INDOT contract R-44250-A bid tabulation
NEW ROAD CONSTRUCTION. Let by Indiana DOT on July 9, 2025, Boone, Crawfordsville. 9 bids received; low bid $3,999,970 by Midwest Paving LLC.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 131
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Midwest Paving LLC | $3,999,970 | Low |
| 2 | Calumet Civil Contractors Inc | $4,131,000 | +3.0% |
| 3 | Milestone Contractors LP | $4,509,575 | +13% |
| 4 | Morphey Construction Inc. | $4,543,990 | +14% |
| 5 | Crider & Crider Inc | $4,554,313 | +14% |
| 6 | E & B Paving LLC | $4,778,921 | +19% |
| 7 | Rieth-Riley Construction Co., Inc. | $4,973,828 | +24% |
| 8 | William Charles Construction Company | $5,050,000 | +26% |
| 9 | Atlas Excavating Inc | $5,090,961 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Midwest Paving LLC | 2. Calumet Civil Contractors Inc | 3. Milestone Contractors LP | 4. Morphey Construction Inc. | 5. Crider & Crider Inc | 6. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $33,500 | $35,000 | $135,468 | $41,700 | $53,000 | $60,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $496,180 | $164,698 | $232,000 | $227,200 | $222,000 | $239,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $61,282 | $35,000 | $140,000 | $136,320 | $132,000 | $82,000 |
| 0011 | Regulated materials, dispose, type C (202-05545) | CYS | 205 | $90.00 | $200.00 | $95.00 | $100.00 | $75.00 | $90.00 |
| 0012 | Regulated materials, transport, type C (202-05555) | CYS | 205 | $35.00 | $200.00 | $35.00 | $37.00 | $55.00 | $35.00 |
| 0013 | Contaminated soil, remove (202-06580) | CYS | 205 | $65.00 | $100.00 | $65.00 | $40.00 | $55.00 | $65.00 |
| 0014 | Excavation, common (203-02000) | CYS | 3,645 | $40.00 | $34.00 | $35.00 | $45.00 | $56.00 | $85.00 |
| 0015 | Excavation, common , for undercut (203-02000) | CYS | 1,450 | $19.34 | $96.00 | $35.00 | $45.00 | $28.00 | $27.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 9,800 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $48,194 | $39,900 | $5,000.00 | $500.00 | $10,485 | $69,000 |
| 0018 | SWQCP preparation (205-12618) | LS | 1 | $1,500.00 | $3,500.00 | $5,000.00 | $2,300.00 | $3,000.00 | $4,400.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 1,232 | $28.00 | $23.50 | $35.00 | $28.00 | $19.50 | $42.00 |
| 0020 | Subgrade treatment, type ibc (207-12635) | SYS | 7,866 | $16.00 | $15.75 | $20.00 | $19.50 | $16.50 | $13.00 |
| 0021 | B borrow (211-02050) | CYS | 1,450 | $48.00 | $57.00 | $60.00 | $62.00 | $77.00 | $54.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 1,967 | $65.00 | $77.00 | $95.00 | $70.00 | $97.50 | $80.00 |
| 0023 | Structure backfill, type 2 , for sanitary sewer (211-09265) | CYS | 147 | $65.00 | $77.00 | $110.00 | $70.00 | $99.00 | $84.00 |
| 0024 | Structure backfill, type 2 , for water main (211-09265) | CYS | 1,741 | $65.00 | $77.00 | $95.00 | $70.00 | $99.00 | $77.00 |
| 0025 | Compacted aggregate, no. 53 (301-12234) | CYS | 784 | $72.00 | $85.00 | $90.00 | $95.00 | $100.00 | $70.00 |
| 0026 | Dense graded subbase (302-07455) | CYS | 203 | $112.00 | $140.00 | $125.00 | $168.00 | $109.00 | $105.00 |
| 0028 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 436 | $112.00 | $118.00 | $120.00 | $120.00 | $120.00 | $135.00 |
| 0029 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 727 | $97.00 | $93.00 | $100.00 | $100.00 | $100.00 | $115.00 |
| 0030 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,162 | $90.00 | $95.00 | $90.00 | $90.00 | $90.00 | $100.00 |
| 0031 | Joint adhesive, surface (401-10258) | LFT | 2,073 | $0.50 | $0.65 | $0.50 | $0.50 | $0.50 | $1.00 |
| 0032 | Joint adhesive, intermediate (401-10259) | LFT | 2,073 | $0.50 | $0.65 | $0.50 | $0.50 | $0.50 | $1.35 |
| 0033 | Asphalt for tack coat (406-05520) | TON | 4 | $0.25 | $1,400.00 | $100.00 | $100.00 | $100.00 | $0.01 |
| 0034 | Sidewalk, concrete (604-06070) | SYS | 2,060 | $75.00 | $68.00 | $83.00 | $89.00 | $68.00 | $77.00 |
| 0035 | Curb ramp, concrete (604-08086) | SYS | 102 | $200.00 | $185.00 | $245.00 | $265.00 | $175.00 | $185.00 |
| 0036 | Detectable warning surfaces (604-12083) | SYS | 18 | $175.00 | $400.00 | $300.00 | $405.00 | $375.00 | $335.00 |
| 0037 | Steps, concrete (604-44251) | CYS | 0.10 | $7,350.00 | $24,000 | $6,000.00 | $25,000 | $7,500.00 | $20,000 |
| 0038 | Curb, integral concrete, modified (605-06105) | LFT | 123 | $55.00 | $55.00 | $55.00 | $36.00 | $33.00 | $63.00 |
| 0039 | Curb, concrete (605-06120) | LFT | 289 | $40.00 | $43.00 | $45.00 | $50.00 | $33.00 | $73.00 |
| 0040 | Curb and gutter, concrete (605-06140) | LFT | 3,183 | $28.00 | $33.00 | $28.00 | $40.00 | $33.00 | $30.00 |
| 0041 | Curb and gutter, rolled curb (605-97937) | LFT | 118 | $65.00 | $55.00 | $38.00 | $48.00 | $33.00 | $73.00 |
| 0042 | HMA for approaches, type B (610-07487) | TON | 206 | $175.00 | $150.00 | $150.00 | $188.00 | $150.00 | $235.00 |
| 0043 | PCCP for approaches, 6 in. (610-08446) | SYS | 729 | $85.00 | $85.00 | $145.00 | $105.00 | $90.00 | $105.00 |
| 0044 | PCCP for approaches, 9 in. (610-09108) | SYS | 477 | $48.00 | $125.00 | $160.00 | $125.00 | $106.00 | $130.00 |
| 0045 | Riprap, revetment (616-06405) | TON | 9 | $90.00 | $115.00 | $100.00 | $200.00 | $91.50 | $121.00 |
| 0046 | Geotextile for riprap, type 2A (616-12248) | SYS | 18 | $42.00 | $4.00 | $5.00 | $50.00 | $61.00 | $34.00 |
| 0047 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $400.00 | $400.00 | $500.00 | $500.00 | $425.00 | $500.00 |
| 0048 | Seed mixture, type U (621-06554) | LBS | 53 | $21.75 | $21.75 | $19.00 | $18.43 | $23.06 | $18.43 |
| 0049 | Water (621-06567) | KGAL | 5 | $10.00 | $10.00 | $37.00 | $37.00 | $10.60 | $37.00 |
| 0050 | Topsoil (621-06570) | CYS | 445 | $110.00 | $100.00 | $170.00 | $95.00 | $60.50 | $76.00 |
| 0051 | Sodding, nursery (621-06575) | SYS | 1,002 | $7.40 | $17.70 | $6.00 | $12.02 | $7.84 | $5.93 |
| 0052 | Field office, type C (628-09403) | MOS | 22 | $3,500.00 | $3,200.00 | $2,500.00 | $2,400.00 | $2,450.00 | $4,000.00 |
| 0058 | Pipe , sanitary sewer, 8 inch (715-04612) | LFT | 197 | $91.00 | $75.00 | $120.00 | $105.00 | $100.50 | $129.00 |
| 0059 | Gate valve , with valve box, 16 inch (715-04836) | EACH | 11 | $14,000 | $15,000 | $12,000 | $15,500 | $17,396 | $12,098 |
| 0060 | Gate valve , with valve box, 3 inch (715-04836) | EACH | 1 | $1,800.00 | $2,650.00 | $2,100.00 | $1,800.00 | $2,519.00 | $1,717.00 |
| 0061 | Gate valve , with valve box, 6 inch (715-04836) | EACH | 1 | $2,200.00 | $3,500.00 | $2,400.00 | $2,400.00 | $3,642.00 | $1,983.00 |
| 0062 | Gate valve , with valve box, 8 inch (715-04836) | EACH | 6 | $2,900.00 | $4,500.00 | $3,300.00 | $3,400.00 | $4,544.00 | $2,864.00 |
| 0063 | Valve , insertion, 8 inch (715-04926) | EACH | 2 | $11,400 | $16,000 | $15,000 | $11,900 | $21,296 | $15,164 |
| 0064 | Water service line , long side (715-04965) | LFT | 120 | $70.00 | $180.00 | $85.00 | $200.00 | $91.00 | $91.50 |
| 0065 | Water service line , short side (715-04965) | LFT | 49 | $195.00 | $180.00 | $200.00 | $200.00 | $225.00 | $185.00 |
| 0066 | Meter , pit, water (715-04994) | EACH | 11 | $1,500.00 | $1,400.00 | $1,100.00 | $2,000.00 | $2,662.00 | $5,718.00 |
| 0067 | Meter , pit, water, remove (715-04994) | EACH | 11 | $350.00 | $400.00 | $600.00 | $400.00 | $548.00 | $1,412.00 |
| 0068 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 4,106 | $15.00 | $16.00 | $12.00 | $11.50 | $5.90 | $10.75 |
| 0069 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 690 | $71.00 | $60.00 | $95.00 | $78.00 | $80.00 | $80.00 |
| 0070 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 71 | $75.00 | $78.00 | $100.00 | $94.00 | $88.50 | $98.00 |
| 0071 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 442 | $78.00 | $85.00 | $115.00 | $110.00 | $106.50 | $113.50 |
| 0072 | Pipe, type 2, circular, diameter 21 in. (715-05153) | LFT | 128 | $102.00 | $110.00 | $135.00 | $135.00 | $110.50 | $156.00 |
| 0073 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 40 | $165.00 | $125.00 | $140.00 | $191.00 | $120.50 | $202.00 |
| 0074 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 1,303 | $125.00 | $125.00 | $175.00 | $205.00 | $181.50 | $187.00 |
| 0075 | Check valve (715-07317) | EACH | 1 | $8,500.00 | $3,000.00 | $2,700.00 | $7,000.00 | $10,721 | $8,069.00 |
| 0076 | Stormwater quality structure (715-09475) | EACH | 1 | $35,000 | $55,000 | $50,000 | $40,000 | $40,188 | $37,968 |
| 0077 | Water service connection , all (715-11896) | EACH | 11 | $1,465.00 | $500.00 | $350.00 | $650.00 | $1,604.00 | $706.00 |
| 0078 | Pipe end section, diameter 24 in. (715-46020) | EACH | 1 | $2,550.00 | $3,100.00 | $2,500.00 | $2,300.00 | $3,060.00 | $1,786.00 |
| 0079 | Tapping sleeve with valve , 4 inch X 4 inch (715-90853) | EACH | 2 | $8,400.00 | $5,800.00 | $6,500.00 | $2,400.00 | $7,714.00 | $9,118.00 |
| 0080 | Tapping sleeve with valve , 8 inch X 8 inch (715-90853) | EACH | 3 | $12,000 | $6,100.00 | $7,000.00 | $2,600.00 | $9,831.00 | $10,472 |
| 0081 | Cleanout , sanitary (718-04986) | EACH | 4 | $1,200.00 | $800.00 | $1,500.00 | $3,500.00 | $2,137.00 | $5,472.50 |
| 0082 | Geotextile for underdrains, type 1A (718-12305) | SYS | 3,345 | $0.80 | $1.20 | $2.00 | $1.55 | $2.30 | $4.75 |
| 0083 | Aggregate for underdrains (718-52610) | CYS | 370 | $65.00 | $77.00 | $40.00 | $105.00 | $101.00 | $75.75 |
| 0084 | Adjust monitoring well to grade (720-01888) | EACH | 4 | $700.00 | $875.00 | $700.00 | $700.00 | $1,581.00 | $1,645.00 |
| 0085 | Casting, furnish and adjust to grade , manhole (720-01894) | EACH | 7 | $1,050.00 | $800.00 | $1,300.00 | $2,000.00 | $1,289.00 | $1,713.00 |
| 0086 | Manhole , existing, sanitary, rehabilitate (720-03194) | EACH | 7 | $2,800.00 | $1,100.00 | $500.00 | $6,500.00 | $4,411.00 | $6,201.00 |
| 0087 | Manhole , sanitary, 48 inch (720-03194) | EACH | 2 | $4,500.00 | $6,800.00 | $10,000 | $7,900.00 | $8,372.00 | $8,429.00 |
| 0088 | Manhole , sanitary, 72 inch, replace (720-03194) | EACH | 1 | $8,000.00 | $16,000 | $20,000 | $18,000 | $22,000 | $13,077 |
| 0089 | Inlet, type J10 (720-45045) | EACH | 31 | $2,900.00 | $3,300.00 | $3,700.00 | $4,400.00 | $4,428.00 | $3,741.00 |
| 0090 | Inlet, type M10 (720-45055) | EACH | 10 | $2,900.00 | $3,300.00 | $3,700.00 | $4,600.00 | $4,311.00 | $3,738.00 |
| 0091 | Inlet, type R13 (720-45075) | EACH | 3 | $3,000.00 | $3,300.00 | $3,700.00 | $4,800.00 | $5,050.00 | $3,912.00 |
| 0092 | Manhole, type C4 (720-45410) | EACH | 8 | $3,500.00 | $6,000.00 | $3,700.00 | $6,100.00 | $4,853.00 | $5,511.00 |
| 0093 | Manhole, type K4 (720-94612) | EACH | 2 | $6,000.00 | $14,000 | $6,100.00 | $11,000 | $7,419.00 | $10,435 |
| 0094 | Manhole, type J4 (720-95422) | EACH | 11 | $5,000.00 | $8,000.00 | $6,100.00 | $9,100.00 | $7,391.00 | $7,058.00 |
| 0095 | Fire hydrant assembly (720-96999) | EACH | 2 | $10,500 | $13,500 | $12,000 | $15,000 | $16,853 | $17,803 |
| 0096 | Fire hydrant assembly , remove (720-96999) | EACH | 2 | $600.00 | $1,200.00 | $600.00 | $1,000.00 | $2,195.00 | $2,302.00 |
| 0097 | Road closure sign assembly (801-04308) | EACH | 7 | $305.00 | $350.00 | $305.00 | $305.00 | $350.00 | $305.00 |
| 0098 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 340 | $2.00 | $3.69 | $2.00 | $2.00 | $3.69 | $2.00 |
| 0099 | Detour route marker assembly (801-06625) | EACH | 18 | $135.00 | $186.00 | $135.00 | $135.00 | $186.00 | $135.00 |
| 0100 | Construction sign, type A (801-06640) | EACH | 7 | $172.00 | $288.00 | $172.00 | $172.00 | $288.00 | $172.00 |
| 0101 | Construction sign, type B (801-06645) | EACH | 28 | $100.00 | $85.00 | $100.00 | $100.00 | $85.00 | $100.00 |
| 0102 | Maintaining traffic (801-06775) | LS | 1 | $13,000 | $165,000 | $138,000 | $36,445 | $66,000 | $60,691 |
| 0103 | Barricade, type III-A (801-07118) | LFT | 192 | $15.00 | $16.00 | $15.00 | $15.00 | $16.00 | $15.00 |
| 0104 | Temporary curb ramp (801-11990) | EACH | 4 | $2,200.00 | $2,500.00 | $900.00 | $3,500.00 | $3,500.00 | $2,200.00 |
| 0105 | Temporary accessible pedestrian path (801-12641) | SYS | 127 | $28.50 | $44.15 | $20.00 | $62.00 | $35.00 | $28.50 |
| 0106 | Temporary pedestrian channelizer (801-12862) | LFT | 340 | $21.00 | $19.06 | $9.00 | $21.00 | $27.00 | $21.00 |
| 0107 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 85 | $44.00 | $41.30 | $44.00 | $50.00 | $18.20 | $41.30 |
| 0108 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 42 | $44.00 | $30.30 | $44.00 | $40.00 | $22.50 | $30.30 |
| 0109 | Sign, ground mounted, reset (802-91122) | EACH | 8 | $815.00 | $714.00 | $815.00 | $150.00 | $155.40 | $714.00 |
| 0110 | Conduit, PVC, 2 in. (805-06595) | LFT | 725 | $44.00 | $42.70 | $44.00 | $43.00 | $12.40 | $42.70 |
| 0111 | Handhole, lighting (807-02191) | EACH | 2 | $2,065.00 | $1,930.00 | $2,065.00 | $3,500.00 | $1,742.00 | $1,930.00 |
| 0112 | Luminaire, ornamental (807-03950) | EACH | 13 | $2,400.00 | $2,802.00 | $2,400.00 | $2,500.00 | $2,255.00 | $2,802.00 |
