INDOT contract B-43609-A bid tabulation
BRIDGE DECK REPLACEMENT. Let by Indiana DOT on March 11, 2026, Tippecanoe, Crawfordsville. 5 bids received; low bid $9,069,000 by Icc Group Inc.
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 122
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Icc Group Inc | $9,069,000 | Low |
| 2 | Superior Construction Co Inc | $9,593,086 | +6.0% |
| 3 | Milestone Contractors LP | $10,289,440 | +13% |
| 4 | Pontem Contractors Inc | $10,813,021 | +19% |
| 5 | Beaty Construction Inc | $10,814,500 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Icc Group Inc | 2. Superior Construction Co Inc | 3. Milestone Contractors LP | 4. Pontem Contractors Inc | 5. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $40,000 | $100,000 | $32,000 | $37,800 | $80,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $441,100 | $440,000 | $519,470 | $542,072 | $520,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $81,000 | $30,000 | $103,894 | $39,798 | $100,000 |
| 0011 | Pavement removal (202-02240) | SYS | 169 | $131.00 | $20.00 | $34.00 | $33.38 | $39.00 |
| 0012 | Gutter turnout, reinforced concrete, remove (202-02276) | EACH | 4 | $404.00 | $200.00 | $318.00 | $1,119.65 | $55.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $1,265,160 | $1,650,069 | $2,006,650 | $3,358,908 | $2,500,000 |
| 0014 | Excavation, common (203-02000) | CYS | 1,570 | $60.00 | $36.00 | $82.00 | $32.40 | $63.00 |
| 0015 | Borrow (203-02070) | CYS | 6,445 | $55.00 | $5.00 | $43.00 | $37.80 | $32.00 |
| 0016 | Settlement plate (204-02290) | EACH | 4 | $2,500.00 | $1,000.00 | $1,250.00 | $1,620.00 | $2,000.00 |
| 0017 | Stormwater management budget (205-12108) | DOL | 67,448 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $27,336 | $30,000 | $2,450.00 | $104,813 | $32,000 |
| 0019 | SWQCP preparation (205-12618) | LS | 1 | $3,200.00 | $2,200.00 | $5,400.00 | $5,211.31 | $3,000.00 |
| 0020 | Excavation, foundation, unclassified (206-51230) | CYS | 160 | $40.00 | $40.00 | $100.00 | $68.32 | $33.00 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 4,354 | $30.00 | $18.00 | $16.50 | $22.68 | $14.00 |
| 0022 | Subgrade treatment, type III (207-08266) | SYS | 2,184 | $3.00 | $4.00 | $9.00 | $7.56 | $3.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 472 | $68.00 | $29.00 | $46.50 | $59.40 | $32.00 |
| 0024 | Aggregate for end bent backfill (211-06467) | CYS | 58 | $150.00 | $132.00 | $200.00 | $139.81 | $94.00 |
| 0025 | Structure backfill, type 1 (211-09264) | CYS | 92 | $120.00 | $50.00 | $112.00 | $72.36 | $23.00 |
| 0026 | Structure backfill, type 2 (211-09265) | CYS | 116 | $129.00 | $88.00 | $116.00 | $108.00 | $92.00 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 466 | $5.00 | $4.00 | $7.50 | $4.32 | $7.00 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,276 | $116.00 | $100.00 | $100.00 | $105.84 | $66.00 |
| 0029 | Subbase for PCCP (302-06464) | CYS | 108 | $280.00 | $92.00 | $165.00 | $231.49 | $110.00 |
| 0030 | Milling, asphalt, 2 in. (306-08036) | SYS | 1,385 | $7.00 | $2.50 | $10.00 | $7.05 | $7.00 |
| 0031 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 220 | $136.00 | $136.00 | $101.20 | $146.88 | $136.00 |
| 0032 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 868 | $109.00 | $109.00 | $105.00 | $117.72 | $109.00 |
| 0033 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 934 | $87.00 | $87.00 | $111.00 | $93.96 | $87.00 |
| 0034 | Joint adhesive (401-11526) | LFT | 2,030 | $1.50 | $1.50 | $0.30 | $1.62 | $1.50 |
| 0035 | Asphalt for tack coat (406-05520) | TON | 3 | $1.00 | $1.00 | $600.00 | $1.08 | $1.50 |
| 0036 | QC/QA-HMA, 4, 58E, surface, 9.5 MM - SMA (410-000073) | TON | 487 | $145.00 | $145.00 | $161.00 | $156.60 | $145.00 |
| 0037 | D-1 contraction joint (503-05240) | LFT | 58 | $22.23 | $33.00 | $55.00 | $32.71 | $20.00 |
| 0038 | Jointed reinforced concrete pavement, 12 in. (503-12476) | SYS | 126 | $180.00 | $160.00 | $370.00 | $296.41 | $345.00 |
| 0039 | Terminal joint, type PCCP (503-12478) | LFT | 74 | $290.00 | $220.00 | $320.00 | $359.71 | $295.00 |
| 0040 | Expansion joint with load transfer (503-12479) | LFT | 58 | $51.00 | $40.00 | $35.00 | $86.35 | $90.00 |
| 0041 | Guardrail, remove (601-02241) | LFT | 2,922 | $3.50 | $3.50 | $3.75 | $3.78 | $2.75 |
| 0042 | Guardrail terminal system, W-beam, curved, type 7 (601-05071) | EACH | 1 | $3,400.00 | $3,400.00 | $3,300.00 | $3,672.00 | $3,200.00 |
| 0043 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 2,958 | $20.00 | $20.00 | $22.00 | $21.60 | $19.00 |
| 0044 | Guardrail transition, MGS with curb (601-12291) | EACH | 4 | $3,175.00 | $3,175.00 | $3,600.00 | $3,429.00 | $3,195.00 |
| 0045 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,075.00 | $3,075.00 | $2,900.00 | $3,321.00 | $2,120.00 |
| 0046 | Barrier delineator (602-06729) | EACH | 62 | $24.00 | $21.94 | $70.00 | $145.67 | $38.00 |
| 0047 | HMA for sidewalk (604-05528) | TON | 504 | $100.00 | $100.00 | $125.00 | $108.00 | $100.00 |
| 0048 | Handrail, steel , stairway (604-92237) | LFT | 100 | $255.00 | $260.00 | $345.00 | $275.40 | $335.00 |
| 0049 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 2,241 | $6.25 | $1.07 | $0.75 | $0.81 | $1.25 |
| 0050 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 170.40 | $200.00 | $130.00 | $245.00 | $216.66 | $263.00 |
| 0051 | Plaque (615-08351) | EACH | 1 | $5,000.00 | $1,400.00 | $2,500.00 | $1,847.39 | $1,700.00 |
| 0052 | Riprap, revetment (616-06405) | TON | 973 | $75.00 | $60.00 | $95.00 | $108.00 | $77.00 |
| 0053 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,631 | $5.00 | $3.00 | $1.40 | $3.24 | $5.00 |
| 0054 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $379,800 | $1,500,000 | $450,000 | $432,000 | $529,000 |
| 0055 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $23,000 | $15,000 | $20,000 | $108,000 | $55,000 |
| 0056 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $351,709 | $172,500 | $180,000 | $108,000 | $172,000 |
| 0057 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $800.00 | $425.00 | $425.00 | $1,026.00 | $425.00 |
| 0058 | Erosion control blanket (621-02770) | SYS | 9,145 | $1.65 | $1.38 | $1.40 | $1.41 | $1.38 |
| 0059 | Fertilizer for permanent seeding (621-06545) | TON | 1.70 | $800.00 | $100.00 | $100.00 | $621.00 | $100.00 |
| 0060 | Seed mixture, type R (621-06553) | LBS | 643 | $13.00 | $5.55 | $5.55 | $10.51 | $5.50 |
| 0061 | Mulching material (621-06565) | TON | 6 | $675.00 | $598.00 | $598.00 | $510.84 | $598.00 |
| 0062 | Field office, type C (628-09403) | MOS | 15 | $2,310.00 | $2,500.00 | $4,800.00 | $3,479.06 | $4,000.00 |
| 0063 | Mobile internet service , 1 each (628-09409) | MOS | 15 | $300.00 | $100.00 | $125.00 | $351.60 | $120.00 |
| 0064 | Computer system equipment (628-11976) | EACH | 2 | $2,925.00 | $500.00 | $500.00 | $1,173.33 | $1,500.00 |
| 0065 | Computer system (628-11977) | EACH | 1 | $1,350.00 | $500.00 | $1,000.00 | $2,502.48 | $1,500.00 |
| 0066 | Topsoil processing and distribution (629-000149) | SYS | 18,307 | $3.25 | $5.00 | $8.20 | $8.61 | $0.50 |
| 0067 | Topsoil amendment budget (629-000150) | DOL | 36,614 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0068 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 26 | $2,000.00 | $2,230.00 | $1,700.00 | $2,119.15 | $2,500.00 |
| 0069 | Concrete, A, substructure (702-51005) | CYS | 35.90 | $2,900.00 | $1,800.00 | $2,800.00 | $2,373.73 | $2,700.00 |
| 0070 | Concrete, B, footings (702-51015) | CYS | 21.10 | $770.00 | $750.00 | $800.00 | $1,219.97 | $900.00 |
| 0071 | Field drilled hole in concrete (702-51863) | EACH | 152 | $101.00 | $30.00 | $28.00 | $19.21 | $37.00 |
| 0072 | Concrete, C, substructure (702-92857) | CYS | 46.90 | $3,750.00 | $1,200.00 | $3,000.00 | $1,379.19 | $2,600.00 |
| 0073 | Reinforcing bars (703-06028) | LBS | 3,915 | $1.50 | $1.30 | $1.80 | $1.57 | $1.62 |
| 0074 | Reinforcing bars, epoxy coated (703-06029) | LBS | 522,515 | $1.60 | $1.55 | $1.70 | $1.59 | $1.60 |
| 0075 | Bar splice (703-96512) | EACH | 36 | $295.00 | $140.00 | $140.00 | $156.86 | $140.00 |
| 0076 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 38 | $81.00 | $43.00 | $36.00 | $44.96 | $46.00 |
| 0077 | Concrete, C, superstructure, lightweight (704-01989) | CYS | 1,333.10 | $1,267.00 | $1,200.00 | $1,370.00 | $953.63 | $1,500.00 |
| 0078 | Railing , pedestrian (706-04683) | LFT | 1,238 | $280.00 | $320.00 | $432.00 | $302.40 | $410.00 |
| 0079 | Concrete bridge railing transition, type TPF-1 , modified (706-06351) | EACH | 4 | $9,500.00 | $12,000 | $9,700.00 | $5,561.18 | $6,700.00 |
| 0080 | Reinforced concrete moment slab, 12 in. (706-08496) | SYS | 134 | $200.00 | $170.00 | $365.00 | $231.53 | $270.00 |
| 0081 | Railing, concrete type PF-1 , lightweight (706-09962) | LFT | 2,359 | $107.00 | $107.00 | $95.00 | $156.16 | $125.00 |
| 0082 | Railing, steel type PF-1 (706-11404) | LFT | 1,146.75 | $68.00 | $72.00 | $115.00 | $73.44 | $87.00 |
| 0083 | Railing, steel type PF-1 , modified (706-11404) | LFT | 1,229.25 | $108.00 | $112.00 | $220.00 | $116.64 | $150.00 |
| 0084 | Structural member, concrete, I-beam, 45 in. X 16 in. , lightweight, install (707-05984) | LFT | 413 | $150.00 | $87.00 | $28.00 | $244.02 | $200.00 |
| 0085 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $26,124 | $4,800.00 | $2,300.00 | $16,849 | $1.00 |
| 0086 | Repair , girder splice pack rust (711-05728) | EACH | 16 | $987.50 | $1,000.00 | $4,500.00 | $3,114.76 | $4,938.00 |
| 0087 | Structural steel (711-51035) | LBS | 2,344 | $22.00 | $8.00 | $22.00 | $19.65 | $28.00 |
| 0088 | Drilled hole (711-51864) | EACH | 288 | $116.00 | $300.00 | $116.00 | $125.28 | $116.00 |
| 0089 | Jacking and supporting girders , bridge no. 1 (711-51878) | LS | 1 | $165,000 | $350,000 | $230,000 | $199,663 | $326,700 |
| 0090 | Stud shear connectors (711-96800) | EACH | 9,915 | $4.10 | $4.10 | $4.10 | $4.43 | $4.10 |
| 0091 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 19 | $305.00 | $172.00 | $270.00 | $291.60 | $142.00 |
| 0092 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 120 | $51.00 | $18.00 | $21.00 | $24.84 | $14.00 |
| 0093 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 10 | $110.00 | $43.00 | $72.00 | $108.00 | $42.00 |
| 0094 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 53 | $79.00 | $98.00 | $182.00 | $88.56 | $86.00 |
| 0095 | Video inspection for pipe (715-09064) | LFT | 132 | $50.00 | $23.00 | $25.00 | $26.62 | $40.00 |
| 0096 | Pipe end section, diameter 15 in. (715-46005) | EACH | 3 | $2,300.00 | $667.00 | $795.00 | $1,728.00 | $740.00 |
| 0097 | Pipe end section, diameter 36 in. (715-46040) | EACH | 1 | $3,300.00 | $1,500.00 | $2,800.00 | $2,160.00 | $1,025.00 |
| 0098 | Outlet protector, type 2 (718-06529) | EACH | 3 | $500.00 | $1,600.00 | $1,500.00 | $540.00 | $900.00 |
| 0099 | Geotextile for underdrains, type 1A (718-12305) | SYS | 50 | $17.00 | $11.00 | $11.00 | $1.89 | $7.00 |
| 0100 | Aggregate for underdrains (718-52610) | CYS | 5 | $850.00 | $57.00 | $300.00 | $108.00 | $290.00 |
| 0101 | Inlet, type E7 (720-45030) | EACH | 1 | $5,750.00 | $2,800.00 | $4,100.00 | $3,780.00 | $2,130.00 |
| 0102 | Inlet, type R13 (720-45075) | EACH | 2 | $5,800.00 | $3,500.00 | $4,500.00 | $4,860.00 | $2,300.00 |
| 0103 | Bridge expansion joint, type SS (724-12771) | LFT | 76 | $750.00 | $352.00 | $535.00 | $702.70 | $237.00 |
| 0104 | Bridge expansion joint, type M (724-12772) | LFT | 38 | $4,650.00 | $2,400.00 | $3,400.00 | $3,311.37 | $3,119.00 |
| 0105 | Bearing assembly, disc , expansion, install (726-12914) | EACH | 52 | $2,500.00 | $1,000.00 | $2,200.00 | $2,460.81 | $2,700.00 |
| 0106 | Bearing assembly, disc , fixed, install (726-12914) | EACH | 8 | $3,000.00 | $1,200.00 | $2,530.00 | $2,732.40 | $3,100.00 |
| 0107 | Bearing assembly, elastomeric , install (726-92406) | EACH | 24 | $1,130.00 | $750.00 | $1,745.00 | $1,881.36 | $1,975.00 |
| 0108 | Construction sign, type C (801-03290) | EACH | 2 | $249.00 | $249.00 | $250.00 | $270.00 | $250.00 |
| 0109 | Construction sign, type D (801-03291) | EACH | 3 | $270.00 | $270.00 | $200.00 | $216.00 | $200.00 |
| 0110 | Road closure sign assembly (801-04308) | EACH | 8 | $249.00 | $249.00 | $275.00 | $297.00 | $275.00 |
| 0111 | Detour route marker assembly (801-06625) | EACH | 36 | $157.00 | $157.00 | $120.00 | $129.60 | $120.00 |
| 0112 | Construction sign, type A (801-06640) | EACH | 23 | $216.00 | $216.00 | $165.00 | $178.20 | $165.00 |
| 0113 | Construction sign, type B (801-06645) | EACH | 2 | $108.00 | $108.00 | $100.00 | $108.00 | $100.00 |
| 0114 | Maintaining traffic (801-06775) | LS | 1 | $22,880 | $75,000 | $10,100 | $35,237 | $90,968 |
| 0115 | Barricade, type III-A (801-07118) | LFT | 160 | $15.66 | $15.66 | $15.00 | $16.20 | $15.00 |
| 0116 | Barricade, type III-B (801-07119) | LFT | 56 | $15.66 | $15.66 | $15.00 | $16.20 | $15.00 |
| 0117 | Bollard (802-03896) | EACH | 1 | $2,550.00 | $2,550.00 | $3,000.00 | $2,754.00 | $3,500.00 |
| 0118 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 4 | $72.70 | $200.00 | $350.00 | $48.60 | $45.00 |
| 0119 | Sign post, type A (802-76055) | LFT | 44 | $20.50 | $22.00 | $21.00 | $59.40 | $55.00 |
| 0120 | Sign, ground mounted, reset (802-91122) | EACH | 4 | $350.00 | $375.00 | $350.00 | $324.00 | $300.00 |
| 0121 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 4,550 | $0.38 | $0.38 | $0.60 | $0.65 | $0.60 |
| 0122 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 4,550 | $0.38 | $0.38 | $0.60 | $0.65 | $0.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.