Concrete foundation, remove (202-96022)EACH4$400.00$2,600.00$400.00$400.00$400.00$800.00
0023Pipe, remove (202-96133)LFT725$47.80$95.00$21.50$55.00$45.00$20.00
0024Foundation, street light, remove (202-96328)EACH8$350.00$2,000.00$350.00$350.00$350.00$50.00
0025Traffic signal interconnect, remove (202-97909)LS1$200.00$1,500.00$200.00$200.00$200.00$50.00
0026Pole, remove (202-98370)EACH4$850.00$1,500.00$850.00$850.00$850.00$500.00
0027Excavation, common (203-02000)CYS3,230$56.79$51.00$47.00$48.00$93.00$65.00
0028Borrow (203-02070)CYS1,445$0.01$0.01$0.01$10.00$0.01$22.00
0029Stormwater management budget (205-12108)DOL43,040$1.00$1.00$1.00$1.00$1.00$1.00
0030Stormwater management implementation (205-12616)LS1$12,017$8,270.00$11,000$20,000$50,000$5,000.00
0031SWQCP preparation (205-12618)LS1$2,500.00$2,400.00$2,150.00$3,000.00$2,400.00$2,400.00
0032Subgrade treatment, type II (207-08264)SYS970$26.57$45.00$32.00$35.00$30.00$38.00
0033Subgrade treatment, type III (207-08266)SYS681$2.89$3.00$9.00$5.00$5.00$7.00
0034Subgrade treatment, type ibc (207-12635)SYS15,593$15.00$13.00$14.10$14.00$14.00$16.00
0035B borrow (211-02050)CYS80$106.55$133.00$97.00$50.00$50.00$90.00
0036Structure backfill, type 2 (211-09265)CYS1,649$59.67$110.00$98.00$105.00$75.00$86.00
0037Geogrid, type IB (214-11796)SYS870$2.28$3.00$4.00$3.00$1.09$5.00
0038Compacted aggregate, no. 53 (301-12234)CYS376$113.87$98.00$130.00$115.00$60.00$130.00
0039Dense graded subbase (302-07455)CYS145$100.42$129.00$100.00$100.00$89.00$120.00
0040Compacted aggregate, no. 53 (303-01180)TON148$65.72$65.00$81.00$80.00$100.00$60.00
0041Widening with HMA, type C (304-07494)TON127$167.75$205.00$140.00$150.00$220.00$230.00
0042Milling, asphalt, 2 in. (306-08036)SYS479$5.08$8.00$4.55$10.00$20.50$15.00
0043QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON1,414$135.63$120.00$120.00$128.00$130.00$120.00
0044QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON1,705$119.31$90.00$90.00$109.00$115.00$90.00
0045QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053)TON5,372$110.48$82.00$82.00$98.00$110.00$82.00
0046Joint adhesive (401-11526)LFT6,512$0.60$1.00$1.25$0.60$0.50$1.25
0047Void reducing asphalt membrane for HMA (401-12439)LFT6,476$6.45$3.00$2.75$8.50$6.00$2.75
0048HMA for temporary pavement, type B (402-10084)TON40$208.83$250.00$140.00$235.00$500.00$282.20
0049Asphalt for tack coat (406-05520)TON13$0.01$0.01$0.01$600.00$1.00$0.01
0050PCCP, 9 in. (502-06457)SYS501$102.44$102.00$94.00$120.00$85.00$138.00
0051D-1 contraction joint (503-05240)LFT360$19.43$22.00$20.00$28.00$225.00$34.00
0052HMA for sidewalk (604-05528)TON97$131.99$230.00$230.00$198.00$193.00$230.00
0053Sidewalk, concrete (604-06070)SYS1,531$57.90$68.00$82.00$70.00$53.00$80.00
0054Curb ramp, concrete (604-08086)SYS297$212.88$192.00$205.00$200.00$105.00$270.00
0055Detectable warning surfaces (604-12083)SYS45$317.52$72.00$166.00$400.00$175.00$400.00
0056Handrail, pedestrian (604-95344)LFT162$380.00$398.00$380.00$380.00$380.00$425.00
0057Curb, concrete (605-06120)LFT2,560$28.79$40.00$30.00$30.00$30.00$38.00
0058Curb, concrete , modified (605-06120)LFT163$67.68$140.00$75.00$110.00$60.00$88.00
0059Curb and gutter, concrete (605-06140)LFT2,671$34.77$40.00$37.65$35.00$30.00$38.00
0060Curb and gutter, concrete , modified (605-06140)LFT213$63.28$64.00$95.00$48.00$60.00$39.00
0061Curb and gutter, concrete, type B (605-06145)LFT348$34.03$60.00$30.00$45.00$35.00$39.00
0062HMA for approaches, type B (610-07487)TON22$214.95$223.00$223.00$245.00$195.00$300.00
0063PCCP for approaches, 9 in. (610-09108)SYS870$105.76$98.00$90.00$100.00$85.00$150.00
0064Mailbox assembly, single (611-06497)EACH1$400.00$400.00$400.00$400.00$400.00$250.00
0065Right-of-way marker (615-06490)EACH25$155.00$155.00$155.00$155.00$155.00$187.00
0066Monument, type B (615-06505)EACH13$1,100.00$1,100.00$1,100.00$1,100.00$1,100.00$960.00
0067Monument, type C (615-06510)EACH3$600.00$600.00$600.00$600.00$600.00$710.00
0068Monument, type D (615-06515)EACH5$125.00$125.00$125.00$125.00$125.00$175.00
0069Sodding, nursery (621-06575)SYS4,370$4.35$5.00$4.35$6.00$5.00$11.00
0070Field office, type D (628-12683)MOS18$3,797.37$2,000.00$4,000.00$4,500.00$3,500.00$3,600.00
0071Topsoil processing and distribution (629-000149)SYS4,370$7.65$2.00$1.50$9.00$4.00$15.00
0072Topsoil amendment budget (629-000150)DOL8,740$1.00$1.00$1.00$1.00$1.00$1.00
0073Pipe, type 2, circular, diameter 15 in. (715-05032)LFT381$79.69$71.00$95.00$70.00$68.00$150.00
0074Pipe, type 2, circular, diameter 15 in. , water quality (715-05032)LFT130$101.91$94.00$106.00$90.00$90.00$150.00
0075Pipe, type 2, circular, diameter 12 in. (715-05149)LFT944$72.09$76.00$90.00$68.00$62.00$140.00
0076Pipe, type 2, circular, diameter 18 in. (715-05152)LFT313$82.30$77.00$119.00$95.00$75.00$160.00
0077Pipe, type 2, circular, diameter 24 in. (715-05154)LFT999$122.50$104.00$165.00$120.00$106.00$214.00
0078Pipe, type 2, circular, diameter 24 in. , water quality (715-05154)LFT367$163.25$100.00$197.00$140.00$150.00$216.00
0079Pipe, type 4, circular, diameter 4 in. (715-05203)LFT307$14.91$5.00$31.00$30.00$19.00$10.00
0080Geotextile for underdrains, type 2A (718-12307)SYS159$3.23$5.00$4.00$4.00$1.44$5.00
0081Casting, inlet, adjust to grade (720-12797)EACH6$523.36$1,600.00$1,750.00$900.00$431.00$800.00
0082Casting, manhole, adjust to grade (720-12798)EACH2$914.26$1,800.00$1,750.00$1,000.00$2,379.00$800.00
0083Inlet, type E7 (720-45030)EACH2$3,066.12$3,598.00$3,250.00$3,000.00$2,932.00$2,700.00
0084Inlet, type F7 (720-45035)EACH1$3,035.97$3,560.00$3,000.00$3,000.00$2,915.00$2,700.00
0085Inlet, type G7 (720-45040)EACH2$4,228.32$4,570.00$3,710.00$3,500.00$3,692.00$3,600.00
0086Inlet, type HA5 (720-45042)EACH2$3,749.52$3,170.00$3,650.00$3,600.00$3,833.00$3,600.00
0087Manhole, type C4 (720-45410)EACH9$5,327.56$5,650.00$7,400.00$4,500.00$4,148.00$5,200.00
0088Structure, manhole, reconstructed (720-45605)LFT6$1,216.32$11,500$1,100.00$2,100.00$897.00$1,200.00
0089Inlet, type B15, modified (720-93409)EACH3$4,062.73$4,000.00$3,900.00$3,800.00$4,240.00$4,000.00
0090Inlet, type B15 (720-98174)EACH6$4,088.42$4,110.00$3,920.00$3,800.00$4,240.00$4,000.00
0091Inlet, type C15 (720-98555)EACH19$4,491.64$4,482.00$3,940.00$3,800.00$4,240.00$4,100.00
0092Inlet, type C15 , water quality (720-98555)EACH1$5,263.17$5,037.00$4,600.00$4,000.00$4,592.00$8,000.00
0093Manhole, type C4, drop (720-98625)EACH2$15,933$24,465$17,500$6,000.00$23,080$5,200.00
0094Leveling pad, concrete (731-93947)LFT307$44.24$68.00$84.00$75.00$40.00$23.00
0095Aggregate for drainage fill (732-11770)CYS44$103.79$92.00$112.00$85.00$74.80$188.00
0096Modular block wall (732-11810)SFT1,123$16.58$29.00$70.00$25.00$43.74$20.00
0097Modular block wall erection (732-11811)SFT1,123$38.18$37.00$90.00$40.00$45.00$40.00
0098Temporary pavement message marking, lane indication arrow (801-01504)EACH25$103.00$103.00$160.00$103.00$199.00$160.00
0099Temporary pavement message marking, 'only' (801-01505)EACH2$139.00$139.00$220.00$140.00$207.00$220.00
0100Construction sign, type C (801-03290)EACH5$270.00$270.00$250.00$270.00$231.00$250.00
