INDOT contract B-43499-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on October 7, 2026, Madison, Greenfield. 6 bids received; low bid $10,876,500 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 106
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $10,876,500 | Low |
| 2 | Superior Construction Co Inc | $11,212,008 | +3.0% |
| 3 | E & B Paving LLC | $12,187,547 | +12% |
| 4 | Rieth-Riley Construction Co., Inc. | $12,254,429 | +13% |
| 5 | Morphey Construction Inc. | $13,200,000 | +21% |
| 6 | Beaty Construction Inc | $15,759,704 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Superior Construction Co Inc | 3. E & B Paving LLC | 4. Rieth-Riley Construction Co., Inc. | 5. Morphey Construction Inc. | 6. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $55,000 | $135,000 | $185,000 | $28,650 | $50,000 | $110,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $535,500 | $550,000 | $889,384 | $841,201 | $660,000 | $798,500 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $107,000 | $100,000 | $377,364 | $24,628 | $100,000 | $156,700 |
| 0013 | Pavement removal (202-02240) | SYS | 4,260 | $13.75 | $18.70 | $50.00 | $21.91 | $20.00 | $25.00 |
| 0014 | Cable barrier, remove (202-12024) | LFT | 5,840 | $1.50 | $1.50 | $1.50 | $1.50 | $2.00 | $1.50 |
| 0015 | Safety terminal, remove (202-12026) | EACH | 4 | $250.00 | $250.00 | $250.00 | $250.00 | $500.00 | $1,000.00 |
| 0016 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $88,000 | $428,982 | $95,000 | $607,572 | $60,000 | $650,000 |
| 0017 | Present structure, remove, structure no. 2 (202-51330) | LS | 1 | $88,000 | $428,982 | $95,000 | $607,572 | $50,000 | $650,000 |
| 0018 | Slopewall, remove (202-51368) | SYS | 1,500 | $5.25 | $5.00 | $10.00 | $12.14 | $15.00 | $11.00 |
| 0019 | Fence, farm field, remove (202-99187) | LFT | 284 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0020 | Excavation, common (203-02000) | CYS | 12,645 | $39.00 | $5.00 | $45.00 | $42.16 | $35.00 | $55.00 |
| 0021 | Borrow (203-02070) | CYS | 1,065 | $45.00 | $0.01 | $0.01 | $277.45 | $50.00 | $110.00 |
| 0022 | Stormwater management budget (205-12108) | DOL | 66,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $12,000 | $20,000 | $53,993 | $18,299 | $10,000 | $85,000 |
| 0024 | SWQCP preparation (205-12618) | LS | 1 | $2,200.00 | $2,300.00 | $4,200.00 | $2,510.00 | $5,000.00 | $3,400.00 |
| 0025 | Subgrade treatment, type II (207-08264) | SYS | 45,931 | $11.50 | $15.00 | $18.00 | $7.24 | $21.00 | $17.00 |
| 0026 | Subgrade treatment, type ibc (207-12635) | SYS | 9,604 | $12.50 | $14.00 | $12.10 | $21.51 | $12.00 | $25.00 |
| 0027 | B borrow (211-02050) | CYS | 2,170 | $82.00 | $37.00 | $53.00 | $58.01 | $40.00 | $120.00 |
| 0028 | Structure backfill, type 2 (211-09265) | CYS | 5,090 | $82.00 | $78.00 | $80.00 | $58.01 | $70.00 | $185.00 |
| 0029 | Structure backfill, type 3 (211-09266) | CYS | 1,800 | $82.00 | $36.00 | $80.00 | $58.01 | $30.00 | $185.00 |
| 0030 | Geogrid, type IB (214-11796) | SYS | 800 | $3.25 | $1.00 | $2.00 | $1.12 | $5.00 | $4.00 |
| 0031 | Geotextile for pavement, type 2B (214-12239) | SYS | 25,707 | $2.75 | $3.50 | $1.50 | $2.14 | $5.00 | $4.50 |
| 0032 | Compacted aggregate, no. 8 (301-12233) | CYS | 150 | $87.00 | $100.00 | $80.00 | $123.55 | $160.00 | $135.00 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,482 | $60.00 | $75.00 | $80.00 | $84.61 | $100.00 | $90.00 |
| 0034 | Widening with HMA, type D (304-07789) | TON | 7,248 | $120.00 | $123.00 | $100.00 | $61.09 | $110.00 | $90.00 |
| 0035 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 13,005 | $2.50 | $1.80 | $4.00 | $4.34 | $3.00 | $10.00 |
| 0036 | Milling, transition (306-08043) | SYS | 532 | $16.50 | $8.00 | $22.00 | $11.80 | $20.00 | $30.00 |
| 0038 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 1,351 | $153.00 | $142.00 | $140.00 | $145.39 | $142.00 | $142.51 |
| 0039 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 1,198 | $117.00 | $105.00 | $100.00 | $131.11 | $105.00 | $105.38 |
