| 0001 | Construction engineering (105-06845) | LS | 1 | $7,500.00 | $30,000 | $11,300 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $60,835 | $59,182 | $105,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $2,000.00 | $20,000 | $16,150 |
| 0013 | Curb, concrete, remove (202-02278) | LFT | 26 | $50.00 | $40.00 | $22.00 |
| 0014 | Curb and gutter, remove (202-02279) | LFT | 51 | $50.00 | $40.00 | $22.00 |
| 0015 | Sidewalk concrete, remove (202-52710) | SYS | 32 | $150.00 | $100.00 | $31.00 |
| 0016 | Inlet, remove (202-91385) | EACH | 1 | $2,000.00 | $1,300.00 | $950.00 |
| 0017 | Manhole, remove (202-93047) | EACH | 1 | $2,000.00 | $1,300.00 | $1,000.00 |
| 0018 | Excavation, common (203-02000) | CYS | 1 | $500.00 | $1,500.00 | $500.00 |
| 0019 | Pump around (205-11626) | EACH | 3 | $300.00 | $5,000.00 | $1,400.00 |
| 0020 | Stormwater management budget (205-12108) | DOL | 1,600 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $1,500.00 | $25,000 | $1,700.00 |
| 0022 | Subgrade treatment, type II (207-08264) | SYS | 1,384 | $15.00 | $10.00 | $49.00 |
| 0023 | Structure backfill, type 2 (211-09265) | CYS | 70 | $60.00 | $125.00 | $122.00 |
| 0024 | Geogrid, type IB (214-11796) | SYS | 1,384 | $1.50 | $2.00 | $1.50 |
| 0025 | Compacted aggregate, no. 8 (301-12233) | CYS | 1 | $60.00 | $3,000.00 | $600.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 79 | $68.00 | $85.00 | $93.00 |
| 0027 | HMA patching, full depth, type C (304-12625) | TON | 898 | $250.00 | $200.00 | $320.00 |
| 0028 | HMA patching, partial depth, type C (304-12626) | TON | 212 | $250.00 | $200.00 | $337.00 |
| 0029 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 17,299 | $1.70 | $2.15 | $1.60 |
| 0030 | Milling, approach (306-08432) | SYS | 2,080 | $8.70 | $10.00 | $3.40 |
| 0031 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 1,429 | $100.00 | $105.00 | $127.00 |
| 0032 | Joint adhesive, surface (401-10258) | LFT | 13,965 | $0.50 | $0.25 | $0.25 |
| 0033 | Liquid asphalt sealant (401-11785) | LFT | 13,965 | $0.05 | $0.01 | $0.01 |
| 0034 | Asphalt for tack coat (406-05520) | TON | 8 | $1.00 | $600.00 | $75.00 |
| 0035 | Sidewalk, concrete (604-06070) | SYS | 6 | $145.00 | $80.00 | $400.00 |
| 0036 | Curb ramp, concrete (604-08086) | SYS | 27 | $135.00 | $250.00 | $140.00 |
| 0037 | Detectable warning surfaces (604-12083) | SYS | 3 | $210.00 | $250.00 | $200.00 |
| 0038 | Curb and gutter, concrete (605-06140) | LFT | 51 | $56.00 | $45.00 | $130.00 |
| 0039 | HMA for approaches, type C (610-07488) | TON | 172 | $250.00 | $300.00 | $200.00 |
| 0040 | Riprap, revetment (616-06405) | TON | 14 | $73.10 | $80.00 | $350.00 |
| 0041 | Geotextile for riprap, type 1A (616-12246) | SYS | 35 | $12.43 | $5.00 | $13.00 |
| 0042 | Geotextile for riprap, type 2B (616-12249) | SYS | 6 | $104.03 | $5.00 | $105.00 |
| 0043 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $375.00 | $375.00 | $375.00 |
| 0044 | Mulched seeding, type R (621-06559) | SYS | 66 | $12.05 | $12.05 | $12.05 |
| 0045 | Topsoil (621-06570) | CYS | 2 | $370.10 | $1,000.00 | $1,050.00 |
| 0046 | Sodding, nursery (621-06575) | SYS | 17 | $101.50 | $101.50 | $101.50 |
| 0047 | Field office, type C (628-09403) | MOS | 6 | $4,500.00 | $5,000.00 | $4,800.00 |
| 0048 | Headwall reconstruct (714-96273) | LS | 1 | $21,644 | $41,634 | $5,600.00 |
| 0049 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 39 | $102.87 | $275.00 | $245.00 |
| 0050 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 42 | $94.80 | $250.00 | $160.00 |
| 0051 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 48 | $102.07 | $180.00 | $145.00 |
| 0052 | Pipe end section, diameter 12 in. (715-46000) | EACH | 1 | $730.82 | $1,500.00 | $475.00 |
| 0053 | Pipe end section, diameter 18 in. (715-46010) | EACH | 1 | $866.82 | $1,700.00 | $525.00 |
| 0054 | Casting, inlet, adjust to grade (720-12797) | EACH | 2 | $340.17 | $1,000.00 | $1,200.00 |
| 0055 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $340.17 | $1,000.00 | $1,200.00 |
| 0056 | Inlet, type F7 (720-45035) | EACH | 1 | $2,172.36 | $5,000.00 | $3,700.00 |
| 0057 | Manhole, type C4 (720-45410) | EACH | 1 | $2,705.56 | $5,500.00 | $5,300.00 |
| 0058 | Casting, water valve, adjust to grade (720-94840) | EACH | 10 | $108.46 | $600.00 | $750.00 |