| 0113 | Light pole, ornamental (807-03951) | EACH | 13 | $3,700.00 | $3,540.00 | $3,700.00 | $3,500.00 | $2,575.00 | $3,540.00 |
| 0114 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 1,285 | $21.25 | $19.80 | $21.25 | $47.00 | $20.40 | $19.80 |
| 0115 | Lighting foundation, concrete, with grounding, 24 in. diameter X 72 in. (807-12184) | EACH | 13 | $3,800.00 | $1,696.00 | $3,800.00 | $3,500.00 | $4,575.00 | $1,696.00 |
| 0116 | Service point, type I (807-86805) | EACH | 1 | $11,000 | $11,371 | $11,000 | $12,000 | $4,450.00 | $11,371 |
| 0117 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 390 | $3.25 | $0.89 | $3.25 | $3.00 | $2.90 | $0.89 |
| 0118 | Connector kit, unfused (807-86910) | EACH | 13 | $175.00 | $56.40 | $175.00 | $75.00 | $72.00 | $56.40 |
| 0119 | Connector kit, fused (807-86915) | EACH | 13 | $175.00 | $51.90 | $175.00 | $75.00 | $63.75 | $51.90 |
| 0120 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 12 | $155.00 | $22.60 | $155.00 | $20.00 | $21.70 | $22.60 |
| 0121 | Multiple compression fitting, waterproofed (807-86925) | EACH | 25 | $155.00 | $22.60 | $155.00 | $25.00 | $27.80 | $22.60 |
| 0122 | Insulation link, non- waterproofed (807-86930) | EACH | 4 | $70.00 | $13.60 | $70.00 | $20.00 | $32.20 | $13.60 |
| 0123 | Insulation link, waterproofed (807-86935) | EACH | 30 | $70.00 | $16.30 | $70.00 | $25.00 | $38.75 | $16.30 |
| 0124 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 725 | $21.25 | $20.10 | $21.50 | $47.00 | $16.25 | $20.10 |
| 0125 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 23 | $1.00 | $2.45 | $1.00 | $1.00 | $2.45 | $1.00 |
| 0126 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 3,844 | $1.00 | $1.19 | $1.00 | $1.00 | $1.19 | $1.00 |
| 0127 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 81 | $14.00 | $11.34 | $14.00 | $14.00 | $14.00 | $14.00 |
| 0128 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 445 | $3.00 | $2.84 | $3.00 | $3.00 | $3.00 | $3.00 |
| 0129 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 2 | $190.00 | $251.00 | $190.00 | $190.00 | $190.00 | $190.00 |
| 0130 | Fertilizer, for permanent seeding , for permanent seeding (621-06545) | TON | 0.20 | $3,435.00 | $3,345.00 | $1,693.00 | $1,693.00 | $3,641.00 | $1,693.00 |
| 0131 | Mulching material (621-06565) | TON | 0.60 | $1,995.00 | $1,995.00 | $900.00 | $899.00 | $2,115.00 | $899.00 |
| 0132 | HMA for structure installation, type C (715-08306) | TON | 66 | $225.00 | $150.00 | $225.00 | $260.00 | $225.00 | $180.00 |
| 0133 | Water main , ductile iron, 3 in. (715-04964) | LFT | 29 | $370.00 | $166.00 | $200.00 | $255.00 | $514.00 | $370.00 |
| 0134 | Water main, ductile iron, 4 in. (715-98265) | LFT | 29 | $380.00 | $140.00 | $150.00 | $186.00 | $453.00 | $350.00 |
| 0135 | Water main, ductile iron, 6 in. (715-94780) | LFT | 31 | $300.00 | $130.00 | $120.00 | $178.00 | $403.00 | $255.00 |
| 0136 | Water main, ductile iron, 8 in. (715-11571) | LFT | 201 | $212.00 | $100.00 | $160.00 | $235.00 | $324.50 | $260.00 |
| 0137 | Water main, ductile iron, 16 in. (715-96669) | LFT | 2,060 | $188.00 | $205.00 | $240.00 | $240.00 | $270.00 | $325.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way