| 0040 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 5,270 | $104.00 | $87.00 | $82.00 | $109.82 | $87.00 | $87.31 |
| 0041 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 1,308 | $101.00 | $102.00 | $98.00 | $126.46 | $102.00 | $102.37 |
| 0042 | Joint adhesive (401-11526) | LFT | 19,605 | $2.20 | $0.10 | $0.20 | $0.82 | $0.10 | $0.10 |
| 0043 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 35,870 | $3.85 | $3.85 | $1.75 | $3.85 | $3.85 | $3.85 |
| 0044 | HMA for temporary pavement, type D (402-10087) | TON | 16,406 | $110.00 | $96.00 | $123.00 | $134.70 | $110.00 | $107.47 |
| 0045 | Asphalt for tack coat (406-05520) | TON | 65 | $800.00 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0046 | Cracks in asphalt pavement, fill (408-12028) | TON | 4 | $1,445.00 | $1,250.00 | $1,250.00 | $1,315.24 | $1,250.00 | $1,254.50 |
| 0047 | Guardrail, remove (601-02241) | LFT | 4,593 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 0048 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 4,107 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0049 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 2 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 0050 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0051 | Fence, farm field, 47 in. (603-06040) | LFT | 376 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0052 | Milled HMA corrugations, conventional (606-12399) | LFT | 33,408 | $1.05 | $0.22 | $1.05 | $2.09 | $0.81 | $1.50 |
| 0053 | Right-of-way marker (615-06490) | EACH | 4 | $175.00 | $175.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 0054 | Monument, type B (615-06505) | EACH | 2 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0055 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $500.00 | $550.00 | $500.00 | $550.00 | $2,000.00 | $550.00 |
| 0056 | Erosion control blanket (621-02770) | SYS | 3,214 | $1.75 | $3.25 | $1.75 | $3.25 | $15.00 | $3.25 |
| 0057 | Seed mixture, type U (621-06554) | LBS | 1,150 | $6.50 | $4.98 | $6.50 | $4.98 | $7.00 | $4.98 |
| 0058 | Mulching material (621-06565) | TON | 11 | $510.00 | $55.00 | $510.00 | $555.00 | $510.00 | $555.00 |
| 0059 | Water (621-06567) | KGAL | 114 | $1.00 | $10.00 | $1.00 | $10.00 | $10.00 | $10.00 |
| 0060 | Sodding (621-06574) | SYS | 2,683 | $5.00 | $5.15 | $5.00 | $5.15 | $15.00 | $5.15 |
| 0061 | Seed mixture, emergent wetland (621-06737) | LBS | 4 | $125.00 | $244.00 | $125.00 | $244.00 | $125.00 | $244.00 |
| 0062 | Cable barrier system, type TL-4 (627-09327) | LFT | 6,075 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0063 | Safety terminal, type TL-3 (627-09330) | EACH | 4 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 0064 | Field office, type C (628-09403) | MOS | 18 | $3,700.00 | $2,900.00 | $4,850.00 | $3,509.51 | $4,000.00 | $3,500.00 |
| 0065 | Topsoil processing and distribution (629-000149) | SYS | 31,003 | $4.50 | $3.90 | $3.50 | $2.06 | $5.00 | $15.00 |
| 0066 | Topsoil amendment budget (629-000150) | DOL | 62,006 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0067 | Temporary shoring , bridge no 1 (702-04325) | LS | 1 | $18,500 | $30,000 | $18,782 | $1.03 | $75,000 | $125,000 |
| 0068 | Waterproofing membrane, type 2 (714-000086) | SFT | 10,422 | $3.50 | $2.57 | $2.00 | $2.66 | $3.00 | $6.00 |
| 0069 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 4,016 | $9.00 | $19.49 | $9.00 | $9.00 | $9.00 | $24.00 |
| 0070 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 240 | $32.00 | $47.00 | $32.00 | $32.00 | $32.00 | $45.00 |
| 0071 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 228 | $61.00 | $32.00 | $125.00 | $92.82 | $160.00 | $90.00 |
| 0072 | Pipe, slotted drain, diameter 12 in. , 0.079 in thickness, temporary (715-05422) | LFT | 1,980 | $134.00 | $121.00 | $85.88 | $142.45 | $200.00 | $195.00 |
| 0073 | Pipe end section, diameter 18 in. (715-46010) | EACH | 2 | $533.00 | $725.00 | $3,500.00 | $1,169.61 | $3,000.00 | $1,500.00 |
| 0074 | Outlet protector, type 1 (718-06528) | EACH | 16 | $3,150.00 | $1,000.00 | $3,150.00 | $3,191.35 | $3,000.00 | $2,000.00 |
