INDOT contract B-43499-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on October 7, 2026, Madison, Greenfield. 6 bids received; low bid $10,876,500 by Milestone Contractors LP.

Owner
Indiana DOT
Letting
07 OCT 2026
Pay items
106
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Milestone Contractors LP$10,876,500Low
2Superior Construction Co Inc$11,212,008+3.0%
3E & B Paving LLC$12,187,547+12%
4Rieth-Riley Construction Co., Inc.$12,254,429+13%
5Morphey Construction Inc.$13,200,000+21%
6Beaty Construction Inc$15,759,704+45%
INDOT contract B-43499-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Milestone Contractors LP2. Superior Construction Co Inc3. E & B Paving LLC4. Rieth-Riley Construction Co., Inc.5. Morphey Construction Inc.6. Beaty Construction Inc
0001Construction engineering (105-06845)LS1$55,000$135,000$185,000$28,650$50,000$110,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, pavement traffic markings (109-09377)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0011Mobilization and demobilization (110-01001)LS1$535,500$550,000$889,384$841,201$660,000$798,500
0012Clearing right-of-way (201-52370)LS1$107,000$100,000$377,364$24,628$100,000$156,700
0013Pavement removal (202-02240)SYS4,260$13.75$18.70$50.00$21.91$20.00$25.00
0014Cable barrier, remove (202-12024)LFT5,840$1.50$1.50$1.50$1.50$2.00$1.50
0015Safety terminal, remove (202-12026)EACH4$250.00$250.00$250.00$250.00$500.00$1,000.00
0016Present structure, remove, structure no. 1 (202-51330)LS1$88,000$428,982$95,000$607,572$60,000$650,000
0017Present structure, remove, structure no. 2 (202-51330)LS1$88,000$428,982$95,000$607,572$50,000$650,000
0018Slopewall, remove (202-51368)SYS1,500$5.25$5.00$10.00$12.14$15.00$11.00
0019Fence, farm field, remove (202-99187)LFT284$5.00$5.00$5.00$5.00$5.00$5.00
0020Excavation, common (203-02000)CYS12,645$39.00$5.00$45.00$42.16$35.00$55.00
0021Borrow (203-02070)CYS1,065$45.00$0.01$0.01$277.45$50.00$110.00
0022Stormwater management budget (205-12108)DOL66,300$1.00$1.00$1.00$1.00$1.00$1.00
0023Stormwater management implementation (205-12616)LS1$12,000$20,000$53,993$18,299$10,000$85,000
0024SWQCP preparation (205-12618)LS1$2,200.00$2,300.00$4,200.00$2,510.00$5,000.00$3,400.00
0025Subgrade treatment, type II (207-08264)SYS45,931$11.50$15.00$18.00$7.24$21.00$17.00
0026Subgrade treatment, type ibc (207-12635)SYS9,604$12.50$14.00$12.10$21.51$12.00$25.00
0027B borrow (211-02050)CYS2,170$82.00$37.00$53.00$58.01$40.00$120.00
0028Structure backfill, type 2 (211-09265)CYS5,090$82.00$78.00$80.00$58.01$70.00$185.00
0029Structure backfill, type 3 (211-09266)CYS1,800$82.00$36.00$80.00$58.01$30.00$185.00
0030Geogrid, type IB (214-11796)SYS800$3.25$1.00$2.00$1.12$5.00$4.00
0031Geotextile for pavement, type 2B (214-12239)SYS25,707$2.75$3.50$1.50$2.14$5.00$4.50
0032Compacted aggregate, no. 8 (301-12233)CYS150$87.00$100.00$80.00$123.55$160.00$135.00
0033Compacted aggregate, no. 53 (301-12234)CYS1,482$60.00$75.00$80.00$84.61$100.00$90.00
0034Widening with HMA, type D (304-07789)TON7,248$120.00$123.00$100.00$61.09$110.00$90.00
0035Milling, asphalt, 1 1/2 in. (306-08034)SYS13,005$2.50$1.80$4.00$4.34$3.00$10.00
0036Milling, transition (306-08043)SYS532$16.50$8.00$22.00$11.80$20.00$30.00
0038QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009)TON1,351$153.00$142.00$140.00$145.39$142.00$142.51
0039QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045)TON1,198$117.00$105.00$100.00$131.11$105.00$105.38
0040QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048)TON5,270$104.00$87.00$82.00$109.82$87.00$87.31
0041QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067)TON1,308$101.00$102.00$98.00$126.46$102.00$102.37
0042Joint adhesive (401-11526)LFT19,605$2.20$0.10$0.20$0.82$0.10$0.10
0043Void reducing asphalt membrane for HMA (401-12439)LFT35,870$3.85$3.85$1.75$3.85$3.85$3.85
0044HMA for temporary pavement, type D (402-10087)TON16,406$110.00$96.00$123.00$134.70$110.00$107.47
0045Asphalt for tack coat (406-05520)TON65$800.00$0.01$0.01$0.01$0.01$0.01
0046Cracks in asphalt pavement, fill (408-12028)TON4$1,445.00$1,250.00$1,250.00$1,315.24$1,250.00$1,254.50
0047Guardrail, remove (601-02241)LFT4,593$2.25$2.25$2.25$2.25$2.25$2.25
0048Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT4,107$22.00$22.00$22.00$22.00$22.00$22.00
0049Guardrail, MGS W-beam, cable terminal anchor (601-12294)EACH2$1,100.00$1,100.00$1,100.00$1,100.00$1,100.00$1,100.00
0050Guardrail end treatment, type OS (601-94689)EACH2$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00
0051Fence, farm field, 47 in. (603-06040)LFT376$22.00$22.00$22.00$22.00$22.00$22.00
0052Milled HMA corrugations, conventional (606-12399)LFT33,408$1.05$0.22$1.05$2.09$0.81$1.50
0053Right-of-way marker (615-06490)EACH4$175.00$175.00$175.00$175.00$175.00$175.00
0054Monument, type B (615-06505)EACH2$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00
0055Mobilization and demobilization for seeding (621-01004)EACH1$500.00$550.00$500.00$550.00$2,000.00$550.00
0056Erosion control blanket (621-02770)SYS3,214$1.75$3.25$1.75$3.25$15.00$3.25
0057Seed mixture, type U (621-06554)LBS1,150$6.50$4.98$6.50$4.98$7.00$4.98
0058Mulching material (621-06565)TON11$510.00$55.00$510.00$555.00$510.00$555.00
0059Water (621-06567)KGAL114$1.00$10.00$1.00$10.00$10.00$10.00
0060Sodding (621-06574)SYS2,683$5.00$5.15$5.00$5.15$15.00$5.15
0061Seed mixture, emergent wetland (621-06737)LBS4$125.00$244.00$125.00$244.00$125.00$244.00
0062Cable barrier system, type TL-4 (627-09327)LFT6,075$22.00$22.00$22.00$22.00$22.00$22.00
0063Safety terminal, type TL-3 (627-09330)EACH4$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
0064Field office, type C (628-09403)MOS18$3,700.00$2,900.00$4,850.00$3,509.51$4,000.00$3,500.00
0065Topsoil processing and distribution (629-000149)SYS31,003$4.50$3.90$3.50$2.06$5.00$15.00
0066Topsoil amendment budget (629-000150)DOL62,006$1.00$1.00$1.00$1.00$1.00$1.00
0067Temporary shoring , bridge no 1 (702-04325)LS1$18,500$30,000$18,782$1.03$75,000$125,000
0068Waterproofing membrane, type 2 (714-000086)SFT10,422$3.50$2.57$2.00$2.66$3.00$6.00
0069Pipe, type 4, circular, diameter 6 in. (715-05048)LFT4,016$9.00$19.49$9.00$9.00$9.00$24.00
0070Pipe, underdrain outlet, diameter 6 in. (715-05053)LFT240$32.00$47.00$32.00$32.00$32.00$45.00
0071Pipe, type 1, circular, diameter 18 in. (715-05121)LFT228$61.00$32.00$125.00$92.82$160.00$90.00
0072Pipe, slotted drain, diameter 12 in. , 0.079 in thickness, temporary (715-05422)LFT1,980$134.00$121.00$85.88$142.45$200.00$195.00
0073Pipe end section, diameter 18 in. (715-46010)EACH2$533.00$725.00$3,500.00$1,169.61$3,000.00$1,500.00
0074Outlet protector, type 1 (718-06528)EACH16$3,150.00$1,000.00$3,150.00$3,191.35$3,000.00$2,000.00
0075Video inspection for underdrain (718-06532)LFT3,000$1.50$1.50$1.50$1.50$1.50$1.50
0076Geotextile for underdrains, type 1A (718-12305)SYS2,090$4.15$2.50$4.15$4.15$5.00$1.00
0077Aggregate for underdrains (718-52610)CYS190$95.00$95.00$95.00$95.00$95.00$85.00
0078Structure, reinforced concrete, three-sided (723-12978)LFT195$4,355.00$8,500.00$5,860.00$5,830.43$4,800.00$6,000.00
0079Temporary wire-facing (735-10241)SFT5,606$9.60$4.25$5.50$9.91$8.91$16.00
0080Temporary wall erection (735-10242)SFT5,606$12.00$5.00$5.50$21.30$5.00$18.00
0081Construction sign, type C (801-03290)EACH12$242.00$225.00$225.00$225.00$242.00$225.00
0082Construction sign, type D (801-03291)EACH16$263.00$155.00$155.00$155.00$263.00$155.00
0083Temporary pavement marking, removable, 6 in. (801-06209)LFT176,974$1.97$1.90$1.00$1.90$2.00$1.90
0084Construction sign, type A (801-06640)EACH58$211.00$145.00$145.00$145.00$211.00$145.00
0085Temporary raised pavement marker, grade 1 (801-06649)EACH3,282$8.48$5.00$5.00$5.00$10.00$5.00
0086Flashing arrow sign (801-06710)DAY312$15.00$18.00$18.00$18.00$15.00$18.00
0087Maintaining traffic (801-06775)LS1$111,701$300,000$607,800$175,012$1,049,749$1,210,150
0088Energy absorbing terminal, CZ, TL-3 (801-07024)EACH6$5,200.00$12,500$7,033.33$7,766.67$6,920.00$8,500.00
0089Temporary traffic barrier, type 1 (801-08400)LFT4,885$24.00$10.00$16.00$10.58$77.25$25.00
0090Temporary traffic barrier, type 2 (801-08401)LFT14,642$46.00$25.00$44.00$38.28$90.05$45.00
0091Temporary traffic barrier, anchored, type 2 (801-08508)LFT454$60.00$35.00$44.00$46.56$85.20$60.00
0092Portable changeable message sign (801-11642)EACH4$3,293.00$3,200.00$3,200.00$3,200.00$3,500.00$3,200.00
0093Truck mounted attenuator (801-12042)DAY36$1,275.00$275.00$1,442.63$1,290.00$550.00$500.00
0094Law enforcement officer (801-12324)HRS96$75.00$75.00$75.00$75.00$75.00$75.00
0095Temporary worksite speed limit sign assembly, continuous (801-12883)EACH12$892.00$475.00$475.00$475.00$892.00$475.00
0096Temporary buzz strips (801-97643)LFT1,152$20.00$17.00$17.00$17.00$20.00$17.00
0097Line, remove (808-06716)LFT48,762$0.55$0.32$0.32$0.32$0.54$0.32
0098Retro-reflectivity testing (808-09381)LS1$2,500.00$4,500.00$4,500.00$4,500.00$2,500.00$4,500.00
0099Grooving for pavement markings (808-12032)LFT37,585$0.61$0.25$0.25$0.25$0.61$0.25
0100Line, thermoplastic, solid, white, 6 in. (808-75043)LFT16,524$0.91$0.55$0.55$0.55$0.91$0.55
0101Line, preformed plastic, broken, white, 6 in. (808-75055)LFT4,177$7.90$5.15$5.15$5.15$7.89$5.15
0102Line, thermoplastic, solid, yellow, 6 in. (808-75247)LFT16,884$1.00$0.55$0.55$0.55$0.91$0.55
0103Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297)LFT10$12.25$24.00$24.00$24.00$12.21$24.00
0104Snowplowable raised pavement marker, remove (808-75996)EACH210$18.00$28.00$10.00$7.75$18.00$28.00
0105Snowplowable raised pavement marker (808-75998)EACH210$36.00$32.00$32.00$32.00$35.21$32.00
0106Compacted aggregate, no. 53 (303-01180)TON1,502$37.00$80.00$50.00$45.02$80.00$85.00
0107QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001)TON484$128.00$100.00$100.00$115.34$100.00$100.36
INDOT contract B-43499-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy