INDOT contract R-43697-A bid tabulation
SMALL STRUCTURES AND DRAINS CONSTRUCTION. Let by Indiana DOT on January 14, 2026, Fountain, Parke, Crawfordsville. 4 bids received; low bid $785,773 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 49
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $785,773 | Low |
| 2 | Calumet Civil Contractors Inc | $790,000 | +1.0% |
| 3 | Morphey Construction Inc. | $930,000 | +18% |
| 4 | Rieth-Riley Construction Co., Inc. | $986,032 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Calumet Civil Contractors Inc | 3. Morphey Construction Inc. | 4. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $14,935 | $8,800.00 | $7,000.00 | $10,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $49,500 | $34,456 | $46,500 | $90,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $31,000 | $20,700 | $15,000 | $30,000 |
| 0011 | Pipe, remove (202-96133) | LFT | 168 | $270.00 | $138.60 | $55.00 | $700.00 |
| 0012 | Excavation, common (203-02000) | CYS | 195 | $185.00 | $174.71 | $40.00 | $99.00 |
| 0013 | Borrow (203-02070) | CYS | 1,013 | $0.01 | $76.34 | $49.00 | $58.00 |
| 0014 | Pump around (205-11626) | EACH | 1 | $18,000 | $27,601 | $10,000 | $13,100 |
| 0015 | Stormwater management budget (205-12108) | DOL | 15,222 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $29,250 | $660.00 | $3,700.00 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 480 | $50.00 | $46.88 | $50.00 | $51.00 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 1,899 | $112.00 | $111.13 | $95.00 | $105.00 |
| 0019 | Geogrid, type IB (214-11796) | SYS | 480 | $2.90 | $0.77 | $5.00 | $1.00 |
| 0020 | Compacted aggregate, no. 8 (301-12233) | CYS | 89 | $130.00 | $135.49 | $155.00 | $76.00 |
| 0021 | Compacted aggregate, no. 53 (303-01180) | TON | 51 | $88.00 | $96.01 | $60.00 | $138.00 |
| 0022 | Widening with HMA, type B (304-07493) | TON | 113 | $178.00 | $136.56 | $230.00 | $178.00 |
| 0023 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 16 | $500.00 | $423.25 | $440.00 | $280.00 |
| 0024 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 26 | $350.00 | $276.00 | $300.00 | $280.00 |
| 0025 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 62 | $200.00 | $237.91 | $175.00 | $198.00 |
| 0026 | Joint adhesive (401-11526) | LFT | 928 | $0.85 | $2.42 | $5.00 | $1.00 |
| 0027 | Asphalt for tack coat (406-05520) | TON | 1 | $540.00 | $1,593.45 | $520.00 | $1.00 |
| 0028 | Guardrail, remove (601-02241) | LFT | 496 | $9.25 | $3.00 | $9.25 | $9.25 |
| 0029 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 319 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0030 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,500.00 | $3,100.00 | $2,500.00 | $2,500.00 |
| 0031 | Right-of-way marker (615-06490) | EACH | 18 | $175.00 | $157.00 | $175.00 | $175.00 |
| 0032 | Riprap, class 1 (616-05688) | TON | 16 | $250.00 | $151.39 | $200.00 | $181.00 |
| 0033 | Riprap, revetment (616-06405) | TON | 17 | $170.00 | $119.73 | $150.00 | $158.00 |
| 0034 | Geotextile for riprap, type 2B (616-12249) | SYS | 64 | $15.00 | $26.22 | $5.00 | $20.00 |
| 0035 | Mulched seeding, type R (621-06559) | SYS | 1,520 | $1.65 | $12.72 | $7.00 | $1.65 |
| 0036 | Plant, deciduous tree, single stem, 1.25 in. to 2 in. (622-05649) | EACH | 12 | $600.00 | $1,000.00 | $590.00 | $590.00 |
| 0037 | Field office, type C (628-09403) | MOS | 9 | $5,000.00 | $3,456.00 | $2,200.00 | $6,800.00 |
| 0038 | Computer system equipment (628-11976) | EACH | 1 | $1,500.00 | $1,725.00 | $1,000.00 | $405.00 |
| 0039 | Temporary shoring (702-04325) | LS | 1 | $0.01 | $36,000 | $72,946 | $20,000 |
| 0040 | Pipe, type 1, circular, diameter 42 in. (715-05127) | LFT | 149 | $905.00 | $482.88 | $1,900.00 | $1,071.00 |
| 0041 | Road closure sign assembly (801-04308) | EACH | 10 | $300.00 | $300.00 | $150.00 | $150.00 |
| 0042 | Detour route marker assembly (801-06625) | EACH | 37 | $115.00 | $115.00 | $75.00 | $75.00 |
| 0043 | Construction sign, type A (801-06640) | EACH | 6 | $180.00 | $180.00 | $200.00 | $200.00 |
| 0044 | Maintaining traffic (801-06775) | LS | 1 | $15,000 | $1,542.00 | $47,824 | $47,000 |
| 0045 | Barricade, type III-A (801-07118) | LFT | 48 | $16.00 | $16.00 | $15.00 | $15.00 |
| 0046 | Barricade, type III-B (801-07119) | LFT | 192 | $16.00 | $16.00 | $15.00 | $15.00 |
| 0047 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 595 | $1.00 | $1.00 | $3.00 | $3.00 |
| 0048 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 102 | $1.00 | $1.00 | $3.00 | $3.00 |
| 0049 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.