| 0059 | Temporary pavement message marking, lane indication arrow (801-01504) | EACH | 11 | $127.00 | $127.00 | $127.00 |
| 0060 | Road closure sign assembly (801-04308) | EACH | 5 | $258.00 | $258.00 | $258.00 |
| 0061 | Temporary pavement marking, 4 in. (801-06203) | LFT | 332 | $0.43 | $0.43 | $0.75 |
| 0062 | Temporary pavement marking, 5 in. (801-06204) | LFT | 1,426 | $0.53 | $0.53 | $0.55 |
| 0063 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 332 | $1.28 | $1.28 | $2.10 |
| 0064 | Temporary pavement marking, removable, 5 in. (801-06208) | LFT | 1,426 | $1.88 | $1.88 | $1.75 |
| 0065 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 11 | $178.00 | $178.00 | $80.00 |
| 0066 | Temporary transverse pavement marking, 6 in. (801-06214) | LFT | 94 | $0.94 | $0.94 | $1.25 |
| 0067 | Temporary transverse pavement marking, 24 in. (801-06216) | LFT | 112 | $10.45 | $10.45 | $2.65 |
| 0068 | Temporary transverse pavement marking, removable, 6 in. (801-06217) | LFT | 164 | $1.61 | $1.61 | $4.30 |
| 0069 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 112 | $13.88 | $13.88 | $9.50 |
| 0070 | Detour route marker assembly (801-06625) | EACH | 29 | $151.00 | $151.00 | $151.00 |
| 0071 | Construction sign, type A (801-06640) | EACH | 28 | $205.00 | $205.00 | $205.00 |
| 0072 | Construction sign, type B (801-06645) | EACH | 25 | $103.00 | $103.00 | $103.00 |
| 0073 | Maintaining traffic (801-06775) | LS | 1 | $20,127 | $80,000 | $47,000 |
| 0074 | Barricade, type III-A (801-07118) | LFT | 72 | $15.88 | $15.88 | $15.88 |
| 0075 | Barricade, type III-B (801-07119) | LFT | 72 | $15.88 | $15.88 | $15.88 |
| 0076 | Temporary curb ramp (801-11990) | EACH | 2 | $4,303.09 | $200.00 | $5,000.00 |
| 0077 | Temporary accessible pedestrian path (801-12641) | SYS | 9 | $115.19 | $96.00 | $200.00 |
| 0078 | Temporary pedestrian channelizer (801-12862) | LFT | 43 | $23.35 | $31.00 | $33.00 |
| 0079 | Handhole, signal, type 1 (805-01842) | EACH | 1 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0080 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0081 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 2 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0082 | Loop detector delay amplifier, counting, no. 2 channel (805-09539) | EACH | 4 | $700.00 | $700.00 | $700.00 |
| 0083 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 96 | $45.00 | $45.00 | $45.00 |
| 0084 | Pedestrian push button, APS (805-11817) | EACH | 2 | $1,200.00 | $1,200.00 | $1,200.00 |
| 0085 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 3,264 | $1.50 | $1.50 | $1.50 |
| 0086 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 395 | $5.50 | $5.50 | $5.50 |
| 0087 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 2,367 | $2.00 | $2.00 | $2.00 |
| 0088 | Signal detector housing (805-78785) | EACH | 8 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0089 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 816 | $14.00 | $14.00 | $14.00 |
| 0090 | Signal pole, pedestal, 10 FT (805-90005) | EACH | 2 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0091 | Loop detector delay amplifier, noncounting 2 channel (805-92504) | EACH | 4 | $600.00 | $600.00 | $600.00 |
| 0092 | Line, remove (808-06716) | LFT | 334 | $2.78 | $2.78 | $2.78 |
| 0093 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0094 | Line, thermoplastic, dotted, white, 6 in. (808-11650) | LFT | 51 | $1.02 | $1.83 | $1.83 |
| 0095 | Grooving for pavement markings (808-12032) | LFT | 15,445 | $0.73 | $0.73 | $0.73 |
| 0096 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 6,769 | $1.02 | $1.02 | $1.02 |
| 0097 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 7,975 | $1.02 | $1.02 | $1.02 |
| 0098 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 36 | $7.03 | $7.03 | $7.03 |
| 0099 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 112 | $13.78 | $13.78 | $13.78 |
| 0100 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 94 | $3.18 | $3.18 | $3.18 |
| 0101 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 11 | $203.00 | $203.00 | $203.00 |
| 0102 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 81 | $10.43 | $10.43 | $10.43 |
| 0103 | Snowplowable raised pavement marker (808-75998) | EACH | 81 | $31.11 | $31.11 | $31.11 |
| 0104 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 650 | $1.61 | $1.61 | $1.61 |