0101Construction sign, type D (801-03291)EACH1$104.00$104.00$150.00$104.00$252.00$150.00
0102Temporary illumination (801-03621)LS1$31,764$31,765$5,600.00$32,000$45,000$2,500.00
0103Road closure sign assembly (801-04308)EACH15$217.00$217.00$315.00$218.00$225.00$315.00
0104Temporary pavement marking, 6 in. (801-06206)LFT10,846$0.75$1.00$0.75$0.80$0.23$0.75
0105Detour route marker assembly (801-06625)EACH12$119.00$119.00$130.00$120.00$161.00$130.00
0106Construction sign, type A (801-06640)EACH25$220.00$220.00$190.00$220.00$182.00$190.00
0107Construction sign, type B (801-06645)EACH60$79.00$79.00$120.00$80.00$95.00$120.00
0108Maintaining traffic (801-06775)LS1$42,866$45,210$24,873$140,000$60,000$146,530
0109Energy absorbing terminal, CZ, TL-2 (801-07023)EACH1$8,375.00$8,375.00$8,375.00$8,500.00$8,375.00$8,325.00
0110Barricade, type III-A (801-07118)LFT448$10.00$10.00$16.00$10.00$14.87$16.00
0111Barricade, type III-B (801-07119)LFT216$12.00$12.00$16.00$12.00$14.87$16.00
0112Temporary pavement marking, 24 in. (801-07612)LFT22$8.36$9.00$10.00$9.00$5.91$10.00
0113Temporary traffic barrier, type 2 (801-08401)LFT240$36.74$40.00$118.94$80.00$56.44$62.46
0114Temporary pedestrian channelizer (801-12862)LFT36$25.00$25.00$25.00$25.00$160.30$25.00
0115Sign post, square, type 1, reinforced anchor base (802-05701)LFT378$22.00$15.00$22.00$22.00$22.00$45.00
0116Sign, sheet, and supports, remove (802-07059)EACH11$50.00$100.00$50.00$50.00$50.00$50.00
0117Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT173$28.00$16.00$28.00$28.00$28.00$30.00
0118Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT115$30.00$19.00$30.00$30.00$30.00$35.00
0119Traffic signal equipment, remove (805-01300)EACH1$2,450.00$3,600.00$2,450.00$2,450.00$2,450.00$6,500.00
0120Conduit, PVC, 2 in. schedule 40 (805-08214)LFT154$18.00$20.00$18.00$18.00$18.00$40.00
0121Signal cable, roadway loop, copper, 1C/14 gauge (805-78470)LFT442$1.50$13.00$1.50$1.50$1.50$10.00
0122Signal detector housing (805-78785)EACH1$2,600.00$2,000.00$2,600.00$2,600.00$2,600.00$4,500.00
0124Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439)LFT357$9.69$10.00$12.00$10.00$12.85$12.00
0125Line, thermoplastic, solid, white, 8 in. (808-06705)LFT156$1.52$2.00$1.00$1.50$2.87$1.00
0126Line, remove (808-06716)LFT961$1.00$1.00$1.00$1.00$2.11$1.00
0127Line, thermoplastic, dotted, white, 6 in. (808-11650)LFT427$4.00$4.00$2.20$4.00$1.09$2.20
0128Transverse marking, thermoplastic, yield line, white, 27 in. (808-11698)LFT99$17.76$18.00$25.00$18.00$19.63$25.00
0129Line, thermoplastic, solid, white, 6 in. (808-75043)LFT2,229$1.08$1.00$0.95$1.00$0.97$0.95
0130Line, thermoplastic, solid, yellow, 6 in. (808-75247)LFT2,756$1.08$1.00$0.95$1.00$0.97$0.95
0131Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260)LFT42$4.85$5.00$6.50$5.00$7.53$6.50
0132Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278)LFT198$4.86$5.00$6.50$5.00$7.53$6.50
0133Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297)LFT11$9.69$10.00$12.00$10.00$12.85$12.00
0134Pavement message marking, thermoplastic, lane indication arrow (808-75320)EACH15$208.00$208.00$180.00$208.00$209.00$180.00
0135Snowplowable raised pavement marker (808-75998)EACH68$58.00$150.00$35.00$85.00$39.11$26.97
0136Line, thermoplastic, solid, yellow, 8 in. (808-92027)LFT905$1.52$2.00$1.00$1.50$2.39$1.00
0137Line, thermoplastic, broken, white, 6 in. (808-96075)LFT394$4.00$4.00$1.40$4.00$1.47$1.40
0138Snowplowable raised pavement marker, remove (808-75996)EACH37$8.39$61.00$30.00$23.00$5.00$32.00
INDOT contract R-42227-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy