INDOT contract R-43599-A bid tabulation
INTERSECTION IMPROVEMENT, ROUNDABOUT. Let by Indiana DOT on February 11, 2026, Boone, Crawfordsville. 7 bids received; low bid $1,877,994 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 112
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $1,877,994 | Low |
| 2 | Calumet Civil Contractors Inc | $1,982,000 | +6.0% |
| 3 | Milestone Contractors LP | $1,983,500 | +6.0% |
| 4 | Rieth-Riley Construction Co., Inc. | $1,984,582 | +6.0% |
| 5 | William Charles Construction Company | $2,060,995 | +10% |
| 6 | His Constructors Inc | $2,241,014 | +19% |
| 7 | Morphey Construction Inc. | $2,275,000 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Calumet Civil Contractors Inc | 3. Milestone Contractors LP | 4. Rieth-Riley Construction Co., Inc. | 5. William Charles Construction Company | 6. His Constructors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $38,368 | $25,000 | $54,991 | $21,770 | $35,000 | $38,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $119,157 | $76,940 | $99,175 | $63,620 | $103,000 | $130,237 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $17,871 | $10,000 | $39,500 | $24,966 | $8,000.00 | $9,800.00 |
| 0012 | Concrete, remove (202-93615) | SYS | 15 | $24.42 | $40.00 | $50.00 | $60.96 | $77.40 | $90.00 |
| 0013 | Pipe, remove (202-96133) | LFT | 155 | $11.54 | $18.00 | $35.00 | $20.36 | $59.00 | $31.00 |
| 0014 | Excavation, common (203-02000) | CYS | 3,361 | $48.00 | $20.00 | $30.00 | $38.38 | $26.80 | $20.00 |
| 0015 | Borrow (203-02070) | CYS | 3,018 | $0.01 | $18.00 | $5.00 | $0.01 | $0.01 | $38.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 31,596 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $25,938 | $24,000 | $12,000 | $8,822.46 | $45,000 | $35,000 |
| 0018 | SWQCP preparation (205-12618) | LS | 1 | $2,500.00 | $2,500.00 | $3,500.00 | $3,500.00 | $3,600.00 | $3,800.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 461 | $25.00 | $19.50 | $20.00 | $22.97 | $23.30 | $35.00 |
| 0020 | Subgrade treatment, type III (207-08266) | SYS | 902 | $6.00 | $5.00 | $4.50 | $2.67 | $2.65 | $0.70 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 6,608 | $27.00 | $26.00 | $27.00 | $28.53 | $29.90 | $42.00 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 1,564 | $78.00 | $71.00 | $65.00 | $69.96 | $0.01 | $85.00 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 849 | $65.00 | $83.00 | $80.00 | $84.93 | $82.00 | $79.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 85 | $48.00 | $66.00 | $65.00 | $64.28 | $66.20 | $46.00 |
| 0025 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 37 | $103.00 | $30.00 | $55.00 | $16.01 | $18.10 | $14.00 |
| 0026 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 405 | $133.00 | $122.00 | $126.00 | $121.90 | $110.50 | $143.00 |
| 0027 | QC/QA-HMA, 3, 58S, intermediate, 12.5 MM (401-000029) | TON | 670 | $98.00 | $85.00 | $105.00 | $101.07 | $98.40 | $105.00 |
| 0028 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,093 | $84.00 | $85.00 | $92.00 | $92.97 | $84.40 | $90.00 |
| 0029 | QC/QA-HMA, 3, 58E, intermediate, OG, 19.0 MM (401-000062) | TON | 786 | $82.00 | $80.00 | $82.00 | $94.77 | $92.40 | $88.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 2,102 | $0.30 | $0.50 | $0.77 | $0.55 | $0.50 | $0.35 |
| 0031 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 2,102 | $2.00 | $7.50 | $10.80 | $7.60 | $7.55 | $10.00 |
| 0032 | Asphalt for tack coat (406-05520) | TON | 8 | $0.01 | $0.01 | $540.00 | $0.01 | $0.01 | $0.05 |
| 0033 | PCCP, 8 in. (502-06999) | SYS | 379 | $83.00 | $91.00 | $64.00 | $97.96 | $90.00 | $89.00 |
| 0034 | PCCP, 4 in. (502-11543) | SYS | 349 | $49.00 | $82.00 | $43.00 | $63.00 | $74.80 | $53.00 |
| 0035 | D-1 contraction joint (503-05240) | LFT | 393 | $16.00 | $16.00 | $19.00 | $15.18 | $26.20 | $17.00 |
| 0036 | Curb, concrete (605-06120) | LFT | 972 | $28.00 | $33.00 | $40.00 | $29.64 | $35.80 | $30.00 |
| 0037 | Curb and gutter, concrete , modified (605-06140) | LFT | 2,250 | $28.00 | $33.00 | $27.00 | $33.50 | $39.70 | $30.00 |
| 0038 | Center curb, concrete, type D (605-06255) | SYS | 15 | $313.00 | $238.00 | $290.00 | $254.57 | $287.00 | $325.00 |
| 0039 | Curb and gutter, rolled curb , modified (605-97937) | LFT | 378 | $26.00 | $46.00 | $50.00 | $30.54 | $78.40 | $28.00 |
| 0040 | PCCP for approaches, 6 in. (610-08446) | SYS | 461 | $65.00 | $80.00 | $65.00 | $77.59 | $74.80 | $70.00 |
| 0041 | Mailbox assembly, single (611-06497) | EACH | 2 | $450.00 | $450.00 | $450.00 | $164.69 | $452.00 | $480.00 |
| 0042 | Right-of-way marker (615-06490) | EACH | 29 | $350.00 | $350.00 | $350.00 | $330.69 | $351.50 | $375.00 |
| 0043 | Monument, section corner , RE-establish (615-06527) | EACH | 1 | $800.00 | $800.00 | $800.00 | $459.93 | $803.50 | $860.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 37 | $106.24 | $80.00 | $60.00 | $157.89 | $158.50 | $106.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 48 | $19.86 | $4.00 | $15.00 | $9.65 | $3.10 | $14.00 |
| 0046 | Sodding, nursery (621-06575) | SYS | 8,747 | $5.00 | $10.00 | $5.00 | $5.00 | $5.65 | $5.35 |
| 0047 | Field office, type C (628-09403) | MOS | 12 | $3,350.00 | $3,250.00 | $2,750.00 | $3,750.02 | $2,500.00 | $3,050.00 |
| 0048 | Computer system equipment (628-11976) | EACH | 1 | $700.00 | $1,500.00 | $2,000.00 | $1,102.95 | $500.00 | $195.00 |
| 0049 | Topsoil processing and distribution (629-000149) | SYS | 8,748 | $2.25 | $2.00 | $7.84 | $7.01 | $6.95 | $2.15 |
| 0050 | Topsoil amendment budget (629-000150) | DOL | 17,495 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0051 | Pipe, type 2, circular, diameter 36 in. (715-05024) | LFT | 101 | $118.00 | $150.00 | $155.00 | $173.30 | $335.00 | $183.00 |
| 0052 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 2,789 | $8.75 | $12.00 | $8.75 | $8.75 | $16.70 | $9.35 |
| 0053 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 76 | $45.00 | $15.00 | $45.00 | $45.00 | $37.70 | $48.30 |
| 0054 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 1,114 | $47.00 | $52.00 | $53.00 | $80.44 | $111.00 | $80.00 |
| 0055 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 277 | $53.00 | $60.00 | $57.00 | $78.98 | $139.50 | $85.00 |
| 0056 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 362 | $56.00 | $71.00 | $69.00 | $88.03 | $146.50 | $96.00 |
| 0057 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 82 | $49.00 | $67.00 | $53.00 | $69.40 | $74.90 | $80.00 |
| 0058 | Video inspection for pipe (715-09064) | LFT | 1,936 | $1.70 | $1.70 | $1.70 | $1.60 | $1.95 | $2.00 |
| 0059 | Pipe end section, diameter 12 in. (715-46000) | EACH | 7 | $702.00 | $1,500.00 | $1,100.00 | $914.99 | $1,276.00 | $1,715.00 |
| 0060 | Pipe end section, diameter 36 in. (715-46040) | EACH | 1 | $1,900.00 | $2,000.00 | $2,210.00 | $2,094.85 | $5,476.00 | $2,820.00 |
| 0061 | Outlet protector, type 3 , modified (718-06531) | EACH | 4 | $2,950.00 | $400.00 | $3,325.00 | $3,325.00 | $1,000.00 | $3,570.00 |
| 0062 | Video inspection for underdrain (718-06532) | LFT | 2,789 | $1.20 | $1.20 | $1.20 | $1.60 | $1.35 | $2.00 |
| 0063 | Geotextile for underdrains, type 1A (718-12305) | SYS | 2,695 | $3.75 | $1.00 | $3.75 | $3.75 | $1.45 | $4.00 |
| 0064 | Aggregate for underdrains (718-52610) | CYS | 278 | $79.90 | $71.00 | $79.90 | $79.90 | $81.40 | $85.00 |
| 0065 | Manhole, type J15, modified (720-01092) | EACH | 1 | $6,550.00 | $7,000.00 | $4,500.00 | $7,915.43 | $5,628.00 | $6,765.00 |
| 0066 | Manhole, type C15 (720-03757) | EACH | 4 | $4,670.00 | $6,500.00 | $3,550.00 | $5,203.90 | $5,114.00 | $5,235.00 |
| 0067 | Inlet, type J10 (720-45045) | EACH | 7 | $3,100.00 | $3,500.00 | $2,470.00 | $3,887.62 | $3,492.00 | $4,080.00 |
| 0068 | Inlet, type M10 (720-45055) | EACH | 3 | $3,100.00 | $3,500.00 | $2,470.00 | $3,887.62 | $3,492.00 | $4,080.00 |
| 0069 | Catch basin, type J10 (720-45240) | EACH | 4 | $3,810.00 | $5,800.00 | $2,800.00 | $4,205.27 | $3,935.00 | $4,440.00 |
| 0070 | Pipe catch basin, 12 in. (720-45260) | EACH | 3 | $1,760.00 | $2,500.00 | $2,005.00 | $2,370.80 | $2,510.00 | $3,060.00 |
| 0071 | Manhole, type C4 (720-45410) | EACH | 2 | $4,610.00 | $5,700.00 | $3,100.00 | $4,479.40 | $3,783.00 | $4,965.00 |
| 0072 | Manhole, type M4 (720-95335) | EACH | 1 | $18,000 | $21,000 | $12,500 | $24,745 | $11,745 | $19,725 |
| 0073 | Manhole, type J4 (720-95422) | EACH | 1 | $5,550.00 | $6,000.00 | $3,750.00 | $6,458.47 | $4,274.00 | $5,685.00 |
| 0074 | Manhole, type D7 , modified (720-97218) | EACH | 1 | $6,990.00 | $9,000.00 | $6,500.00 | $9,410.86 | $11,970 | $6,800.00 |
| 0075 | Catch basin, type M10 (720-98687) | EACH | 7 | $3,810.00 | $14,000 | $3,000.00 | $4,205.27 | $3,478.00 | $6,760.00 |
| 0076 | Road closure sign assembly (801-04308) | EACH | 10 | $275.00 | $275.00 | $275.00 | $275.00 | $276.00 | $260.00 |
| 0077 | Detour route marker assembly (801-06625) | EACH | 49 | $125.00 | $125.00 | $125.00 | $125.00 | $125.50 | $160.00 |
| 0078 | Construction sign, type A (801-06640) | EACH | 36 | $165.00 | $165.00 | $165.00 | $165.00 | $165.50 | $212.00 |
| 0079 | Construction sign, type B (801-06645) | EACH | 4 | $90.00 | $90.00 | $90.00 | $90.00 | $90.40 | $110.00 |
| 0080 | Maintaining traffic (801-06775) | LS | 1 | $4,653.71 | $25,000 | $75,000 | $12,140 | $10,000 | $24,073 |
| 0081 | Barricade, type III-A (801-07118) | LFT | 96 | $16.00 | $16.00 | $16.00 | $16.00 | $16.10 | $17.00 |
| 0082 | Barricade, type III-B (801-07119) | LFT | 144 | $16.00 | $16.00 | $16.00 | $16.00 | $16.10 | $17.00 |
| 0083 | Sign, sheet, remove (802-04089) | EACH | 9 | $100.00 | $100.00 | $100.00 | $66.00 | $228.00 | $70.00 |
| 0084 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 226 | $24.00 | $24.00 | $24.00 | $30.00 | $42.50 | $32.00 |
| 0085 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 100 | $25.00 | $25.00 | $25.00 | $27.00 | $38.80 | $29.00 |
| 0086 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 80 | $24.00 | $24.00 | $24.00 | $25.85 | $39.70 | $28.00 |
| 0087 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 98 | $26.00 | $26.00 | $26.00 | $28.05 | $42.90 | $30.00 |
| 0088 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 632 | $35.00 | $35.00 | $35.00 | $30.00 | $52.50 | $32.00 |
| 0089 | Handhole, lighting (807-02191) | EACH | 3 | $1,800.00 | $1,800.00 | $1,800.00 | $1,400.00 | $1,726.00 | $1,505.00 |
| 0090 | Lighting foundation, concrete, with grounding, 24 in. X 24 in. X 96 in. (807-03758) | EACH | 4 | $3,200.00 | $3,200.00 | $3,200.00 | $2,200.00 | $3,717.00 | $2,365.00 |
| 0091 | Luminaire , LED cobra head roadway (807-04866) | EACH | 4 | $571.00 | $571.00 | $571.00 | $400.00 | $918.00 | $430.00 |
| 0092 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 207 | $35.00 | $35.00 | $35.00 | $30.00 | $52.50 | $32.00 |
| 0093 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 580 | $22.00 | $22.00 | $22.00 | $18.00 | $27.60 | $20.00 |
| 0094 | Light pole, 40 FT E.M.H., 20 FT mast arm, breakaway base (807-11768) | EACH | 1 | $5,853.00 | $5,853.00 | $5,853.00 | $5,200.00 | $6,241.00 | $5,585.00 |
| 0095 | Cable, pole circuit, XHHW, no. 10 copper, stranded, 1/C (807-12343) | LFT | 192 | $1.50 | $1.50 | $1.50 | $2.00 | $1.30 | $2.15 |
| 0096 | Light pole, 40 FT E.M.H., 20 FT mast arm, anchor base (807-12663) | EACH | 1 | $5,240.00 | $5,240.00 | $5,240.00 | $4,600.00 | $5,326.00 | $4,940.00 |
| 0097 | Light pole, 40 FT E.M.H., 15 FT mast arm, breakaway base (807-85762) | EACH | 2 | $4,846.00 | $4,846.00 | $4,846.00 | $4,600.00 | $5,326.00 | $4,940.00 |
| 0098 | Service point, type I (807-86805) | EACH | 1 | $1,800.00 | $1,800.00 | $1,800.00 | $9,000.00 | $11,845 | $9,660.00 |
| 0099 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 576 | $1.50 | $1.50 | $1.50 | $1.50 | $1.10 | $1.60 |
| 0100 | Connector kit, unfused (807-86910) | EACH | 4 | $65.00 | $65.00 | $65.00 | $35.00 | $73.20 | $38.00 |
| 0101 | Connector kit, fused (807-86915) | EACH | 4 | $65.00 | $65.00 | $65.00 | $35.00 | $68.30 | $38.00 |
| 0102 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 6 | $20.00 | $20.00 | $20.00 | $30.00 | $44.80 | $32.00 |
| 0103 | Insulation link, non- waterproofed (807-86930) | EACH | 6 | $20.00 | $20.00 | $20.00 | $30.00 | $26.80 | $32.00 |
| 0104 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 495 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.25 |
| 0105 | Line, thermoplastic, dotted, white, 8 in. (808-11478) | LFT | 55 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 | $4.50 |
| 0106 | Grooving for pavement markings (808-12032) | LFT | 3,488 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0107 | Transverse marking, thermoplastic, yield line, white, 36 in. (808-12148) | LFT | 71 | $20.00 | $20.00 | $20.00 | $20.00 | $20.10 | $21.00 |
| 0108 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 2,938 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0109 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 76 | $6.50 | $6.50 | $6.50 | $6.50 | $6.55 | $7.50 |
| 0110 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 12 | $140.00 | $140.00 | $140.00 | $140.00 | $140.50 | $234.00 |
| 0111 | Snowplowable raised pavement marker (808-75998) | EACH | 55 | $40.00 | $40.00 | $40.00 | $40.00 | $40.20 | $52.00 |
| 0112 | HMA for sidewalk (604-05528) | TON | 200 | $106.00 | $115.00 | $150.00 | $132.41 | $150.50 | $114.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.