INDOT contract B-43949-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on March 11, 2026, Madison, Greenfield. 6 bids received; low bid $1,593,977 by His Constructors Inc.

Owner
Indiana DOT
Letting
11 MAR 2026
Pay items
89
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1His Constructors Inc$1,593,977Low
2Icc Group Inc$1,748,000+10%
3William Charles Construction Company$1,779,834+12%
4E & B Paving LLC$1,819,750+14%
5Beaty Construction Inc$1,832,550+15%
6Milestone Contractors LP$1,956,200+23%
INDOT contract B-43949-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. His Constructors Inc2. Icc Group Inc3. William Charles Construction Company4. E & B Paving LLC5. Beaty Construction Inc6. Milestone Contractors LP
0001Construction engineering (105-06845)LS1$26,000$25,000$20,000$25,000$25,992$35,000
0002Inspection hole, deeper than 3 FT (107-09358)EACH5$679.00$800.00$2,000.00$950.00$1,400.00$1,100.00
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$79,699$87,000$65,850$95,000$90,500$95,000
0011Clearing right-of-way (201-52370)LS1$7,969.88$500.00$25,600$2,000.00$9,000.00$9,500.00
0012Pavement removal (202-02240)SYS2,316$32.00$14.00$30.00$20.00$25.00$17.00
0013Present structure, remove, structure no. 1 (202-51330)LS1$82,000$97,692$58,000$171,684$145,500$85,014
0014Pipe, remove (202-96133)LFT125$9.00$20.00$4.00$10.00$35.00$14.00
0015Pipe end section, remove (202-98488)EACH6$89.00$110.00$100.00$300.00$1.00$45.00
0016Excavation, common (203-02000)CYS840$35.00$24.50$40.00$120.00$25.00$70.00
0017Borrow (203-02070)CYS1,330$21.00$65.00$0.01$1.00$25.00$50.00
0018Excavation, waterway (203-51223)CYS890$38.00$30.00$20.00$75.00$35.00$35.00
0019Stormwater management budget (205-12108)DOL19,010$1.00$1.00$1.00$1.00$1.00$1.00
0020Stormwater management implementation (205-12616)LS1$8,750.00$6,600.00$11,000$20,000$4,000.00$12,500
0021SWQCP preparation (205-12618)LS1$3,250.00$3,000.00$2,000.00$17,500$4,000.00$3,250.00
0022Excavation, foundation, unclassified (206-51230)CYS95$70.00$34.00$35.00$75.00$36.00$40.00
0023Cofferdam (206-51235)LS1$16,000$26,000$10,000$5,000.00$90,000$15,000
0024Subgrade treatment, type II (207-08264)SYS68$36.00$25.00$60.00$40.00$30.00$40.00
0025Subgrade treatment, type IC (207-09935)SYS3,974$25.00$35.00$35.00$40.00$28.00$35.00
0026Aggregate for end bent backfill (211-06467)CYS46$52.00$100.00$100.00$150.00$200.00$195.00
0027Structure backfill, type 1 (211-09264)CYS20$44.00$70.00$75.00$100.00$82.00$295.00
0028Geotextile for pavement, type 2B (214-12239)SYS4,210$5.00$4.00$4.00$3.00$4.50$6.50
0029Compacted aggregate, no. 53 (301-12234)CYS12$95.00$100.00$180.00$300.00$320.00$95.00
0030Subbase for PCCP (302-06464)CYS60$155.00$85.00$150.00$150.00$110.00$250.00
0031Compacted aggregate, no. 53 (303-01180)TON311$38.00$60.00$55.00$50.00$62.75$75.00
0032Milling, transition (306-08043)SYS268$4.00$8.50$13.00$75.00$25.00$7.00
0033QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON288$130.00$130.00$152.00$152.00$130.00$190.00
0034QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON476$100.00$100.00$133.00$133.00$100.00$160.00
0035QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON1,063$95.00$95.00$109.00$109.00$95.00$150.00
0036Joint adhesive (401-11526)LFT4,878$0.20$0.20$1.00$1.00$0.20$0.60
0037Asphalt for tack coat (406-05521)SYS13,620$0.25$0.25$1.00$0.01$0.25$0.50
0038Guardrail, remove (601-02241)LFT768$2.00$2.00$2.00$2.00$4.25$2.15
0039Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT100$20.00$20.00$20.00$20.00$23.00$21.00
0040Guardrail transition, MGS without curb (601-12292)EACH4$3,000.00$3,000.00$3,000.00$3,000.00$3,550.00$3,150.00
0041Guardrail end treatment, type OS (601-94689)EACH4$2,900.00$2,900.00$2,900.00$2,900.00$2,425.00$3,045.00
0042Barrier delineator (602-06729)EACH8$14.06$28.00$75.00$5.00$28.00$30.00
0043Reinforced concrete bridge approach, 12 in. (609-06259)SYS236$225.00$195.00$200.00$160.00$190.00$189.00
0044HMA for approaches, type B (610-07487)TON15$200.00$200.00$500.00$500.00$200.00$325.00
0045Right-of-way marker (615-06490)EACH10$120.00$120.00$120.00$120.00$205.00$125.00
0046Monument, type B (615-06505)EACH3$962.00$962.00$962.00$962.00$1,400.00$1,010.00
0047Riprap, revetment (616-06405)TON1,440$39.00$60.00$80.00$50.00$70.00$55.00
0048Geotextile for riprap, type 2A (616-12248)SYS1,910$4.00$3.50$2.00$3.00$5.00$4.50
0049Mobilization and demobilization for seeding (621-01004)EACH1$500.00$1,500.00$1,500.00$800.00$500.00$525.00
0050Mulched seeding, type R (621-06559)SYS2,950$1.15$1.00$1.00$1.00$1.10$1.25
0051Water (621-06567)KGAL1$1.00$0.10$0.10$0.02$1.00$1.00
0052Sodding (621-06574)SYS34$50.00$120.00$120.00$70.00$50.00$53.00
0053Field office, type C (628-09403)MOS12$1,500.00$1,850.00$2,500.00$3,000.00$2,750.00$4,300.00
0054Topsoil processing and distribution (629-000149)SYS2,950$3.00$5.00$7.00$1.75$3.75$9.00
0055Topsoil amendment budget (629-000150)DOL5,900$1.00$1.00$1.00$1.00$1.00$1.00
0056Test pile, indicator, production (701-09558)LFT120$136.00$175.00$140.00$100.00$114.00$56.00
0057Test pile, indicator, restrike (701-09560)EACH2$750.00$1,300.00$1,240.00$2,500.00$1,650.00$2,600.00
0058Pile shoe, HP 12 X 53 (701-09739)EACH14$250.00$300.00$500.00$300.00$175.00$175.00
0059Pile, steel H, HP 12 X 53 (701-51195)LFT600$81.00$75.00$120.00$95.00$114.00$124.00
0060Concrete, C, substructure (702-92857)CYS47$950.00$1,050.00$1,080.00$1,000.00$1,150.00$1,500.00
0061Reinforcing bars, epoxy coated (703-06029)LBS57,856$1.75$1.60$1.50$1.25$1.45$1.75
0062Threaded tie bar assembly, epoxy coated (703-97936)EACH46$50.00$50.00$70.00$20.00$45.00$42.00
0063Concrete, C, superstructure (704-51002)CYS118.70$1,250.00$875.00$1,550.00$750.00$1,265.00$1,250.00
0064Railing, concrete type FC (706-11600)CYS13.40$1,500.00$1,375.00$1,200.00$1,375.00$1,060.00$1,500.00
0065Concrete bridge railing transition, type TFC (706-11620)EACH4$3,000.00$1,350.00$2,500.00$1,350.00$2,000.00$3,500.00
0066Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865)LFT278$750.00$1,100.00$775.00$700.00$725.00$700.00
0067Surface seal , bridge no. 1 (709-51821)LS1$1,500.00$0.01$2,500.00$1.00$1.00$100.00
0068Pipe, type 3, circular, diameter 15 in. (715-05169)LFT52$40.00$55.00$90.00$60.00$130.00$78.00
0069Pipe, type 3, circular, diameter 18 in. (715-05171)LFT110$42.00$60.00$60.00$70.00$135.00$89.00
0070Pipe, end bent drain, diameter 6 in. (715-05407)LFT100$14.00$15.00$15.00$20.00$12.00$24.00
0071Pipe end section, diameter 15 in. (715-46005)EACH2$498.00$350.00$830.00$1,200.00$1,350.00$566.00
0072Pipe end section, diameter 18 in. (715-46010)EACH4$538.00$400.00$930.00$1,200.00$1,400.00$616.00
0073Geotextile for underdrains, type 1A (718-12305)SYS104$9.00$4.00$6.00$3.00$7.75$7.00
0074Longitudinal grooving (722-12732)SYS531$6.00$15.00$5.00$3.00$7.75$5.50
0075Road closure sign assembly (801-04308)EACH6$258.00$258.00$258.00$500.00$260.00$271.00
0076Detour route marker assembly (801-06625)EACH24$153.00$153.00$153.00$200.00$155.00$161.00
0077Construction sign, type A (801-06640)EACH14$207.00$207.00$207.00$275.00$210.00$218.00
0078Maintaining traffic (801-06775)LS1$2,147.57$10,000$15,000$5,000.00$10,000$5,000.00
0079Barricade, type III-A (801-07118)LFT48$15.58$15.58$16.00$20.00$16.00$17.00
0080Barricade, type III-B (801-07119)LFT48$15.58$15.58$16.00$20.00$16.00$17.00
0081Sign, sheet, remove (802-04089)EACH6$90.00$90.00$90.00$90.00$61.00$95.00
0082Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT12$65.00$65.00$65.00$65.00$32.00$100.00
0083Sign, ground mounted, reset (802-91122)EACH2$100.00$100.00$100.00$100.00$316.00$105.00
0084Line, multi-component, solid, white, 6 in. (808-10049)LFT2,000$0.81$0.81$1.00$2.65$0.85$1.00
0085Line, multi-component, solid, yellow, 6 in. (808-10057)LFT780$0.81$0.81$1.00$2.65$0.85$1.00
0086Grooving for pavement markings (808-12032)LFT2,667$0.88$0.88$1.00$2.85$0.90$1.00
0087Line, multi-component, broken, yellow, 6 in. (808-12841)LFT250$1.07$1.07$1.00$2.65$1.10$1.10
0088Snowplowable raised pavement marker, remove (808-75996)EACH18$36.71$9.69$35.00$1.00$37.00$39.00
0089Snowplowable raised pavement marker (808-75998)EACH8$265.00$265.00$265.00$500.00$265.00$280.00
INDOT contract B-43949-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy