INDOT contract R-44897-A bid tabulation
SMALL STRUCTURES AND ADA SIDEWALK RAMP CONSTRUCTION. Let by Indiana DOT on February 11, 2026, Owen, Seymour. 4 bids received; low bid $2,646,480 by Crider & Crider Inc.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 106
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crider & Crider Inc | $2,646,480 | Low |
| 2 | E & B Paving LLC | $2,715,000 | +3.0% |
| 3 | Milestone Contractors LP | $2,832,234 | +7.0% |
| 4 | Calumet Civil Contractors Inc | $3,180,000 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crider & Crider Inc | 2. E & B Paving LLC | 3. Milestone Contractors LP | 4. Calumet Civil Contractors Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $90,161 | $25,266 | $28,000 | $16,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $75,500 | $100,000 | $141,000 | $155,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $50,000 | $40,000 | $45,000 | $50,000 |
| 0013 | Curb, concrete, remove (202-02278) | LFT | 783 | $8.25 | $14.66 | $12.00 | $20.00 |
| 0014 | Concrete steps, remove (202-03875) | EACH | 8 | $292.65 | $270.00 | $270.00 | $1,250.00 |
| 0015 | Sidewalk concrete, remove (202-52710) | SYS | 605 | $10.54 | $20.00 | $20.00 | $27.00 |
| 0016 | Sign and supports, channel posts, remove (202-74045) | EACH | 2 | $250.00 | $50.00 | $150.00 | $50.00 |
| 0017 | Signal pole foundation, remove (202-93995) | EACH | 2 | $1,167.70 | $819.86 | $900.00 | $1,000.00 |
| 0018 | Signal pole, remove (202-93999) | EACH | 2 | $1,500.00 | $1,100.00 | $1,500.00 | $1,100.00 |
| 0019 | Pipe, remove (202-96133) | LFT | 480 | $23.90 | $13.00 | $45.00 | $83.00 |
| 0020 | Concrete, remove (202-99080) | CYS | 73 | $120.01 | $140.00 | $140.00 | $183.00 |
| 0021 | Excavation, common (203-02000) | CYS | 3,390 | $34.25 | $65.00 | $45.00 | $47.00 |
| 0022 | Borrow (203-02070) | CYS | 85 | $46.96 | $35.00 | $60.00 | $57.00 |
| 0023 | Pump around (205-11626) | EACH | 4 | $8,322.33 | $2,500.00 | $3,000.00 | $10,500 |
| 0024 | Stormwater management budget (205-12108) | DOL | 28,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $5,928.33 | $10,000 | $16,000 | $29,600 |
| 0026 | Subgrade treatment, type II (207-08264) | SYS | 414 | $23.30 | $31.00 | $22.00 | $43.00 |
| 0027 | Subgrade treatment, type IC (207-09935) | SYS | 8,767 | $34.71 | $41.00 | $32.25 | $40.00 |
| 0028 | Structure backfill, type 2 (211-09265) | CYS | 2,266 | $84.42 | $72.00 | $70.00 | $71.00 |
| 0029 | Geogrid, type IB (214-11796) | SYS | 983 | $1.56 | $0.80 | $3.00 | $8.00 |
| 0030 | Geotextile for pavement, type 2B (214-12239) | SYS | 2,546 | $2.81 | $2.00 | $4.00 | $5.00 |
| 0031 | Compacted aggregate, no. 8 (301-12233) | CYS | 22 | $147.09 | $142.00 | $150.00 | $140.00 |
| 0032 | Dense graded subbase (302-07455) | CYS | 56 | $92.19 | $175.00 | $112.00 | $175.00 |
| 0033 | Compacted aggregate, no. 53 (303-01180) | TON | 514 | $40.20 | $73.00 | $80.00 | $88.00 |
| 0034 | HMA patching, full depth, type D (304-12627) | TON | 230 | $320.63 | $184.00 | $330.00 | $230.00 |
| 0035 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,222 | $7.37 | $8.00 | $13.00 | $11.00 |
| 0036 | Milling, asphalt, 2 in. (306-08036) | SYS | 292 | $11.54 | $21.00 | $25.00 | $55.00 |
| 0037 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 771 | $150.00 | $142.00 | $136.00 | $161.00 |
| 0038 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 949 | $115.00 | $110.00 | $113.00 | $138.00 |
| 0039 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 3,052 | $90.00 | $84.00 | $96.00 | $102.00 |
| 0040 | Joint adhesive (401-11526) | LFT | 1,450 | $1.50 | $1.40 | $2.00 | $2.70 |
| 0041 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 2,965 | $8.00 | $8.00 | $11.00 | $11.00 |
| 0042 | HMA wedge and level, type D (402-07787) | TON | 49 | $400.00 | $378.00 | $152.00 | $287.00 |
| 0043 | Asphalt for tack coat (406-05520) | TON | 8 | $900.00 | $888.00 | $690.00 | $100.00 |
| 0044 | Guardrail terminal system, W-beam, curved, type 1 (601-01700) | EACH | 2 | $2,600.00 | $2,550.00 | $3,850.00 | $3,135.00 |
| 0045 | Temporary guardrail, W- beam, 6 FT 3 in. spacing (601-02206) | LFT | 1,125 | $17.00 | $17.00 | $28.00 | $29.00 |
| 0046 | Guardrail, remove (601-02241) | LFT | 1,413 | $4.00 | $4.00 | $5.00 | $6.00 |
| 0047 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,413 | $20.00 | $20.00 | $23.00 | $23.00 |
| 0048 | Guardrail end treatment, type OS (601-94689) | EACH | 5 | $2,300.00 | $2,300.00 | $3,250.00 | $3,256.00 |
| 0049 | Temporary guardrail end treatment, type OS (601-97080) | EACH | 7 | $2,300.00 | $2,300.00 | $3,375.00 | $3,358.00 |
| 0050 | Sidewalk, concrete (604-06070) | SYS | 1,287 | $63.00 | $85.00 | $67.00 | $87.00 |
| 0051 | Curb ramp, concrete (604-08086) | SYS | 101 | $200.00 | $233.00 | $220.00 | $272.00 |
| 0052 | Detectable warning surfaces (604-12083) | SYS | 19 | $280.00 | $322.00 | $330.00 | $198.00 |
| 0053 | Handrail, pedestrian (604-95344) | LFT | 36 | $376.81 | $540.00 | $630.00 | $360.00 |
| 0054 | Curb, concrete (605-06120) | LFT | 783 | $38.07 | $80.00 | $61.00 | $78.00 |
| 0055 | HMA for approaches, type C (610-07488) | TON | 81 | $170.00 | $164.00 | $124.00 | $139.00 |
| 0056 | PCCP for approaches, 6 in. (610-08446) | SYS | 114 | $124.31 | $180.00 | $155.00 | $198.00 |
| 0057 | PCCP for approaches, 9 in. (610-09108) | SYS | 162 | $130.11 | $135.00 | $160.00 | $134.00 |
| 0058 | Right-of-way marker (615-06490) | EACH | 12 | $180.00 | $175.00 | $345.00 | $175.00 |
| 0059 | Monument, type B (615-06505) | EACH | 2 | $1,600.00 | $1,525.00 | $1,235.00 | $989.00 |
| 0060 | Riprap, class 1 (616-05688) | TON | 11 | $188.70 | $200.00 | $195.00 | $124.00 |
| 0061 | Riprap, class 2 (616-05689) | TON | 7 | $262.10 | $190.00 | $280.00 | $158.00 |
| 0062 | Riprap, revetment (616-06405) | TON | 113 | $96.74 | $89.00 | $85.00 | $91.00 |
| 0063 | Geotextile for riprap, type 1A (616-12246) | SYS | 279 | $3.66 | $3.00 | $4.00 | $8.00 |
| 0064 | Geotextile for riprap, type 2B (616-12249) | SYS | 234 | $6.23 | $2.00 | $7.00 | $9.00 |
| 0065 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $800.00 | $400.00 | $500.00 | $400.00 |
| 0066 | Mulched seeding, type R (621-06559) | SYS | 4,695 | $1.65 | $1.00 | $3.25 | $8.82 |
| 0067 | Field office, type C (628-09403) | MOS | 6 | $1,500.00 | $3,300.00 | $3,000.00 | $3,200.00 |
| 0068 | Computer system equipment (628-11976) | EACH | 2 | $500.00 | $288.00 | $1,000.00 | $1,500.00 |
| 0069 | Temporary shoring (702-04325) | LS | 1 | $50,000 | $25,000 | $82,000 | $38,000 |
| 0070 | Field drilled hole in concrete (702-51863) | EACH | 6 | $250.00 | $28.00 | $80.00 | $500.00 |
| 0071 | Concrete, A (702-90915) | CYS | 6 | $2,500.00 | $3,075.03 | $2,100.00 | $2,000.00 |
| 0072 | Pipe end section, diameter 42 in. (715-04522) | EACH | 2 | $2,359.05 | $3,264.00 | $3,800.00 | $3,610.00 |
| 0073 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 347 | $407.29 | $409.00 | $380.00 | $282.00 |
| 0074 | Pipe, type 1, circular, diameter 42 in. (715-05127) | LFT | 130 | $401.95 | $358.00 | $510.00 | $422.00 |
| 0075 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 24 | $190.25 | $284.00 | $180.00 | $80.00 |
| 0076 | Pipe, slotted drain, diameter 12 in. , 1.5 in. (715-05422) | LFT | 86 | $219.82 | $178.00 | $325.00 | $191.00 |
| 0077 | Pipe end section, diameter 36 in. (715-46040) | EACH | 6 | $1,836.25 | $2,300.00 | $3,200.00 | $3,090.00 |
| 0078 | Casting, furnish and adjust to grade , inlet (720-01894) | EACH | 6 | $2,004.11 | $2,500.00 | $1,950.00 | $2,040.00 |
| 0079 | Inlet, type E7 (720-45030) | EACH | 1 | $4,457.87 | $5,000.00 | $3,800.00 | $3,320.00 |
| 0080 | Road closure sign assembly (801-04308) | EACH | 5 | $300.00 | $300.00 | $300.00 | $218.00 |
| 0081 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 41,901 | $1.60 | $1.60 | $1.60 | $2.06 |
| 0082 | Detour route marker assembly (801-06625) | EACH | 10 | $125.00 | $125.00 | $125.00 | $137.00 |
| 0083 | Construction sign, type A (801-06640) | EACH | 44 | $180.00 | $180.00 | $180.00 | $184.00 |
| 0084 | Construction sign, type B (801-06645) | EACH | 18 | $110.00 | $110.00 | $110.00 | $80.00 |
| 0085 | Maintaining traffic (801-06775) | LS | 1 | $75,000 | $51,600 | $75,891 | $215,622 |
| 0086 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 6 | $5,600.00 | $5,575.00 | $5,975.00 | $4,020.00 |
| 0087 | Barricade, type III-A (801-07118) | LFT | 176 | $16.00 | $16.00 | $16.00 | $13.00 |
| 0088 | Barricade, type III-B (801-07119) | LFT | 24 | $16.00 | $16.00 | $16.00 | $13.00 |
| 0089 | Temporary pavement marking, 24 in. (801-07612) | LFT | 280 | $12.00 | $12.00 | $12.00 | $13.97 |
| 0090 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 945 | $50.00 | $61.83 | $68.00 | $61.00 |
| 0091 | Temporary curb ramp (801-11990) | EACH | 4 | $2,100.00 | $400.00 | $500.00 | $2,000.00 |
| 0092 | Temporary accessible pedestrian path (801-12641) | SYS | 325 | $40.00 | $36.00 | $10.00 | $43.85 |
| 0093 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $815.00 | $815.00 | $815.00 | $264.00 |
| 0094 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 132 | $20.00 | $30.00 | $50.00 | $30.00 |
| 0095 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 89 | $26.00 | $30.00 | $40.00 | $30.00 |
| 0096 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $300.00 | $350.00 | $250.00 | $350.00 |
| 0097 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $2,000.00 | $1,000.00 | $2,000.00 | $1,000.00 |
| 0098 | Rectangular rapid flashing beacon (805-11799) | EACH | 4 | $10,000 | $9,800.00 | $10,000 | $9,800.00 |
| 0099 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 210 | $12.00 | $12.00 | $12.00 | $13.50 |
| 0100 | Line, remove (808-06716) | LFT | 26,198 | $0.50 | $0.50 | $0.50 | $0.38 |
| 0101 | Retro-reflectivity testing (808-09381) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $7,480.00 |
| 0102 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 9,784 | $1.00 | $1.00 | $1.00 | $1.33 |
| 0103 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 9,015 | $1.00 | $1.00 | $1.00 | $1.32 |
| 0104 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 1,851 | $1.40 | $1.40 | $1.40 | $1.32 |
| 0105 | Grooving for pavement markings (808-12032) | LFT | 14,918 | $0.60 | $0.60 | $0.60 | $0.62 |
| 0106 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 272 | $6.75 | $6.75 | $6.75 | $4.72 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.