| 0075 | Video inspection for underdrain (718-06532) | LFT | 3,000 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 0076 | Geotextile for underdrains, type 1A (718-12305) | SYS | 2,090 | $4.15 | $2.50 | $4.15 | $4.15 | $5.00 | $1.00 |
| 0077 | Aggregate for underdrains (718-52610) | CYS | 190 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 | $85.00 |
| 0078 | Structure, reinforced concrete, three-sided (723-12978) | LFT | 195 | $4,355.00 | $8,500.00 | $5,860.00 | $5,830.43 | $4,800.00 | $6,000.00 |
| 0079 | Temporary wire-facing (735-10241) | SFT | 5,606 | $9.60 | $4.25 | $5.50 | $9.91 | $8.91 | $16.00 |
| 0080 | Temporary wall erection (735-10242) | SFT | 5,606 | $12.00 | $5.00 | $5.50 | $21.30 | $5.00 | $18.00 |
| 0081 | Construction sign, type C (801-03290) | EACH | 12 | $242.00 | $225.00 | $225.00 | $225.00 | $242.00 | $225.00 |
| 0082 | Construction sign, type D (801-03291) | EACH | 16 | $263.00 | $155.00 | $155.00 | $155.00 | $263.00 | $155.00 |
| 0083 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 176,974 | $1.97 | $1.90 | $1.00 | $1.90 | $2.00 | $1.90 |
| 0084 | Construction sign, type A (801-06640) | EACH | 58 | $211.00 | $145.00 | $145.00 | $145.00 | $211.00 | $145.00 |
| 0085 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 3,282 | $8.48 | $5.00 | $5.00 | $5.00 | $10.00 | $5.00 |
| 0086 | Flashing arrow sign (801-06710) | DAY | 312 | $15.00 | $18.00 | $18.00 | $18.00 | $15.00 | $18.00 |
| 0087 | Maintaining traffic (801-06775) | LS | 1 | $111,701 | $300,000 | $607,800 | $175,012 | $1,049,749 | $1,210,150 |
| 0088 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 6 | $5,200.00 | $12,500 | $7,033.33 | $7,766.67 | $6,920.00 | $8,500.00 |
| 0089 | Temporary traffic barrier, type 1 (801-08400) | LFT | 4,885 | $24.00 | $10.00 | $16.00 | $10.58 | $77.25 | $25.00 |
| 0090 | Temporary traffic barrier, type 2 (801-08401) | LFT | 14,642 | $46.00 | $25.00 | $44.00 | $38.28 | $90.05 | $45.00 |
| 0091 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 454 | $60.00 | $35.00 | $44.00 | $46.56 | $85.20 | $60.00 |
| 0092 | Portable changeable message sign (801-11642) | EACH | 4 | $3,293.00 | $3,200.00 | $3,200.00 | $3,200.00 | $3,500.00 | $3,200.00 |
| 0093 | Truck mounted attenuator (801-12042) | DAY | 36 | $1,275.00 | $275.00 | $1,442.63 | $1,290.00 | $550.00 | $500.00 |
| 0094 | Law enforcement officer (801-12324) | HRS | 96 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0095 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 12 | $892.00 | $475.00 | $475.00 | $475.00 | $892.00 | $475.00 |
| 0096 | Temporary buzz strips (801-97643) | LFT | 1,152 | $20.00 | $17.00 | $17.00 | $17.00 | $20.00 | $17.00 |
| 0097 | Line, remove (808-06716) | LFT | 48,762 | $0.55 | $0.32 | $0.32 | $0.32 | $0.54 | $0.32 |
| 0098 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $2,500.00 | $4,500.00 |
| 0099 | Grooving for pavement markings (808-12032) | LFT | 37,585 | $0.61 | $0.25 | $0.25 | $0.25 | $0.61 | $0.25 |
| 0100 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 16,524 | $0.91 | $0.55 | $0.55 | $0.55 | $0.91 | $0.55 |
| 0101 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 4,177 | $7.90 | $5.15 | $5.15 | $5.15 | $7.89 | $5.15 |
| 0102 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 16,884 | $1.00 | $0.55 | $0.55 | $0.55 | $0.91 | $0.55 |
| 0103 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 10 | $12.25 | $24.00 | $24.00 | $24.00 | $12.21 | $24.00 |
| 0104 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 210 | $18.00 | $28.00 | $10.00 | $7.75 | $18.00 | $28.00 |
| 0105 | Snowplowable raised pavement marker (808-75998) | EACH | 210 | $36.00 | $32.00 | $32.00 | $32.00 | $35.21 | $32.00 |
| 0106 | Compacted aggregate, no. 53 (303-01180) | TON | 1,502 | $37.00 | $80.00 | $50.00 | $45.02 | $80.00 | $85.00 |
| 0107 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 484 | $128.00 | $100.00 | $100.00 | $115.34 | $100.00 | $100.36 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.