INDOT contract T-44353-A bid tabulation
AUXILIARY LANES, ACCEL AND DECEL OR TURN LANES. Let by Indiana DOT on December 10, 2025, Clinton, Tippecanoe, Crawfordsville. 5 bids received; low bid $2,474,000 by Calumet Civil Contractors Inc.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 72
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Calumet Civil Contractors Inc | $2,474,000 | Low |
| 2 | Morphey Construction Inc. | $2,510,000 | +1.0% |
| 3 | William Charles Construction Company | $2,630,472 | +6.0% |
| 4 | Rieth-Riley Construction Co., Inc. | $2,693,000 | +9.0% |
| 5 | Milestone Contractors LP | $2,848,360 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Calumet Civil Contractors Inc | 2. Morphey Construction Inc. | 3. William Charles Construction Company | 4. Rieth-Riley Construction Co., Inc. | 5. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $34,000 | $35,000 | $40,000 | $33,300 | $67,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $113,225 | $125,500 | $131,000 | $147,000 | $141,400 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $5,000.00 | $49,900 | $42,205 | $53,840 | $55,000 |
| 0012 | Pavement removal (202-02240) | SYS | 580 | $33.14 | $70.00 | $18.20 | $40.00 | $25.00 |
| 0013 | Inlet, remove (202-91385) | EACH | 10 | $1,149.99 | $1,000.00 | $444.50 | $850.00 | $1,600.00 |
| 0014 | Excavation, common (203-02000) | CYS | 1,850 | $69.99 | $50.00 | $83.00 | $75.00 | $95.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 18,936 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $6,447.47 | $10,000 | $35,000 | $2,500.00 | $12,000 |
| 0017 | SWQCP preparation (205-12618) | LS | 1 | $1,700.00 | $2,000.00 | $2,338.00 | $2,500.00 | $6,000.00 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 8,022 | $43.09 | $35.00 | $51.00 | $45.00 | $47.00 |
| 0019 | Structure backfill, type 2 (211-09265) | CYS | 116 | $80.23 | $150.00 | $73.90 | $130.00 | $100.00 |
| 0020 | Structure backfill, type 5 (211-09268) | CYS | 195 | $205.40 | $300.00 | $224.00 | $300.00 | $170.00 |
| 0021 | Compacted aggregate, no. 53 (301-12234) | CYS | 587 | $111.60 | $100.00 | $105.00 | $115.00 | $145.00 |
| 0022 | Compacted aggregate, no. 53 (303-01180) | TON | 1,540 | $51.57 | $70.00 | $67.10 | $60.00 | $50.00 |
| 0023 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 95 | $62.47 | $80.00 | $141.00 | $35.00 | $12.00 |
| 0024 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 569 | $202.82 | $172.00 | $172.50 | $190.00 | $200.00 |
| 0025 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 935 | $140.18 | $128.40 | $129.00 | $185.00 | $150.00 |
| 0026 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 2,991 | $96.64 | $106.00 | $106.50 | $120.00 | $120.00 |
| 0027 | Joint adhesive (401-11526) | LFT | 8,800 | $0.70 | $1.25 | $1.25 | $0.25 | $2.50 |
| 0028 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 13,200 | $8.75 | $7.00 | $8.80 | $5.00 | $8.75 |
| 0029 | Asphalt for tack coat (406-05520) | TON | 3 | $200.00 | $1.00 | $1.00 | $55.00 | $10.00 |
| 0030 | Riprap, revetment (616-06405) | TON | 17 | $129.16 | $500.00 | $341.50 | $300.00 | $325.00 |
| 0031 | Geotextile for riprap, type 2A (616-12248) | SYS | 51 | $18.47 | $40.00 | $16.80 | $15.00 | $15.00 |
| 0032 | Mobilization and demobilization for seeding (621-01004) | EACH | 8 | $300.00 | $1,000.00 | $301.50 | $300.00 | $300.00 |
| 0033 | Sodding, nursery (621-06575) | SYS | 7,878 | $10.42 | $10.00 | $6.10 | $8.25 | $6.08 |
| 0034 | Field office, type C (628-09403) | MOS | 10 | $3,147.05 | $2,000.00 | $2,500.00 | $4,400.00 | $4,700.00 |
| 0035 | Mobile internet service , 1 each (628-09409) | MOS | 10 | $1,695.00 | $1,000.00 | $150.50 | $130.00 | $110.00 |
| 0036 | Computer system equipment (628-11976) | EACH | 2 | $1,695.00 | $1,000.00 | $1,004.00 | $1,000.00 | $1,600.00 |
| 0037 | Computer system (628-11977) | EACH | 1 | $1,695.00 | $1,000.00 | $3,013.00 | $2,000.00 | $225.00 |
| 0038 | Topsoil processing and distribution (629-000149) | SYS | 7,878 | $10.00 | $9.00 | $3.60 | $10.00 | $15.00 |
| 0039 | Topsoil amendment budget (629-000150) | DOL | 15,756 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0040 | Pipe, type 2, circular, diameter 15 in. (715-05032) | LFT | 420 | $90.65 | $70.00 | $107.50 | $135.00 | $120.00 |
| 0041 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 898 | $82.00 | $70.00 | $93.20 | $105.00 | $115.00 |
| 0042 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 363 | $117.31 | $80.00 | $102.50 | $115.00 | $85.00 |
| 0043 | PCCP for structure installation (715-08283) | SYS | 80 | $203.41 | $100.00 | $260.50 | $340.00 | $500.00 |
| 0044 | HMA for structure installation, type D (715-08307) | TON | 111 | $179.22 | $200.00 | $340.50 | $150.00 | $200.00 |
| 0045 | Video inspection for pipe (715-09064) | LFT | 1,681 | $1.95 | $2.00 | $3.50 | $2.00 | $1.95 |
| 0046 | Pipe end section, diameter 12 in. (715-46000) | EACH | 4 | $1,998.23 | $1,000.00 | $1,234.00 | $750.00 | $1,400.00 |
| 0047 | Pipe end section, diameter 15 in. (715-46005) | EACH | 4 | $2,178.37 | $1,200.00 | $1,413.00 | $800.00 | $1,500.00 |
| 0048 | Pipe end section, diameter 18 in. (715-46010) | EACH | 1 | $3,226.24 | $2,000.00 | $1,544.00 | $1,000.00 | $1,600.00 |
| 0049 | Inlet, type P12A (720-45070) | EACH | 23 | $3,800.49 | $5,000.00 | $5,027.00 | $4,500.00 | $4,500.00 |
| 0050 | Inlet, type R13 (720-45075) | EACH | 1 | $5,276.22 | $4,000.00 | $3,817.00 | $3,800.00 | $3,400.00 |
| 0051 | Manhole, type C4 (720-45410) | EACH | 1 | $5,495.40 | $4,000.00 | $3,413.00 | $5,100.00 | $3,500.00 |
| 0052 | Inlet, type P12A, modified (720-95310) | EACH | 7 | $4,873.11 | $4,500.00 | $5,027.00 | $5,000.00 | $4,500.00 |
| 0053 | Inlet, type M13, modified (720-96554) | EACH | 1 | $4,662.02 | $3,500.00 | $3,927.00 | $3,900.00 | $3,500.00 |
| 0054 | Inlet, type F , modified (720-97317) | EACH | 3 | $3,808.87 | $6,000.00 | $3,377.00 | $5,600.00 | $4,700.00 |
| 0055 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 51,021 | $1.65 | $2.00 | $1.65 | $1.65 | $1.65 |
| 0056 | Detour route marker assembly (801-06625) | EACH | 121 | $115.00 | $115.00 | $115.50 | $115.00 | $115.00 |
| 0057 | Construction sign, type A (801-06640) | EACH | 253 | $160.00 | $160.00 | $160.50 | $160.00 | $160.00 |
| 0058 | Construction sign, type B (801-06645) | EACH | 207 | $80.00 | $80.00 | $80.30 | $80.00 | $80.00 |
| 0059 | Flashing arrow sign (801-06710) | DAY | 720 | $7.00 | $7.00 | $7.05 | $7.00 | $7.00 |
| 0060 | Maintaining traffic (801-06775) | LS | 1 | $53,135 | $99,095 | $60,000 | $46,000 | $61,532 |
| 0061 | Barricade, type III-A (801-07118) | LFT | 1,920 | $14.00 | $14.00 | $14.10 | $14.00 | $14.00 |
| 0062 | Portable changeable message sign (801-11642) | EACH | 4 | $4,800.00 | $4,800.00 | $4,820.00 | $4,800.00 | $4,800.00 |
| 0063 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 311 | $32.00 | $30.00 | $32.10 | $32.00 | $32.00 |
| 0064 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 478 | $32.00 | $30.00 | $32.10 | $32.00 | $32.00 |
| 0065 | Line, thermoplastic, solid, white, 24 in. (808-06706) | LFT | 344 | $8.00 | $8.00 | $8.05 | $8.00 | $8.00 |
| 0066 | Retro-reflectivity testing (808-09381) | LS | 1 | $6,013.00 | $7,000.00 | $6,038.00 | $6,015.00 | $6,013.00 |
| 0067 | Grooving for pavement markings (808-12032) | LFT | 9,741 | $0.85 | $1.00 | $0.85 | $0.85 | $0.85 |
| 0068 | Line, thermoplastic, solid, white, 10 in. (808-12667) | LFT | 4,713 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0069 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 5,028 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0070 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 29 | $150.00 | $150.00 | $150.50 | $150.00 | $150.00 |
| 0071 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 29 | $50.00 | $50.00 | $50.20 | $50.00 | $50.00 |
| 0072 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 344 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.