INDOT contract R-44401-A bid tabulation
HMA OVERLAY, BRIDGE REMOVAL AND REPLACEMENT. Let by Indiana DOT on April 8, 2026, Clay, Vigo, Crawfordsville. 2 bids received; low bid $23,263,700 by Milestone Contractors South LLC.
- Owner
- Indiana DOT
- Letting
- 08 APR 2026
- Pay items
- 133
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors South LLC | $23,263,700 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $24,460,000 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors South LLC | 2. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $40,000 | $50,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 |
| 0011 | Special maintenance , bridge deck patching (109-12573) | DOL | 50,000 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $1,000,000 | $1,308,112 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $348,838 | $100,000 |
| 0014 | Pavement removal (202-02240) | SYS | 4,224 | $10.00 | $30.00 |
| 0015 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $100,000 | $170,000 |
| 0016 | Present structure, remove, structure no. 2 (202-51330) | LS | 1 | $100,000 | $171,000 |
| 0017 | Slopewall, remove (202-51368) | SYS | 926 | $23.00 | $22.50 |
| 0018 | Inlet, remove (202-91385) | EACH | 2 | $550.00 | $800.00 |
| 0019 | Fence, chain link, remove (202-91840) | LFT | 149 | $25.00 | $22.00 |
| 0020 | Guardrail end treatment, remove (202-93741) | EACH | 16 | $400.00 | $400.00 |
| 0021 | Pipe, remove (202-96133) | LFT | 192 | $37.00 | $25.00 |
| 0022 | Pipe end section, remove (202-98488) | EACH | 1 | $550.00 | $400.00 |
| 0023 | Excavation, common (203-02000) | CYS | 9,315 | $40.00 | $46.00 |
| 0024 | Borrow (203-02070) | CYS | 52,400 | $35.00 | $28.00 |
| 0025 | Linear grading (203-08607) | LFT | 105,600 | $2.30 | $2.70 |
| 0026 | Pump around (205-11626) | EACH | 1 | $100,000 | $92,095 |
| 0027 | Stormwater management budget (205-12108) | DOL | 415,304 | $1.00 | $1.00 |
| 0028 | Stormwater management implementation (205-12616) | LS | 1 | $20,000 | $100,000 |
| 0029 | SWQCP preparation (205-12618) | LS | 1 | $12,000 | $10,000 |
| 0030 | Excavation, foundation, unclassified (206-51230) | CYS | 50 | $75.00 | $275.00 |
| 0031 | Subgrade treatment, type IC (207-09935) | SYS | 17,458 | $26.00 | $20.00 |
| 0032 | Subgrade treatment, type ibc (207-12635) | SYS | 9,874 | $13.00 | $12.00 |
| 0033 | B borrow (211-02050) | CYS | 2,507 | $75.00 | $89.00 |
| 0034 | Structure backfill, type 2 (211-09265) | CYS | 7,687 | $75.00 | $72.00 |
| 0035 | Structure backfill, type 3 (211-09266) | CYS | 821 | $75.00 | $85.00 |
| 0036 | Flowable backfill, non- removable (213-09269) | CYS | 41 | $360.00 | $418.00 |
| 0037 | Drying soils for embankment (217-11917) | TON | 229 | $270.00 | $310.00 |
| 0038 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,488 | $32.00 | $64.00 |
| 0039 | Compacted aggregate, no. 53 (303-01180) | TON | 2,079 | $35.00 | $34.00 |
| 0040 | Compacted aggregate, no. 73 (303-07449) | TON | 5,299 | $45.00 | $50.00 |
| 0041 | HMA patching, partial depth, type D (304-12628) | TON | 6,465 | $230.00 | $230.00 |
| 0042 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 117,593 | $2.00 | $1.85 |
| 0043 | Milling, asphalt, 2 in. (306-08036) | SYS | 329,245 | $2.50 | $2.25 |
| 0044 | Milling, transition (306-08043) | SYS | 1,359 | $12.00 | $2.25 |
| 0045 | Milling, approach (306-08432) | SYS | 1,115 | $8.00 | $2.25 |
| 0046 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 9,706 | $111.00 | $122.00 |
| 0047 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 37,165 | $111.00 | $122.00 |
| 0048 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 1,379 | $112.00 | $105.00 |
| 0049 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 5,763 | $92.00 | $90.00 |
| 0050 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 1,339 | $108.00 | $95.00 |
| 0051 | Joint adhesive (401-11526) | LFT | 18,171 | $0.40 | $0.65 |
| 0052 | Inertial profiler, HMA (401-12169) | LS | 1 | $13,000 | $8,000.00 |
| 0053 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 220,379 | $4.00 | $3.37 |
| 0054 | HMA for temporary pavement, type D (402-10087) | TON | 7,956 | $128.00 | $135.00 |
| 0055 | Asphalt for tack coat (406-05520) | TON | 181 | $720.00 | $1.00 |
| 0056 | Cracks in asphalt pavement, fill (408-12028) | TON | 12.10 | $1,000.00 | $5,000.00 |
| 0057 | Joint repair, partial depth (509-12191) | SFT | 370 | $390.00 | $125.00 |
| 0058 | Joint repair, bottom-half (509-12192) | SFT | 84 | $445.00 | $125.00 |
| 0059 | Guardrail, remove (601-02241) | LFT | 10,177 | $2.00 | $2.00 |
| 0060 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 9,019 | $21.00 | $21.25 |
| 0061 | Guardrail height transition, MGS (601-12289) | EACH | 6 | $925.00 | $925.00 |
| 0062 | Guardrail transition, MGS without curb (601-12292) | EACH | 7 | $3,600.00 | $3,600.00 |
| 0063 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 8 | $1,300.00 | $1,275.00 |
| 0064 | Guardrail end treatment, type OS (601-94689) | EACH | 19 | $2,750.00 | $2,750.00 |
| 0065 | Fence, chain link, 48 in. (603-06045) | LFT | 257 | $60.00 | $58.00 |
| 0066 | Milled HMA corrugations, conventional (606-12399) | LFT | 216,299 | $0.40 | $0.55 |
| 0067 | HMA for approaches, type B (610-07487) | TON | 92 | $225.00 | $300.00 |
| 0068 | Monument, type B (615-06505) | EACH | 4 | $1,100.00 | $1,050.00 |
| 0069 | Riprap, class 1 (616-05688) | TON | 2,544 | $90.00 | $135.00 |
| 0070 | Riprap, revetment (616-06405) | TON | 8 | $200.00 | $280.96 |
| 0071 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,942 | $4.00 | $1.25 |
| 0072 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $950.00 | $950.00 |
| 0073 | Seed mixture, type R (621-06553) | LBS | 1,496 | $9.50 | $10.01 |
| 0074 | Mulching material (621-06565) | TON | 15 | $765.00 | $815.00 |
| 0075 | Water (621-06567) | KGAL | 11 | $35.00 | $37.50 |
| 0076 | Sodding (621-06574) | SYS | 2,665 | $7.50 | $7.57 |
| 0077 | Seed mixture, floodplain (621-12612) | LBS | 2 | $390.00 | $413.00 |
| 0078 | Field office, type E (628-12684) | MOS | 20 | $4,500.00 | $7,000.00 |
| 0079 | Topsoil processing and distribution (629-000149) | SYS | 35,739 | $7.00 | $6.00 |
| 0080 | Topsoil amendment budget (629-000150) | DOL | 71,478 | $1.00 | $1.00 |
| 0081 | Concrete, B, footings (702-51015) | CYS | 49.20 | $670.00 | $775.00 |
| 0082 | Waterproofing membrane, type 2 (714-000086) | SFT | 18,632 | $1.30 | $3.25 |
| 0083 | Pipe connection collar and pad (715-04482) | EACH | 1 | $2,000.00 | $3,500.00 |
| 0084 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 3,926 | $13.00 | $15.00 |
| 0085 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 564 | $15.00 | $35.00 |
| 0086 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 304 | $80.00 | $75.00 |
| 0087 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 222 | $90.00 | $80.00 |
| 0088 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 165 | $85.00 | $85.00 |
| 0089 | Video inspection for pipe (715-09064) | LFT | 498 | $6.50 | $5.00 |
| 0090 | Pipe end section, diameter 12 in. (715-46000) | EACH | 1 | $2,400.00 | $850.00 |
| 0091 | Pipe end section, diameter 15 in. (715-46005) | EACH | 1 | $2,500.00 | $900.00 |
| 0092 | Pipe end section, diameter 18 in. (715-46010) | EACH | 1 | $2,600.00 | $950.00 |
| 0093 | Outlet protector, type 1 (718-06528) | EACH | 4 | $4,500.00 | $2,500.00 |
| 0094 | Video inspection for underdrain (718-06532) | LFT | 13,000 | $1.50 | $1.00 |
| 0095 | Underdrain outlet cleaning (718-09979) | EACH | 66 | $200.00 | $600.00 |
| 0096 | Geotextile for underdrains, type 1B (718-12306) | SYS | 2,691 | $4.00 | $5.00 |
| 0097 | Aggregate for underdrains (718-52610) | CYS | 311 | $70.00 | $100.00 |
| 0098 | Inlet, type P12A (720-45070) | EACH | 1 | $4,000.00 | $6,500.00 |
| 0099 | Inlet, type P12A, modified (720-95310) | EACH | 5 | $4,200.00 | $6,500.00 |
| 0100 | Structure, reinforced concrete, three-sided (723-000182) | LFT | 288 | $7,450.00 | $8,753.00 |
| 0101 | Temporary wire-facing (735-10241) | SFT | 2,937 | $12.00 | $12.00 |
| 0102 | Temporary wall erection (735-10242) | SFT | 2,937 | $27.00 | $21.00 |
| 0103 | Smart arrow board (801-000138) | DAY | 180 | $10.00 | $20.00 |
| 0104 | Work zone presence lighting (801-000160) | EACH | 12 | $18,000 | $5,900.00 |
| 0105 | Connected work zone location markers (801-000209) | EACH | 8 | $1,500.00 | $2,030.00 |
| 0106 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 44,111 | $1.60 | $2.07 |
| 0107 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 5,375 | $2.00 | $2.75 |
| 0108 | Construction sign, type A (801-06640) | EACH | 100 | $275.00 | $290.00 |
| 0109 | Construction sign, type B (801-06645) | EACH | 9 | $125.00 | $106.00 |
| 0110 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 1,494 | $17.00 | $21.00 |
| 0111 | Maintaining traffic (801-06775) | LS | 1 | $310,000 | $750,000 |
| 0112 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $9,500.00 | $9,350.00 |
| 0113 | Barricade, type III-A (801-07118) | LFT | 360 | $19.00 | $18.00 |
| 0114 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,137 | $67.00 | $45.00 |
| 0115 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,024 | $70.00 | $55.00 |
| 0116 | Portable changeable message sign (801-11642) | EACH | 9 | $5,500.00 | $5,471.00 |
| 0117 | Truck mounted attenuator (801-12042) | DAY | 180 | $900.00 | $1,300.00 |
| 0118 | Law enforcement officer (801-12324) | HRS | 1,490 | $60.00 | $60.00 |
| 0119 | Automated work zone information system (801-12421) | LS | 1 | $40,000 | $33,920 |
| 0120 | Digital speed limit sign assembly (801-12594) | EACH | 12 | $5,000.00 | $4,981.00 |
| 0121 | Queue truck (801-12652) | DAY | 180 | $900.00 | $1,700.00 |
| 0123 | Temporary buzz strips (801-97643) | LFT | 936 | $16.00 | $23.30 |
| 0124 | Line, remove (808-06716) | LFT | 27,030 | $0.70 | $0.28 |
| 0125 | Retro-reflectivity testing (808-09381) | LS | 1 | $5,000.00 | $18,632 |
| 0126 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 105,827 | $1.00 | $1.00 |
| 0127 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 105,827 | $1.00 | $1.00 |
| 0128 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 26,520 | $1.00 | $1.05 |
| 0129 | Grooving for pavement markings (808-12032) | LFT | 258,446 | $0.50 | $0.38 |
| 0130 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 9,010 | $6.00 | $5.17 |
| 0131 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 2,253 | $6.00 | $6.13 |
| 0132 | Line, preformed plastic, solid, yellow, 6 in. (808-75057) | LFT | 9,010 | $6.00 | $5.17 |
| 0133 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 1,436 | $15.00 | $10.00 |
| 0134 | Snowplowable raised pavement marker (808-75998) | EACH | 1,436 | $35.00 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 8, 2026. Compiled by Mirage Metrics.